Administrative Measures For Dust Pollution Prevention In Lanzhou

Original Language Title: 兰州市扬尘污染防治管理办法

Subscribe to a Global-Regulation Premium Membership Today!

Key Benefits:

Subscribe Now for only USD$40 per month.

Methodology for the management of dust pollution in the city of Land

(Summit No. 53 of 15 November 2013 of the Government of the Länder to discuss the adoption of Order No. 10 of 5 December 2013 of the People's Government Order No. 10 of 5 December 2014, effective 1 February 2014.

Article 1 provides for effective control of dust pollution, protection and improvement of the quality of the atmosphere, in accordance with the laws, regulations and regulations such as the Instruction of atmospheric pollution in the People's Republic of China, the Act on the Implementation of the Atmospheric Pollution Control in the Länder State, and the practice of the city.

Article II of this approach refers to atmospheric environmental contamination of air particles arising from construction works, construction demolitions, road cleaning, transport of solids and storage, unused integrated development projects, parking greenification activities or air particles arising from air particles such as cement.

The approach refers to the savings that can easily produce air particles, such as coal, sand, sand, grey, pulp, cement, building waste, engineering residues.

Article 3. This approach applies to the prevention and management of dust pollution within the city's administration.

Article IV Impunity is governed by the principles of government ownership, territorial management, sector regulation and public participation.

Article 5 Integrated administrative enforcement authorities in urban management are the integrated coordination sector for the management of dust pollution in the city, the organization responsible for this approach, the coordination and supervision of other relevant administrative departments to perform oversight functions.

In accordance with the principle of territorialization, the Government of the People of the District (zone) is responsible for the development and organization of the work programme for the control of dust pollution in the Territory, in accordance with the principle of territorialization.

The integrated administrative law enforcement authorities in urban management are responsible for the management of garbage, engineering residues and road clean-up pollution control.

The Environmental Protection Administration is responsible for environmental monitoring, monitoring and regular publication of environmental information on the state of dust contamination, and is responsible for the management of surveillance by industrial enterprises and stoves for the control of dust contamination, such as slots, sediments.

Urban-rural-building administrative authorities are responsible for the construction of housing construction works, construction of municipal infrastructure works, temporary exploitation of roads in urban areas, and supervision management of plant fire pollution control in the greening works.

The Government's transport management is responsible for the detection of road traffic offences for construction garbage, engineering saving vehicles, and for the clearance of the above-mentioned vehicle route and time of movement, which is not used in a sealed manner by the above-mentioned vehicles in line with the law enforcement authorities.

The National Land Resources Administration is responsible for the integrated development of the management of the management of the control of the use of the project to build fire pollution.

Housing security and property administration authorities are responsible for the management of the management of the house's removal of dust pollution.

Other relevant sectors are managed in accordance with their respective responsibilities for the control of dust pollution.

Article 6

People's governments and functional sectors should take appropriate measures to manage and control emergency response in accordance with the Government's atmospheric pollution early warning levels.

Article 7. Any unit and person shall be entitled to report and complain about acts that cause dust contamination, and the receiving entity shall communicate the results to the reporting person or the complainant.

Article 8. The construction shall be in line with the following anti-polluting requirements:

(i) Aclock is established in accordance with the norms around the construction site. More than 30 days of work will have to set a wall, and the work period can be built within 30 days. (b) In other road blocks, they may not be less than 1.8 m;

(ii) Grounds of construction work and roadways should be hard-calibreed and sprayed;

(iii) The installation of vehicle-clearing equipment at the entrance of the construction site, which must be accessible to the operating place in addition to cement, a clean-up of the washing, and the maintenance of the entrance and the surrounding cleaning;

(iv) Building garbage cannot be shipped in a timely manner within the prescribed time period, and should be covered within the construction site or other effective anti-lides measures;

(v) The construction operation with cement pulp should be equipped with the corresponding puls, cements, and the puls of puls. The use of sealed vehicles should be carried out;

(vi) The construction area shall prohibit the use of prefabricated concretes, prefabricanes, in accordance with the provisions;

(vii) In the event of the removal of engineering operations, spoiler measures should be taken to reduce the time for the operation of the dust; in the event of more than four waves, no coastal and dismantled operations;

(viii) Indoor storage materials, sands, soils, etc., should be used to cover anti-soil networks or to prevent slacks;

(ix) The transport of distributors, construction of garbage and residues on buildings, should be carried out in a closed manner, prohibiting high drops and promoting sub-Saharans.

Article 9. Construction, in addition to the provisions of article 8 of this approach, should be accompanied by an effective spoiler or abode of dust, which should be taken in the course of the demolition.

Article 10 Construction of municipal works, in addition to the provisions of article 8 of this approach, should also be in line with the following requirements for fire pollution control:

(i) The construction machinery should take measures such as spraying, spraying, etc. to prevent the contamination of dust when carrying out operations such as exhumation, crafting, rift, and fragmentation;

(ii) Removal construction of municipal works should be carried out in the form of exhumation, sub-recruitation, and in the case of back-to-refits, measures such as water and coverage should be taken to prevent dust contamination;

(iii) In the use of wind drilling ground or cleaning sites, ground-based water should be made available.

Article 11 dismantled construction, in addition to the provisions of article 8 of this approach, should also be carried out either by spraying water or by spraying, and the construction site must carry out wet law operations and be equipped with relevant anti-lides, such as spraying.

Article 12 Unusilized integrated development project works should pave the water purification line, the construction process and all construction constellations.

The main is hard-won, with the pre-positioning of water downturns, followed by uninterrupted spraying.

Article 13 vehicles transporting garbage and engineering residues should meet the following fire requirements:

(i) Transport vehicles should be cleaned and resilient in a timely manner prior to their departures and ensure that net vehicles are delivered;

(ii) Transport vehicles should be added to a complete shuttle transport without causing subsoil and dropbacks to roads.

Article 14.

To:

(i) The ground should be hardened;

(ii) The use of concrete walls or yards, with begging or other spoiler measures;

(iii) The use of pre-transmission equipment should be carried out in the form of feeding, loading and loading facilities such as dust, spraying, and the maintenance of the normal use of anti-lides facilities. Constraints such as spraying should be taken in the event of loading operations;

(iv) The establishment of a dedicated vehicle cleaning site at the Export Service, with a washing facility for transport vehicles.

Article 15. Harmony of roads should be in line with the following fire requests:

(i) The main roads, water spraying three times a day, cleaning at least one day and a second dry road, spraying two times a day and cleaning at least once every two days. Except for the weather below 4 degrees of rain and temperature;

(ii) It should be completed by 7 p.m. a day;

(iii) Over four times in winter temperatures, the main roads in the urban area should increase the number of spraying and spraying;

(iv) The main roads should be mechanicalized and others encourage mechanical clearance;

(v) The use of artificial means of cleaning should be consistent with the quality standards of sanitation operations in the city.

In open public places such as parking, vehicle stations, property rights units or operating units should be established to prevent dust contamination.

Article 16

(i) During the issuance of contaminated weather early warnings, the municipal authorities ceased to operate in such areas as a whole land, foreignment, and spoilers;

(ii) Planned trees should be removed. After tree planting, the remaining earth and other items should be completed on the same day, which should not be completed and should be covered; the exhumation of trees could not be planted within 48 hours, and the veterans and plantations should not be released directly, and measures such as coverage, water use should be taken;

(iii) Implementation of Article 8.

Article 17, which builds naked cement in the area, should be greened, hard-wit or covered. The responsible person shall be determined by:

(i) The naked cement area within the unit, which is responsible for;

(ii) naked cement in the area of residence, which is the responsibility of the enterprise or other management units of the material industry;

(iii) Municipal roads, public green naked nakeds, which are responsible for urban and rural-building administrative authorities;

(iv) The naked cement of the land reserve, which is the responsibility of the land reserve administration;

(v) The unused naked cement, which is the responsibility of the land-use owner;

(vi) Other cases provided for by law, regulations and regulations.

Article 18, in violation of article 16 of this approach, does not require the application of anti-star contamination measures by the Green Operations Unit, which is corrected by the municipal law enforcement authorities and refuses to change and impose a fine of more than three thousand dollars.

Article 19, in violation of the provisions of this approach, stipulates that the provisions of the law, regulations and regulations have been punished and are in accordance with their provisions.

Article 20, concerning the abuse of authority by the administrative authorities and their staff in the management of dust pollution, toys negligence, to favour private fraud and to give administrative treatment to the competent and other direct responsibilities directly responsible, in accordance with the law; and to hold criminal responsibility under the law.

Article 21

Note by the State of the Interior on the management of dust pollution

Need for development

In recent years, as the urbanization and industrialization process has accelerated, a variety of priority construction works have been built, with the full implementation of the development of the low-churt tunnels, the street rehabilitation, the rehabilitation of the old urban areas, resulting in construction, the increasing pollution of transport dust and becoming an important factor affecting the quality of environmental air in my city. In this regard, the Prince III of the Provincial Commission delivered an important note on 19 December 2012: “To continue to live with the people's satisfaction with the steadfast war, the overall war on atmospheric contamination in the Länder State, with greater morality and more effective measures”. In order to fully implement the deployment of provincial and municipal decision-making, the strengthening of the management of dust pollution, the establishment of a legal system for the management of sound fire pollution control, and the development of, as soon as possible, the introduction of the Rinland Consistency Control (hereinafter referred to as “the approach”) is not only necessary and urgent.

Sources developed by the Approach

The People's Republic of China Act on Atmospheric Pollution Control

Means of implementation of atmospheric pollution control in the city of Land

At the same time, reference has been made to government regulations such as the Southern Beni Metropolitan Consistency Control Management Approach, the Zhenhensan Road Pollution Control Management Approach, and the Modalities for Synergie Towns.

Approach development process

In order to effectively address the problems in the management of dust pollution, the municipal authorities have called for specific legislation to strengthen the management of dust pollution, enabling the management of dust pollution. In the process of developing the methodology, the drafting sector sought the views of legal experts and relevant units, and specialized expert advisory meetings, repeated studies and several easily copies. In the course of the review of the evidence and coordination of the changes, the Municipal Council of Rule of Law organized a demonstration, which was attended by the Provincial Council of Lawmakers, the Provincial Government Rule of Law, the Municipal Council of Law, the Industrial Council and the Ministry of Construction, Environment, Land, Public Security, Work Trust, Parking, etc., with the participation of legal experts from the University of Lang and the University of the State of Land. Based on the views sought by the Constitutives, it was suggested that the Municipal Council of Rule of Law had made a number of serious changes with the drafting unit to form the approach.

Key elements of the approach and issues requiring clarification

A total of 20 articles of the approach specifying matters such as scope of application, management, management principles, control requirements, legal responsibility.

Several issues that need to be noted are:

(i) Regulatory responsibilities. Article 5 of the approach stipulates that the Integrated Administrative Enforcement Authority for Urban Management is the integrated coordination sector for the management of dust pollution in the city, the organization responsible for this approach, and the coordination and supervision of other relevant administrative departments to perform oversight functions. In accordance with the spirit of the relevant documents such as the Lands' Government's Bulletin on further strengthening the management of urban dust pollution management, article 5 of the approach stipulates that the Government of the People of the District (zone) implements the integrated monitoring management of dust pollution control in the Territory, in accordance with the principle of territorialization, and is responsible for the development of a programme of work for the prevention and management of dust in the Territory. The approach also details the specific responsibilities of the relevant functional sectors to facilitate practical operation and accountability.

(ii) Requirements for fire pollution control. The approach presents clear fire protection requirements for engineering, construction, construction, municipal engineering, dismantling construction, unused integrated exploitation of project works, construction waste (engineered residues) transport vehicles, coal and savings, road safety operations, greenization operations, naked greening operations, open cement greenification (hardification).

(iii) Legal responsibility. Since the control of dust covered by this approach requires a clear provision in the top law that, in order to avoid duplication with the top law, the legal responsibility is expressed as “in violation of the provisions of this approach, the provisions of laws, regulations and regulations have been punished”.