Advanced Search

Civil Airport Licensing Provisions

Original Language Title: 民用机场使用许可规定

Subscribe to a Global-Regulation Premium Membership Today!

Key Benefits:

Subscribe Now for only USD$40 per month.
(October 7, 2005 the Civil Aviation Administration of China, the 156th promulgated as of November 7, 2005) Chapter I General provisions article I-enhance the management of civil airport to ensure civilian safety and normal operation of the airport, according to the People's Republic of China civil aviation law and other relevant laws and administrative regulations of the State, this provision is enacted.     Provisions of this article apply to civil airports (including civil-military use the civilian part of the airport) using license management and related activities, temporary airport does not apply to these regulations.     Civil airports include public air transport and general aviation airports, hereinafter referred to as transport and General airports. Article III General Administration of civil aviation of China (hereinafter referred to as the Civil Aviation Administration) is responsible for the civil airport use of license and related activities management and ongoing supervision and inspection.     Include: (a) development of relevant norms, standards and legal supervision and inspection of the airport operation, (ii) approve and issue the flight zone index of 4E (included) permits civilian airport airport used for transport, (iii) transport approved by the airport name; (d) the establishment of an international audit of the airport and (v) other duties stipulated by laws and administrative regulations. Fourth civil aviation authority of China (hereinafter referred to as the civil aviation authority) is responsible for the civil airports in the region under the jurisdiction supervise and administer the licensing.     Include: (a) authorizing approval issued under CAAC's flight zone indicator for 4D (including) the following general civil airport at the airport for transport to the airport and use license, (ii) is responsible for the general approval of the airport name within their respective jurisdictions; (c) the supervision and inspection of civil airports in operation within their respective jurisdictions and (iv) other duties as authorized by the Civil Aviation Administration. Fifth civil airport implemented licensing systems.     Civil airport obtain permits before they can open.     In exceptional cases, civil airport did not fully comply with this requirement, you need to open, airport authorities to apply to the Civil Aviation Administration or the civil aviation authority, the Civil Aviation Administration or specially approved by the civil aviation authority, licenses can be issued for using civil airports.     The sixth name civil airport by the Civil Aviation Administration or the civil aviation authority for approval before use.     Without the approval of the Civil Aviation Administration or the civil aviation authority, are not allowed to use or change the airport name.     Seventh International Airport, after review by the Civil Aviation Administration to the State Council for approval.     Opening airports without State Department approval, shall develop international, Hong Kong, Macao and Taiwan airline flight operations.     The eighth airport administrative organ shall be in accordance with the requirements laid down in this article, establishing civilian airport safety management systems and accept supervision and inspection.     Nineth civil airport operation and management shall comply with the relevant provisions of the Civil Aviation Administration.     Civil airport licensing in chapter II section I General provisions article tenth of the licence to use civilian airports to civilian airport operating licence is the Civil Aviation Administration or issued by the civil aviation authority permits the airport open license file.     Article 11th civil airport permits (see Appendix I to the present provisions of the civil airport permits style) should be handled by airport authorities in accordance with the conditions and procedure for the application of this provision.     12th using civil airports permit issued in accordance with this article, for a period of five years.     13th civil airport use licenses by the Civil Aviation Administration of printed license number by the Civil Aviation Administration of the consolidated.     14th airport administrative organ shall be in accordance with civil airport use permit Airport be open to use. 15th made using civil airports of permits and has opened airports, airport authorities are not allowed to close the airport.     Airport hours of operation shall be published in the aeronautical information. Alternate airport should always maintain the ability to accept alternate flight.     As an alternate destination airport, the airport should be published in the aeronautical information for which the airport, what kind of model to provide information on alternate services.     Is an air carrier selected as alternate airport airport authorities should be signed with the air carrier to accept alternate plane of the safeguards agreement and specify the rights and obligations of both parties, ensure alternate airline's alternate.     16th under any of the following circumstances, airport administrative organ shall be at least 45 days before the expected closing of the airport submitted to the original examination and approval authority for approval, the approving authority shall, within 7 business days with a response: (a) the extension not to accept aircraft taking off and landing at the airport, (ii) lack of aviation operations, suspension of airport operations; (iii) decided to close the airport is no longer operating. At the reopening of the airport, airport administrative organ shall be submitted to the original examination and approval authority for approval. For the preceding paragraph (c), should be expected of the cancellation, the closing date of the airport an airport operating licence. Airport operating permit holder shall, in accordance with the approval of the Civil Aviation Administration or the civil aviation authority, inform the relevant flight information service department, issued NOTAM, and approved by the closing date, withdraw recognition of airport signs, Vane, brushing runway, taxiway closed signs.     And within 5 days after closing, an airport operating licence back to the original certification authority.     Airport was closed for more than a year the airport license shall be revoked.     Civil Aviation Administration or civil aviation authority approved the airport closed, should take fully into account the airline flights and in the public interest to minimize the impact of the airport was closed.     17th if you can't protect the safe operation of aircraft at the airport, airport authorities to temporarily shut down the airport, but shall promptly notify the relevant air traffic control authorities, issued by the air traffic controllers in accordance with the relevant provisions of NOTAM, minimize the impact of aircraft, and should adopt immediate and positive measures to eliminate the temporary closure of the airport, in the shortest possible period of time to restore operation.     18th airport facilities and equipment have not been improved maintenance, failed to make the necessary training of airport personnel, airport operational environment is being destroyed, hidden danger of safety operation of the aircraft, the Civil Aviation Administration or the civil aviation authority may suspend the airport opening.     Second section civilian airport using license of application 19th article application civilian airport using license of airport, should has following basic conditions: (a) airport management institutions has People's Republic of China corporate qualification; (ii) airport senior management personnel has corresponding of qualification and conditions; (three) airport of capital constitute proportion meet national about provides; (four) airport features of organization institutions and management system complete; (five) and its operation business phase adapted of flight district, and Terminal, and work district and service facilities and personnel;     (Six) necessary of air traffic service, and sailing intelligence service, and communications navigation monitored, and aviation meteorological, facilities and personnel, meet CAAC air traffic management sector of provides, and developed related of run management program; (seven) flight program and run minimum standard has approved; (eight) meet People's Republic of China civil aviation security defend Ordinance provides of security defend facilities and personnel; (nine) processing special situation of emergency plans and corresponding of facilities and personnel;     (J) to meet the operational requirements of the safety management system of the Airport (11) other basic conditions as deemed necessary by the Civil Aviation Administration.     The preceding paragraph (a), (d), (h), (j) does not apply to General airport.     20th article application civilian airport using license, airport management institutions should submitted following file information: (a) by this provides Appendix II civilian airport using license applications (style) of requirements fill in of applications; (ii) airport management institutions (corporate) and statutory representative people of name or name, senior management personnel of main degree and the work experience, proved file; (three) proved capital constitute of effective file of copies; (four) airport construction of approved file and completed acceptance file;     (Five) flight program and run minimum standard of approved file; (six) communications navigation monitored, and meteorological, facilities equipment open using of approved file; (seven) according to this provides of requirements prepared of civilian airport using manual (following referred to manual); (eight) holds post qualification certificate of personnel profile list, containing name, and gender, and was born date, and degree, and qualification certificate name, and qualification certificate issued organ and date; (nine) CAAC requirements submitted of other necessary material.     Airport authorities applying for an airport operating licence should be responsible for the authenticity of the documents, submitted more than four copies of the application in writing and in electronic form.     21st flight zone index of 4E (or more) transport airports, civil airport operating licence by the airport authorities to apply to the Civil Aviation Administration, flight zone indicator for 4D (including) transport and General airports, the civil airport use licenses by the airport authorities to apply to the civil aviation authority.     The Civil Aviation Administration or the civil aviation authority should be made within 20 working days after accepting admission to issue or not to issue a decision, and notify the applicant in writing.     Third section civilian airport using license of review and issued 22nd article CAAC or civil aviation area authority received airport management institutions submitted of application civilian airport using license of file information, should according to following requirements for review: (a) on file information of integrity and civilian airport using manual of format for audit; (ii) on manual content for review; (three) necessary Shi site verified airport management institutions by reported file material, and facilities equipment, and personnel of situation.     Review items of the preceding paragraph shall be investigated by the Civil Aviation Administration or appointees of the civil aviation authority or the Ombudsman to serve as, but only the Ombudsman has the right to sign the appropriate documents.     23rd Civil Aviation Administration or the civil aviation authority that the airport management agency submit documentation, airport facilities, staff does not contain all the provisions of the 19th and 20th of the conditions, it shall notify the airport authorities. Airport authorities take measures to compensate for the defects mentioned in the preceding paragraph, does not meet the relevant requirements, the Civil Aviation Administration or the civil aviation authority may refuse to issue permits for civil airport.     Rejection in granting license for using civil airports shall in writing notify the airport authorities, and state the reasons.     24th the Civil Aviation Administration or civil aviation authority following a review that the airport management agency applications in accordance with the provisions of the 19th and 20th when the conditions provided for in article, the Civil Aviation Administration or the civil aviation authority shall approve the application and permit, permission for using civil airports file, the manual signature of Inspector with the Airport Authority at the above address.     Civil airport operating permit issued, each page of the manual (does not include airport information booklets and photos) should be signed by the Ombudsman in charge of auditing, manual before it can take effect.     Civil airport operating permits are issued by the civil aviation authority shall apply to the Civil Aviation Administration of the license number.     25th made using civil airports permit airport authorities shall, in accordance with the relevant provisions of the Civil Aviation Administration of the airports provide aeronautical information services to the public.     Fourth section civilian airport using license of change and the renewal 26th article has following situation one of of, airport management institutions should according to this provides application change civilian airport using license: (a) airport flight district index occurred changes of; (ii) airport intends using models beyond original approved range of; (three) airport road surface grade, occurred changes of; (four) airport Visual help airlines conditions occurred changes of; (five) airport fire rescue grade occurred changes of; (six) airport using nature occurred changes of;     (G) the airport changes in capital structure ratio, and (VIII) airport name change; (IX) runway running category, mode change; (j) airport or Airport Authority change of the legal representative of the owner (11) airport authorities changed.     27th, application to change using civil airports of permits, airport authorities may apply for using civil airports reported only changes parts of the license information.     Civil airport permits changes, airport administrative organ shall, within 7 days of the original civil airport permits back to the original certification authority.     28th civil airport operating licenses before the expiration of 45 days, airport administrative organ shall apply for renewal of permits for civil airport and 20th in accordance with the required documentation.     29th manual is the manual fifth civil airport with civil airport permits approved in conjunction with the fundamental basis for airport runs, airport management firms should be strictly in accordance with manual operation and management of the airport.     Article 30th manual Appendix III shall include the provisions required by the manual of the main content of the civilian airport.     31st article Manual of format should meet following requirements: (a) take easy amendment of flyers format and by airport management institutions of statutory representative people signed; (ii) Manual within has modified records blank page, to records amendment content of directory coding, and implementation date, and amendment date, and for page people; Manual of amendment should reflect in manual of directory and manual text in the; (three) to easy prepared, and review of form choreography.     Manual for specific formatting requirements, see the manual of civil airports compilation and management of basic requirements.     Article 32nd airport administrative organ shall keep the Civil Aviation Administration, local civil aviation authority to provide a complete and current Handbook.     33rd at the airport, airport authorities should at least keep a complete and current manual, for the Ombudsman to review the airport use.     34th article has following situation one of Shi, airport management institutions should timely modified Manual: (a) CAAC, and civil aviation area authority requirements modified of; (ii) airport objective situation occurred changes and manual of content not phase meet of; (three) manual implementation process in the, for same terms appeared variety understanding or implementation results of; (four) manual provides of content not conducive to guarantee airport security run or exists security hidden of; (five) manual provides of content cannot guarantee airport of facilities equipment get effective maintenance of;     (F) Handbook and cannot fully reflect the contents of the security operation and management requirements; (VII) contents of the Handbook and does not meet national, industry's latest requirements and standards.     35th airport administrative organ shall dynamic management of manuals, each stationed units should strictly comply with Airport regulations. Article 36th overall modify or form part of an overhaul of the manual, airport administrative organ shall be submitted to the original examination and approval organs for approval, the approving authority shall, within 20 working days to respond.     Chapters of the manual are relatively independent content revision, Ombudsman's signature to take effect.     Manual changes to vet inspectors shall sign the appropriate to modify the page.     Chapter name management 37th civil airport of civil airports should be named to identify the specific location and to distinguish it from other airports airports as a criterion.     38th transport airport names should be presented by the airport where the city (or State) airport is located where the name suffix name.     39th article transport airport name should meet following provides: (a) should and State or levels names competent sector review approved of airport location administrative divisions of names name phase consistent; (ii) and existing other airport not name, avoid using homonym Word; (three) using specification of characters or minority text; (four) according to national Hanyu Pinyin using related provides, specification spelling airport name; (five) according to national translation management related provides, specification spelling airport English translation.     40th article transport airport of changed its name should meet following conditions: (a) airport location city (or to, and State) name or specific locations administrative divisions name by State or levels names competent sector approved changed its name of, the airport should changed its name; (ii) local masses for custom or pronunciation and strongly requirements modified airport name in the suffix specific locations name of, the airport can changed its name; meet above (a), and (ii) changed its name conditions of, changed its name should meet this provides 39th article provides.     (C) by the Civil Aviation Administration reported to the State Council approved the establishment of an international airport, in the name of the airport to increase the "international" Word.     41st transport the naming or renaming of the airport, applications should be made by the Airport Authority, the airport location city, State-level people's Governments for examination and approval, reported to the Civil Aviation Administration for approval.     The 42nd army civil-military share of the civilian part of the airport changed its name property, airport administrative organ shall seek prior written views relevant military bodies.     43rd article transport airport named or changed its name should to CAAC submitted following file: (a) airport management institutions on airport named or changed its name of application file; (ii) airport location city, and State level Government of audit views; (three) army property of civil-military share airport civilian part, should attached related army organ of views; (four) airport name domestic demand increased "international" II word of, should attached State approved its established international airport of file.     The 44th Civil Aviation Administration received in accordance with the requirements of the airport named or renamed after the application, review and make a decision within 20 working days.     45th transport airport management body received the approval of the Civil Aviation Administration named or renamed after the approved name of the airport was officially opened and published information, making signs signs etc. Airport authorities at the airport entrance and significant position name signs at the airport terminal.     City name can be set only on the roof of the terminal building. Airport name marks the main contents include: standard airport name standard written form of the Chinese characters, standard form of specifications of the Chinese phonetic alphabet spelling of the name of the airport.     In the autonomous region, according to the law on regional national autonomy under the relevant written and set the national standard written form.     International airport should also be standard label English airport name.     46th General names should be at the airport where city or, State, County, Township name suffixes located place name.     47th generic airport names should be consistent with the provisions of this article 39th.     Naming or renaming of the 48th General airport, the airport authority or airport owner to apply, airport area approved by the administration of civil aviation.     49th applications General the naming or renaming of the airport, the airport authority or airport owner should submit the following documents to the civil aviation authority: (a) the airport authority or airport and airport owners on naming or renaming of the application documents, (ii) audit of the airport or the county people's Governments above the county level.     50th General Civil Aviation Authority received the airport authority or airport after an application owner, shall, within 20 working days to review decisions and submitted to the Civil Aviation Administration for the record.     The 51st General airport authorities or owners receive after approval of the naming or renaming of the civil aviation authority, shall not be approved name of the airport was officially opened, release information, and prominently specification marking at the airport the airport name.     Fourth chapter establishment of the 52nd International Airport existing airport transport to apply for the establishment of an international airport by airport or Airport Authority, with the consent of the owner of the airport is located (district, municipal) level after the Government agreed, to apply to the Civil Aviation Administration.     53rd applicant to apply to the Civil Aviation Administration of the establishment of an international airport, shall submit the following application documents: the necessity and feasibility of the establishment of an international airport, economic and social development needs in the area of the airport, airport safety and operating conditions; airport clearance inspection bodies and the feasibility of facilities.     54th CAAC receives the application documents and to seek the views of the relevant departments of the State Council, proposed audit opinion submitted to the State Council for approval.     55th after the State Council approved the transit airport for international airport, located from the Airport (regions, municipalities) people's Government in accordance with the relevant provisions of the State organizations to implement entry-exit inspection authorities, construction of airport-related inspection facility.     56th new airports to apply for the establishment of an international airport, the airport project reports into applications.     After the approval of the State Council, in airport construction period by international standards and the requirements of the entry-exit inspection authorities, finish building the facilities, and acceptance by the relevant competent departments.     57th International Airport opened to international air transport operations with suitable facilities, equipment and personnel, and industry acceptance by the Civil Aviation Administration or the civil aviation authority.     Approved the establishment and acceptance of international airport is to be opened to foreign aircraft, international flight operation, flight operation.     58th international airport open to use by the Civil Aviation Administration announced.     International Airport information published centrally by the CAAC air traffic management.     59th in violation of the provisions of the sixth fifth chapter legal liability provisions, 45th, 51st, without the approval of unauthorized use or change the airport name, by the Civil Aviation Administration or civil aviation authority ordered to immediately stop using, rectify, and depending on the seriousness of a warning or fined 10,000 yuan and 30,000 yuan fine.     60th article, violation of the provisions of the fifth article, without a permit obtained using civil airports and opening the airport, used by the Civil Aviation Administration or the civil aviation authority ordered to stop opening, confiscate the illegal income, and fined a maximum of 1 time the illegal proceeds.     61st civil airport use permits from the airport authorities provided false information, the Civil Aviation Administration or the airport use license shall be revoked by the civil aviation authority, confiscate the illegal income, and impose a penalty of more than 10,000 yuan to 30,000 yuan.     62nd in violation of the provisions of article 14th, without expanding the scope of airport, the Civil Aviation Administration or the civil aviation authority for airport authorities to be warned, and punishable by a penalty of more than 10,000 yuan to 30,000 yuan.     63rd article violation of the provisions of the 15th, 16th, off or not in accordance with the regulations without authorization programs closed to civilian airports, the Civil Aviation Administration or the civil aviation authority to the civil airport administrative organ shall be warned and fined 10,000 yuan fine.     64th article not by this provides of requirements on civilian airport of run implemented continued management, led airport of part facilities up not to about technology standard requirements, effect airport security run and normal using of, CAAC or civil aviation area authority can on airport management institutions give warning, and can sentenced 10,000 yuan following fine; by warning still not timely improved of airport management institutions, CAAC or civil aviation area authority can ordered its stop open using.     Prescribed in the preceding paragraph if the circumstances, caused the incident or accident, by the Civil Aviation Administration or civil aviation authority suspended the airport license, and recommend to the relevant person directly responsible and appropriate managers to administrative sanctions.     65th in violation of the provisions of article 25th, sailed airport information has not been provided to the intelligence to be published, the Civil Aviation Administration or the civil aviation authority for airport authorities to be warned and fined 10,000 yuan fine.     66th article in violation of the provisions of article 26th, airport authorities failed to apply for the civil airport use license, the Civil Aviation Administration or the civil aviation authority for airport authorities to be warned, and punishable by a penalty of more than 10,000 yuan to 30,000 yuan.     67th in violation of the provisions of article 29th, 35th, is not in accordance with manual operation of the airport or not dynamic management of manuals, the Civil Aviation Administration or the civil aviation authority for airport authorities to be warned, and punishable by a penalty of more than 10,000 yuan to 30,000 yuan.     The 68th in violation of the provisions of this article seventh and 57th, transportation of Western medicines accept foreign aircraft using the airport, by the Civil Aviation Administration or civil aviation authority ordered to immediately stop using, and depending on the seriousness of a warning or a fine of up to 10,000 yuan and 30,000 yuan fine.     69th without approval, closing airports, the Civil Aviation Administration or the civil aviation authority you can log off the airport operating licence.     70th aviation license of executive staff in the civil airport administrative, civil airport names management, the establishment of an international airport of the audit as well as supervision and inspection of civil airport of dereliction of duty, abuse of power, favoritism in the process, by their work units or the competent authority administrative sanctions constitutes a crime, criminal responsibility shall be investigated according to law. The sixth chapter supplementary articles article 71st published 30th after the date of implementation of the provisions.       Released on October 15, 1998, execution of the abolition of the licensing provisions of civil airport at the same time.                                             附录一:民用机场使用许可证样式 ┏━━━━━━━━━━━━━━━━━━━━ (编者注:此处图标见原稿) ━━━━━━━━━━━━━━━━━━━━┓ ┃                                                                                                            ┃ ┃ 民用机场使用许可证                                             ┃ ┃                                                                                                            ┃ ┃    机场名称:_____    _____________________________   使用许可证编号:________________________________________ ┃ ┃    机场所有者法定代表人:______________________   机场管理机构法定代表人:________________________________ ┃ ┃ 机场管理机构名称:__________________________   机场使用性质:__________________________________________ ┃ ┃    飞行区指标:________________________________   道面等级号:____________________________________ ________ ┃ ┃    可使用机型:________________________________   消防救援等级:__________________________________________ ┃ ┃    跑道运行类别、模式:_________________________________________________________   __________________________ ┃ ┃                        ___________________________________________________________________________________ ┃ ┃ 目视助航条件:_________________________________________________________________________________________ ┃ ┃                  ____________________________________________________________________                                                                                          _____________________ ┃┃┃┃ The airport operating licence in accordance with the People's Republic of China civil aviation law 62nd article, and article 63 of the civil airport licensing regulations (Civil Aviation General ┃ ┃ 156th order). ┃ ┃ Airport administrative organ shall comply with the relevant laws and regulations on airport opening in terms of use and upon approval of the manual for the civil airport use.                            Otherwise, ┃ ┃ aviation administrative departments under the State Council has the right to order the airport stop, confiscate the illegal income and may be fined not more than 1 time.                                                ┃ ┃ Airport operating licence not transferable, subject to revocation, cancellation, a period of five years.                                                                                                            ┃ ┃                                                                                发证机关                    ┃ ┃                                                                                                            ┃ ┃                                                                                           年    月    日   ┃ ┃                      ┃ ┗━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━┛ ┏━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━┓ ┃                                                                      ┃ ┃                                                                      (编者注:此处图标见原稿)                      ┃ ┃                                                                      ┃ ┃                          民用机场使用许可证                          ┃ ┃                                                                      ┃ ┃                              (副 本)                               ┃ ┃                                                                      ┃ ┃                  ┃ ┃                  机  场  名  称:_________________                   ┃ ┃                                                                      ┃ ┃ 使用许可证编号:_________________                   ┃ ┃                                                                      ┃ ┃                                                                      ┃             ┃ Airport operating licence in accordance with the People's Republic of China civil aviation law 62nd article, 63 ┃ ┃ and civil airport licensing regulations (civil aviation order 156th). ┃ ┃ Airport administrative organ shall comply with the relevant laws and regulations on airport opening in terms of use and approved ┃ ┃ Handbook for using civil airports.                      Otherwise, the civil aviation Administrative Department under the State Council has the right to order the ┃ ┃ stopped using the airport, confiscate the illegal income, and may be fined not more than 1 time.          ┃ ┃ Airport operating licence not transferable, subject to revocation, cancellation, a period of five years. ┃ ┃                                                                      ┃ ┃                                                                      ┃ ┗━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━┛ ┏━━━━━━━━━━━━━━━━━━ ━━━━━━━━━━━━━━━━━┓ ┃                                                                      ┃ ┃    机场所有者法定代表人:_______________________________________     ┃ ┃    机场管理机构名称:______________________________________ _____     ┃ ┃    飞行区指标:_________________________________________________     ┃ ┃    可使用机型:_________________________________________________     ┃ ┃    机场管理机构法定代表人:_________________________________ ____     ┃ ┃    机场使用性质:_______________________________________________     ┃ ┃    道面等级号:_________________________________________________     ┃ ┃    消防救援等级:________________________________________ _______     ┃ ┃    跑道运行类别、模式:_________________________________________     ┃ ┃                        _________________________________________     ┃ ┃    目视助航条件:____________________________________________                                                                      ___     ┃ ┃                  _______________________________________________     ┃ ┃                                                                      ┃ ┃                                                                      ┃ ┃                                                                      ┃ ┃                                                                      ┃ ┃                                          ┃ ┃                                   发证机关                           ┃ ┃                                                                      ┃ ┃ 年    月    日              ┃ ┃                                                                      ┃ ┃                                                                      ┃ ┗━━━━━━━━━━━━━━━━━                                                                      ━━━━━━━━━━━━━━━━━━┛ Appendix II: civil airport style using civil airports use licence applications licence applications 1, airport sites profile ┌----------------------------------------------┐ │ │ │机场名称:____________________________________________________________│ │机场基准点的地理坐标:________________________________________________│ │机场地址:_______________________________                                                                      _____________________________│ │________________________________邮编:________________________________│ │相对于城市的方位和距离:______________________________________________│ │ │ └───────────────────────────────────┘  2、机场管理机构简况 ┌───────────────────────────────────┐ │                                                                      │ │机场管理机构名称:____ ________________________________________________│ │机场管理机构法定代表人:______________________________________________│ │机场管理机构地址:_______________________________________________                                                                      _____│ │________________________________邮编:________________________________│ │电话:_________________传真:__________________电邮:_________________│ │ │ └───────────────────────────────────┘  3、机场权属简况 ┌───────────────────────────────────┐ │                                                                      │ │机场所有者法定代表人:_________________________ _______________________│ │机场所有者法定代表人地址:____________________________________________│ │________________________________邮编:________________________________│ │电话:__________ _______传真:__________________电邮:_________________│ │股份制机场请注明主要股东的机构名称及其持股比例:______________________│ │____________________________________________________________________                                                                      __│ │                                                                      │ └───────────────────────────────────┘  4、申请民用机场使用许可证的性质 ┌───────────────────────────────────┐ │ │ │首次取证□    换证□    变更□      (请简述原因)____________________│ │______________________________________________________________________│ │_____________________________________                                                                      _________________________________│ │                                                                      │ └───────────────────────────────────┘  5、民用机场使用许可证的主要内容 ┌───────────────────────────────────┐ │ │ │机场使用性质:_____________________ 飞行区指标:______________________│ │道面等级号:________________________消防救援等级:____________________│ │可使用机型:________                                                                      _______________ 跑道运行类别、模式:______________│ │目视助航条件:________________________________________________________│ │              ________________________________________________________│ │ │ └-The-the-the-the-the-the-the-the-the-the-the-the-the-the-the-the-the-the-the-the-the-the-the-the-the-the-the-the-the-the-the-the-the-the-the ┘ 6, and airport management institutions statutory representative people statement ┌-the-the-the-the-the-the-the-the-the-the-the-the-the-the-the-the-the-the-the-the-the-the-the-the-the-the-the-the-the-the-the-the-the-the-the ┐ │ I statement, this applications all content is real of, and can operation of. I was solely responsible for the operation of the airport │ │ security and promised to bear the corresponding legal responsibility and legal obligation.                                                                    │ │ Applied for civil airport use license. │ │______________________________________________________________________│ │______________________________________________________________________│ │____________________ __________________________________________________│ │______________________________________________________________________│ │__________________________________________ ____________________________│ │______________________________________________________________________│ │________________________________________________________________ ______│ │______________________________________________________________________│ │______________________________________________________________________│ │机场管理机构法定代表人签名:                                    __________________________________________│ │                                                                      │ │                                                                      │ │                                                                      日期:____________________________│ │                                                                      │ │                                                                      │ │ │ │                                                                      │ └───────────────────────────────────┘  7、随附文件目录 ┌──────────────── ───────────────────┐ │                                                                      │ │                                                                      │ │一、____________________________________ ______________________________│ │二、__________________________________________________________________│ │三、______________________________________________________________ ____│ │四、__________________________________________________________________│ │五、__________________________________________________________________│ │六、__________________ ________________________________________________│ │七、__________________________________________________________________│ │八、____________________________________________                                                                      ______________________│ │九、__________________________________________________________________│ │十、__________________________________________________________________│ │                                                                      │ │                                                                      │ │                                                                      │ │                          │ │                                                                      │ │          日期:____________________________│ │                                                                      │ └───────────────────────────────────┘  8、申请的受理及批复 ┌───────────────────────────────────┐ │ │ │收到申请书的日期:____________________________________________________│ │审核的开始日期:______________________________________________________│ │审核的完 成日期:______________________________________________________│ │批准颁发许可证的文件号:______________________________________________│ │拒绝颁发许可证的文件号:__________________________________ ____________│ │审核的主要过程:______________________________________________________│ │______________________________________________________________________│ │________________ ______________________________________________________│ │______________________________________________________________________│ │______________________________________ ________________________________│ │承办人签字:_________________________________日期:___________________│ │                                                                      │ └──────────────────────────────────       Guidance notes-┘ 1, may be required to provide documentation in support of this application, any matters, 2, the processing of the applications are free of charge.     Appendix III: Manual of civil airport main civil airport operating manual shall include the following main elements: first, preparing a handbook on using civil airports (hereinafter referred to as manual) purpose and scope of document management requirements, the responsibility of the airport authorities, airport management bodies (legal representative) commitment. II, and description airport security management system, main including: 1, and airport features of organization institutions, and personnel and duties; 2, and airport security management of approach policy; 3, and airport security run of information management and report system; 4, and promote security and prevention accident of measures, including involved flight accident, and accident signs, and complaints, and defects, and errors, and fault of analysis and processing, and security hidden of continued monitoring measures; 5, and airport security management of the system and plans, and airport internal security checks and review system; 6, and     All security-relevant airport facilities and its operation and maintenance records, made of computer management system for querying and retrieval; 7, staff training and qualification, including staff training, refresher training and workforce capability assessment approach; 8, stationed units and external personnel entering the airfield management principles. Three, and airport run program and security management requirements, main including: 1, and flight district site management; 2, and Visual help airlines facilities and the airport power management; 3, and machine ping run management; 4, and Airport Control District within vehicles and the driving personnel of management; 5, and construction management; 6, and air traffic control facilities of run maintenance management; 7, and rescue and the fire facilities management; 8, and airlines oil store, and conveying, and raises of management; 9, and dangerous goods of management; 10, and public security protection measures     Shi; 11, safety and security (air defence) measures (including personnel documents management); 12, airport clearance and electromagnetic environment protection area management, 13, measures to prevent the management of wildlife hazards; 14, civil aviation or otherwise deemed necessary by the civil aviation authority regulations.     Four, the airport emergency response plan, including: 1 and emergency rescue organizations, and its responsibilities; 2, appropriate to the specific projects and emergency rescue plan; period of agreement 3, Division 4, emergency management requirements; 5, removal of the damaged aircraft; 6, to restore the normal operation of the program. Five, and airport information and the drawings, main including: 1, and runway and lifting with; 2, and glide road; 3, and machine ping; 4, and obstacles; 5, and communications, and navigation, and airlines tube, and meteorological, air traffic control facilities; 6, and lights, and logo line, and logo brand, and logo real, Visual help airlines facilities; 7, and passenger terminal floor, and freight terminal floor and the other buildings (containing underground engineering) of description. Including passenger bridge, and luggage and the goods transmission equipment, and information system; 8, and rescue and fire, and security protection and security checks facilities and the equipment of description; 9, and public facilities, and for oil facilities, and power facilities of description; 10, and electromagnetic environmental protection, and noise control, and sewage processing and the emissions, and ice control, and aviation garbage processing, environmental protection facilities; 11, and airport construction history, including construction according to, and engineering scale and engineering implementation in the of important event; 12, and city development planning on this airport of requirements; 13, and airport location figure ; 14, and Airport General layout figure (including terrain, and drainage facilities); 15, and airport planning total plane figure and status total plane Figure; 16, and airport clearance plane figure, and profile figure, to runway center line and extension relationship said of obstacles location and the top elevation of list; 17, and airport tube network integrated system plane figure, including turning point of location and the buried deep (as reported electronic version); 18, and emergency rescue plans needed of airport square network figure, standard out square network coordinates, and flight district, and machine ping, and build-up district, and water, and     Roads and import and export, the surrounding community; 19, airport noise contour maps. Airport information and specific requirements of the drawings of the civilian airport airport information required is the manual (AC-CA-2000-5) and the basic requirements for the airport user's manual figure drawing (AC-CA-2000-4).