(September 19, 2005 national environmental protection General makes 28th, announced since November 1, 2005 up purposes) first chapter General first article for strengthening sources regulatory, implementation pollutants emissions total control and sewage license system and sewage charges system, prevention pollution accident, improve environment management scientific, and information level, according to water pollution control method, and air pollution control method, and environment noise pollution control method, and water pollution control method implementation rules, and
    Regulations on environmental protection of construction projects and the sewage charge is imposed by the regulations relating to environmental protection laws and regulations, these measures are formulated.
    Second approach applies to the supervision and management of automatic monitoring system for major pollution sources.
    Key sources of water contamination, air pollution and noise emissions, construction, management, operation and maintenance of automatic monitoring system, must comply with these measures.
    Article automatic monitoring and control system in these measures, by automatic monitoring devices and monitoring center.
    Automatic monitoring devices installed at the source site used to monitor, monitor emissions equipment, flow (rate) meters, pollution treatment facility operation recorder and data acquisition and transmission apparatus, instruments, meters, is a component of pollution control facilities.
    Monitoring Center is a Department of environmental protection through the transmission line automatic monitoring devices used for major pollution sources and implementation of automatic monitoring and control of the computer software and equipment.
    Automatic monitoring system approved by the Environmental Protection Department checked for fourth and running, pollution discharge Declaration its data as the Department of environmental protection approved, permit issuance, total control, environmental statistics, collecting fees and on-site environmental enforcement environmental monitoring on the basis of and in accordance with the relevant provisions to the public.
    Fifth State environmental protection administration, is responsible for directing the national key pollution sources monitoring, development work and technical specifications.
    Requirements of the local environmental protection Department under the State environmental protection administration in accordance with overall planning, ensuring focus, balance, honest principles, identifies the need for automatic monitoring of major pollution sources, to develop work plans.
    Sixth article environment monitored institutions is responsible for following work: (a) participation developed work plans, and organization implementation; (ii) verified automatically monitoring equipment of selection, and installation, and using whether meet requirements; (three) on automatically monitoring system of construction, and run and maintenance, for supervision check; (four) this administrative within focus sources automatically monitoring system networking monitoring management; (five) approved automatically monitoring data, and to sibling environmental protection sector and superior environment monitored institutions, networking submitted;
    (F) does not comply with the requirements established or the unauthorized removal, idle, closed and irregular units made using automatic monitoring and control system of punishment according to law.
    Article seventh environmental monitoring agency responsible for the following: (a) guide the selection, installation and use of automatic monitoring and control equipment, (ii) than on a regular basis to monitor the automatic monitoring devices, automatic monitoring data validity of observations made.
    Eighth environmental information agency is responsible for the following tasks: (a) guide the software development of automatic monitoring and control system, (ii) guide the network of automatic monitoring and control system, verify the network of automatic monitoring and control system compliance with the technical specifications established by the State environmental protection administration, (iii) to assist the environmental watchdog on networking operation of automatic monitoring system for maintenance management.
    Nineth automatic monitoring system for all units and individuals have protection obligations and the right to free, demolition, destruction and alteration of automatic monitoring and control system parameters and data irregularities reported using the automatic monitor and control the behavior of the system.
    Chapter II construction of automatic monitoring system for units of tenth in the pollution source auto-monitoring plan shall be in accordance with specified time frame construction, installation of automatic monitoring equipment and supporting facilities, with the automatic monitoring system of the network.
    11th new construction, reconstruction, expansion and technical innovation projects should be based on the approved environmental impact assessment documentation requirements for construction, installation of automatic monitoring equipment and supporting facilities, as part of its environmental protection facilities, simultaneously with the principal part of the project designed, built and put into use. 12th article construction automatically monitoring system must meet following requirements: (a) automatically monitoring equipment in the of related instrument should selection by national environmental protection General specified of environment monitoring instrument detection institutions applicability detection qualified of products; (ii) data acquisition and transmission meet national about sources online automatically monitoring (monitoring) system data and interface standard of technology specification; (three) automatically monitoring equipment should installation in meet environmental protection specification requirements of sewage mouth; (four) according to national about environment monitoring technology specification,
    Environment monitoring instrument for monitoring should be qualified; (e) automatic monitoring devices and monitoring center to stabilize network; (vi) establishment of automatic monitoring and control system operation, use and management systems.
    13th automatic monitoring equipment for construction, operation and maintenance funded by the units raised, environmental protection departments can grant; monitoring center's construction and operation and maintenance funded by the Environmental Protection Department presentation of budgets for funding. Third chapter automatically monitoring system of run, and maintenance and management 14th article automatically monitoring system of run and maintenance, should comply with following provides: (a) automatically monitoring equipment of operation personnel should by national related provides, by training assessment qualified, and holding card induction; (ii) automatically monitoring equipment of using, and run, and maintenance meet about technology specification; (three) regularly for than on monitoring; (four) established automatically monitoring system run records; (five) automatically monitoring equipment for fault cannot normal collection, and transmission data Shi,
    Maintenance in a timely manner and report to the environmental watchdog, manual monitoring method should be used to submit data, if necessary.
    Automatic monitoring and control system operated and maintained by third parties, entrusted to third parties should be based on the provisions of the administrative measures for environmental pollution control facilities operation qualification, apply for and obtain a qualification certificate for environmental pollution control facilities operation.
    15th automatic monitoring devices in need of repair, deactivate, remove, or change, shall be submitted to the environmental approval of the supervisory authorities.
    Environmental monitoring institutions shall from the date of receipt of reports of units within 7th reply; fails to reply, as agreed.
    16th in violation of fourth chapter penalty provisions of this approach, existing units not complying with the prescribed time limit to complete the installation of automatic monitoring equipment and supporting facilities, environmental protection departments at and above the county level rectification and to a fine of up to 10,000 yuan.
    17th article violation this approach provides, new, and alterations, and expansion and technology of project not installation automatically monitoring equipment and supporting facilities, or without acceptance or acceptance not qualified of, subject engineering that official input production or using of, by approval the construction project environment effect evaluation file of environmental protection sector according to construction project environmental protection Management Ordinance ordered stop subject engineering production or using, can at 100,000 yuan following of fine. 18th article violation this approach provides, has following behavior one of of, by County above place environmental protection sector by following provides processing: (a) deliberately not normal using water pollutants emissions automatically monitoring system, or without environmental protection sector approved, unauthorized demolition, and idle, and damage water pollutants emissions automatically monitoring system, emissions pollutants over provides standard of; (ii) not normal using atmosphere pollutants emissions automatically monitoring system, or without environmental protection sector approved, unauthorized demolition, and idle, and
    Failure of automatic monitoring system for emissions of air pollutants, and (iii) without the approval of the environmental protection department which dismantles, idle, the destruction of automatic monitoring system of environmental noise emission, noise emissions exceed required standards. Has Qian paragraph subsection (a) items behavior of, according to water pollution control method 48th article and water pollution control method implementation rules 41st article of provides, ordered recovery normal using or deadline again installation using, and at 100,000 yuan following of fine; has Qian paragraph subsection (ii) items behavior of, according to air pollution control method 46th article of provides, ordered stop violations, deadline corrected, give warning or at 50,000 yuan following fine; has Qian paragraph subsection (three) items behavior of, according to environment noise pollution control method
    Provisions of 50th, correction, fines of between 30,000 yuan.
                                                                                          Fifth chapter supplementary articles article 19th these measures shall take effect on November 1, 2005.