Changchun Urban Bridge Management

Original Language Title: 长春市城市桥梁管理办法

Read the untranslated law here: http://www.chinalaw.gov.cn/article/fgkd/xfg/dfzfgz/201506/20150600399327.shtml

Changchun urban bridge management (Changchun City bridge management approach has been December 26, 2013 municipal government 12th times Executive Conference through December 26, 2013 Changchun Government makes 52nd, released since February 15, 2014 up purposes) first article to strengthening city bridge management, ensure city bridge of intact, and security and smooth, full play city bridge of using function, according to State City Road Management Ordinance, and Changchun Municipal facilities management Ordinance, about provides, combined this city actual,

    These measures are formulated.

Article within the scope of this regulation is applicable in the city of urban bridge (including ancillary equipment) maintenance, repair, test and evaluation, and management.

    This approach by said city bridge, is refers to connection or across City Road for vehicles, and pedestrian passage of bridge, including overpass, and viaduct, and people line Flyover, and culvert, and tunnel, built (frame) built real and deck drainage facilities, and bridge protection facilities, and bridge brand, and limited contains brand, and block wall, and slope, and sound barrier, and bridge lighting facilities, and treatment structure real, and bridgehead take Board and the bridge overload super limited monitoring, facilities.

Third municipal facilities departments in charge of urban bridge management.

Municipal facilities authority entrusted by the municipal facilities Department, in charge of the day-to-day management of city bridges.

    City planning, public safety, transportation, water, sanitation, landscaping and other relevant competent authorities, shall perform their respective duties well done according to law of urban bridge management related work.

    Article fourth of urban bridge management insisted on safety first, prevention, management, and conservation principles. Fifth city after the completion of the bridge, the construction unit shall organize a final acceptance.

Unqualified acceptance or acceptance shall not be delivered.

    Urban bridges when delivered, the construction unit shall transfer to the municipal facilities management related information, and in accordance with the municipal public security and traffic administration departments set up road signs, markings and other traffic safety facilities. Sixth city bridge to implement quality warranty system. The warranty period is one year from the date of delivery.

Quality problems occur within the warranty period, the unit is responsible for the warranty.

    Main structure of the bridge within the design life of the city, quality responsibility borne by the employer.

    Article seventh municipal facilities management should organize regular census of the city bridges, preparation of the annual plan for the city bridge maintenance, repair, and establish and improve the city bridge maintenance and repair records.

    Eighth government investment and construction of urban bridge by the municipal facilities management is responsible for the maintenance, repair and other investors to invest in the city bridge, within the prescribed period, the owner or investor is responsible for maintenance and repair. Nineth municipal facilities management organizations can be taken tenders or direct way to determine the city bridge maintenance, repair units.

City bridge maintenance, maintenance units should be commensurate with the scale of conservation professionals and conservation, maintenance team, equipped with special conservation, maintenance of vehicles and machinery and equipment, in accordance with the annual plan for the conservation, maintenance and related technical standards, specifications of urban bridge inspection and maintenance and repair.

    Municipal facilities management should strengthen the conservation, maintenance of engineering quality supervision and inspection to ensure urban bridges intact.

    Article tenth of municipal facilities management should establish and improve information management, timely maintenance, repair and inspection of records into the information management system.

11th city bridge maintenance and repair work should take security measures, setting up the necessary traffic safety facilities and safety warning signs, pedestrian and vehicle traffic safety.

    Urban bridge dedicated to the conservation, maintenance of vehicles shall use uniform logo, when emergency repairs, on the premise of ensuring security, but without the limitation of driving routes and driving directions.

12th vehicle through bridges should be in accordance with the city's municipal facilities management organization bridge restrictions on movement of tonnage, headroom sign provisions of traffic. Due to exceptional circumstances, restrictions on movement of goods total weight exceeds bridge-tonnage vehicles in traffic on a bridge in the city should be in front of the pass, to apply to the municipal facilities Department. Municipal facilities department upon receipt of the application, shall organize safety evaluation, and in accordance with the assessment requirements of urban bridge to take effective protective measures, approval of its cars and trucks.

    Assessment and reinforcement of security facilities costs, borne by the owner or use of the vehicle. 13th track, iron-wheeled vehicles are required to pass the city bridges should be in front of the pass, to the competent departments for examination and approval procedures of municipal facilities.

    Approval required to take security measures, according to the time and route, custody of the managers by ... 14th must bridge erecting pipelines and attachments, subject to the approval of the municipal facilities Department.

Erection of pipelines and attachments approved by the property unit is responsible for maintenance and repair.

    Bridge reconstruction, expansion of the city, erecting a pipeline appendages shall promptly and unconditionally removed, relocated pipelines and appendages. 15th temporary occupation of urban bridge clearance and construction jobs, piling up goods, shall be subject to the municipal facilities Department.

    May affect safety on the roads, should also be agreed by the municipal public security traffic Administrative Department.

16th bridge in the city within the boundaries of the security zone, the following actions are forbidden:

(A) the unauthorized occupation of urban bridge;

(B) damage, move, ancillary facilities and bridges of the city surveying markers;

(C) unauthorized dredging soil, construction, stacking materials, using fire facilities, installations or operations;

(D) set, hanging, post advertisements, slogans without authorization;

(V) construction of bridge function and safety of buildings and structures;

(F) tracked vehicles, iron wheels of car, truck gross vehicle weight of more than urban bridge traffic tonnage and headroom of vehicle traffic on the bridge in the city without authorization;

(G) parking, cleaning, try practicing on a bridge in the city, repair of motor vehicles;

(H) bridge in the city by setting up gas pipelines, more than 10,000-volt power lines and other inflammable and explosive pipelines;

(IX) dumping of garbage and waste;

(10) other acts of embezzlement, damage city bridge.

    Urban bridge management scope and refers to a security zone in the city's other bridges planned red line and space under the town bridge and bridge, trestle vertical projection on each side of a range of areas: downstream of the bridge on the left and 50 metres; special delimitation of bridge, in conjunction with the Planning Department of the city according to the actual situation.

    17th urban bridge management and security in the region engaged in dredging, excavation, piling, underground piping, blasting, quarrying, removal of Earth and other construction units and individuals, should establish security measures, after the approval of the municipal facilities Department, before construction.

    18th city bridge suffered when a vehicle crashes, municipal public security and traffic Administration Department shall identify accident-related liabilities, and promptly notify the municipal facilities department or municipal facilities management.

19th article city bridge appeared collapse, and fracture, effect passage security of burst status Shi, municipal facilities management institutions or city bridge conservation, and maintenance units should immediately to city municipal facilities competent sector and city police traffic management sector report, and established dangerous bridge warning brand; Dang burst status serious effect passage security Shi, city municipal facilities competent sector should with city police traffic management sector take seal bridge measures.

    When performing bridge maintenance, municipal facilities Department, in conjunction with the municipal public security traffic management departments jointly issued a bridge closure notices.

Article 20th municipal facilities management should establish and improve bridge safety assessment system of the city, in accordance with the relevant provisions of the State safety test and evaluation of the urban bridge, and test and evaluation results and class assessing filed in time.

In the event of natural disasters such as earthquakes, floods, or may bring about changes in urban bridge structure after the accident, municipal facilities management organizations should be studied on the bridge safety assessment.

    Bridge safety evaluation shall entrust a qualified entity.

Article 21st test and evaluation, found that the bridge's bearing capacity, but does not constitute a dangerous bridge, municipal facilities management organization should take timely reinforcement of security measures, and under the bridges of the City set safety warning signs. Identified by the evaluation as a dangerous bridge, municipal facilities management organization should take immediate measures to set significant warning signs.

    Need to bridge, city municipal facilities departments shall, jointly with the municipal public security and traffic administration released bridge closure notices in a timely manner, before the hazard is eliminated, shall not be used. 22nd city municipal facilities departments should develop bridges security incident response plan.

City bridge after the dramatic accident, city municipal facilities departments should be implemented as emergency rescue and emergency support, the relevant units and individuals shall obey the command, with the implementation of the emergency plan.

    Municipal facilities management organization and the city bridge maintenance, maintenance units should be in accordance with the emergency plan requirements, develop advanced emergency solution, fixed emergency teams, training, joint exercises, improve emergency handling ability.

    Article 23rd city municipal facilities departments should be established together with the municipal public security traffic Administrative Department of the city bridges overloading offence monitoring system, and incorporated into the municipal public security traffic management integrated application platform to handle the vehicle overloading offence according to law.

    24th article violates these rules, unauthorized use of unqualified acceptance or acceptance of urban bridge, by the municipal facilities Department of rectification and give a warning, and may be fine with project cost 2%.

    25th article violates these rules, city bridge maintenance, repair work does not set the necessary traffic safety facilities and safety warning signs, by the municipal facilities Department of rectification, may impose a fine of less than 20,000 yuan; losses caused, shall bear the liability for damages.

    26th article violates these rules, city bridge erection without authorization and appendages of the pipeline, by the municipal facilities Department of rectification, may impose a fine of less than 20,000 yuan; losses caused, shall bear the liability for damages.
27th article violates these rules, in the scope of urban bridge management and security in the region, has one of the following acts, by the municipal facilities Department of rectification, and may impose a fine of less than 20,000 Yuan:

(A) the unauthorized occupation of urban bridge;

(B) damage, move, ancillary facilities and bridges of the city surveying markers;

(C) unauthorized dredging soil, construction, stacking materials, using fire facilities, installations or operations;

(D) set, hanging, post advertisements, slogans without authorization;

(V) construction of bridge function and safety of buildings and structures;

(F) tracked vehicles, iron wheels of car, truck gross vehicle weight of more than urban bridge traffic tonnage and headroom of vehicle traffic on the bridge in the city without authorization;

(G) parking, cleaning, try practicing on a bridge in the city, repair of motor vehicles;

(H) bridge in the city by setting up gas pipelines, more than 10,000-volt power lines and other inflammable and explosive pipelines;

(IX) dumping of garbage and waste;

    (10) other acts of embezzlement, damage city bridge.

    28th municipal facilities Department staff in the process of urban bridge management abuse, negligence, malpractice, disciplined by the competent department or unit constitutes a crime, criminal responsibility shall be investigated according to law. 29th these measures come into force on February 15, 2014.