Advanced Search

Water Conservancy Hoist Using License Management Approach

Original Language Title: 水利工程启闭机使用许可管理办法

Subscribe to a Global-Regulation Premium Membership Today!

Key Benefits:

Subscribe Now for only USD$40 per month.
Water Conservancy hoist using license management approach

    (Released on October 10, 2010 the Ministry of water resources, the 41st come into force on December 1, 2010) first in order to strengthen the quality supervision and management of the water conservancy hoist, ensure project safety, in accordance with the People's Republic of China administrative licensing law and the administrative examination and approval items really necessary to be retained by the State Council to set administrative licensing decision, these measures are formulated. Second water conservancy hoist production and implementation of licensing and supervision and management, application of this approach.

    Included under the regulations of the special equipment safety supervision of special equipment directory, application of the regulations.

    Hoist in these measures refers to hydraulic engineering is used to open and close gates, equipment for lifting and placing trash.

    Article water Administrative Department under the State Council are responsible for hoist production and implementation of the licensing and regulatory work.

    Fourth production hoist enterprises shall, in accordance with the rules applied to the water Administrative Department under the State Council made water conservancy hoist use license.

    Businesses cannot get the water conservancy hoist use license, shall participate in bidding of water conservancy hoist, hoist the prohibition of its manufacture in water conservancy projects.

    Fifth application for water conservancy hoist operating licence shall satisfy the following conditions:

    (A) have the status of enterprise legal persons;

    (B) with the corresponding registered capital;

    (C) fitting in with the production hoist professional and technical personnel and special types of personnel;

    (D) with fitting in with the production hoist production equipment, processing equipment, measuring instruments and testing equipment;

    (E) the effective operation of the quality management system;

    (F) hoist product quality to meet the requirements of the relevant technical standards;

    (VII) other conditions stipulated by laws and regulations.

    The preceding paragraph (b), (c), (d) and (e) requirements of specific requirements see annex.

    Sixth application for water conservancy hoist operating licence shall submit the following application materials:

    (A) two copies of the application;

    (B) copy of business license;

    (C) professional and technical personnel, special types of lists;

    (D) the main production equipment, processing equipment, measuring instruments and testing equipment;

    (E) quality management system related materials;

    (F) production of hoist used in hydraulic engineering. Applicant shall be specified in the application to apply for license type of hoist products and specifications apply for two or more types, can be applied.

    Hoist Division of product types and specifications of annex.

    The applicant shall submit the relevant materials, and be responsible for the authenticity of the application materials. Article seventh water Administrative Department under the State Council receives the application materials, shall make a decision on whether to accept and issue to the applicant a written voucher.

    Application materials are incomplete or not in compliance with the statutory form, shall, within five working days, inform the applicant needs to supplement the entire contents. After the eighth water Administrative Department under the State Council to accept the application and organization to verify the Enterprise shall meet the conditions of verification completed within 20 working days from the date of acceptance of the application verification qualified, notify the enterprise product quality inspection.

    Enterprises shall, within 20 working days of receipt of the notification to submit product quality inspection report. Nineth product quality inspection lies with the metal structure made of water conservancy project quality detection management hydraulic engineering quality testing units of such qualification.

    Quality detection units should be carried out in accordance with the relevant standards and requirements for extracting prototype testing, product quality testing report issued by, and be responsible for product quality inspection report. Tenth water Administrative Department under the State Council shall, in accordance with the verification and product quality inspection report, within 20 working days from the day of acceptance of the application (does not include the time required for verification, product quality testing) make their licensing decisions.

    Eligible, grant permission, issuing water conservancy hoist license; does not meet the criteria, no license, notify the applicant in writing and state the reasons.

    11th water conservancy hoist use permit shall set forth the name, residence, address, product types and specification, certificate number, expiry date, and so on.

    Enterprises to obtain some type of hydraulic hoist and specifications product license, can produce the type and specifications, as well as the same type is less than the size of the hoist.

    Article 12th water conservancy hoist use license Enterprise, needs to improve the hoist product specifications or product type, an application shall be made in accordance with the provisions of the present article sixth.

    13th water conservancy hoist use licenses are valid for five years. Water Conservancy hoist needs to extend the expiration of the use license should be working in the expiry of 60 days to apply to the water Administrative Department under the State Council.

    Water Administrative Department under the State Council shall make a decision on whether to continue before the expiry.

    14th enterprise changes its name, domicile, legal representative shall, within 30 working days from the date the change water Administrative Department under the State Council to apply for change of the water conservancy hoist use license.

    Address migration, water conservancy administrative departments under the State Council shall be applied for re-verification, qualified through verification before they can go through the change procedures.

    15th Enterprise hoist production, technology should be used in compliance with national and industry standards for design documents.

    16th hoist shall be subject to inspection before delivery, and product packaging, the quality certificate or product indicated on the certificate using the license number and expiration date.

    17th hoist installation, operation, maintenance, and implementation of relevant laws and regulations of water project construction and management regulations and technical standards. 18th water conservancy administrative departments of the State shall strengthen the hoist production and the supervision of the implementation of the licensing examination.

    Monitoring includes:

    (A) in accordance with licence types and specifications of hoist production;

    (B) it complies with the technical standard of the design documentation;

    (C) in accordance with relevant technical standards organizations to hoist production;

    (D) alter, resell, rent, lend or in any other form of illegal transfer of licences;

    (E) business productivity, quality management and product quality;

    (F) in water conservancy projects, hoist for use by the water conservancy hoist made licensing of production and inspection.

    19th water Administrative Department under the State Council when conducting supervision and inspection, you can take the following measures:

    (A) required to provide related documents and information;

    (B) to make on-site inspections of production sites;

    (C) sampling of the product;

    (D) for failure to comply with these rules shall be ordered to correct.

    20th hoist production and licensing of implementation and supervision and management departments and their staff, have one of the following acts, by its superior administrative body or supervisory organs shall be ordered to correct serious, managers directly responsible and other persons directly responsible shall be given administrative sanctions constitute a crime, criminal responsibility shall be investigated in accordance with law:

    (A) meet the requirements the application as inadmissible;

    (Ii) the eligible applications are not made within the statutory time limit decision issued water conservancy hoist or not to use a license;

    (C) the petition does not meet the conditions of water conservancy hoist use license;

    (D) making use of his facilities, solicitation or acceptance of other people's property, or seeking other interests;

    (V) does not perform its oversight duties or oversight, causing serious consequences.

    21st the applicant to hide relevant information or provides false materials in water conservancy hoist use permit application inadmissible or not to license, and given a warning, the applicant may not apply again in a year.

    22nd by fraud, bribery or other improper means to obtain the water conservancy hoist use license, by the water conservancy Administrative Department revoked the license, fines of between 30,000 yuan, the applicant allowed to re-apply in three years constitutes a crime, criminal responsibility shall be investigated according to law.

    Article 23rd water conservancy hoist use license Enterprise, any of the following acts, the water Administrative Department under the State Council shall order rectification, fined a maximum of 30,000 yuan and constitutes a crime, criminal responsibility shall be investigated in accordance with law:

    (A) alter, resell, rent, lend or in any other form of illegal transfers of water conservancy hoist use license;

    (B) is not used in accordance with the water conservancy hoist permit type and specifications for production;

    (C) refuse to accept supervision and inspection or concealed in the supervision and inspection of the situation, the provision of false information.

    Article 24th cannot get the water conservancy hoist use license, crane production, the water Administrative Department under the State Council shall order rectification, be informed, and fined a maximum of 30,000 yuan and constitutes a crime, criminal responsibility shall be investigated according to law.

    25th use without water in the water conservancy hoist license production of the hoist or without inspection of hoists, in accordance with the relevant laws and regulations of water project construction and management regulations are punishable.

    26th article this way has been made prior to the implementation of the water conservancy hoist operating licence within the period of validity shall remain valid. 27th article this way come into force on December 1, 2010.

    June 25, 2003, issued by the Ministry of water resources of the water conservancy hoist using license management (water [2003]277 issued July 8, 2005, the Ministry of water resources on modifying or abolishing some normative documents of water conservancy administrative licensing decision on modifications) repealed simultaneously.

    Annex

A divided, hoist products and specifications
┌────────────┬──────┬─────────────────┐
│-│-│ Specifications lifting power (measured in single lifting point) (kN) │
├────────────┼──────┼─────────────────┤
│                        │    小型    │              Q≤250              │
│                        ├──────┼─────────────────┤
│         螺杆式         │    中型    │           250<Q≤500            │
│                        ├──────┼─────────────────┤
│                        │    大型    │              Q>500              │
├────────────┼──────┼─────────────────┤
│                        │    小型    │              Q≤500              │
│                        ├──────┼─────────────────┤
│                        │    中型    │           500<Q≤1250           │
│       固定卷扬式       ├──────┼─────────────────┤
│                        │    大型    │          1250<Q≤3200           │
│                        ├──────┼─────────────────┤
│                        │   超大型   │             Q>3200              │
├────────────┼──────┼─────────────────┤
│                        │    小型    │              Q≤500              │
│                        ├──────┼─────────────────┤
│         移动式         │    中型    │           500<Q≤800            │
│ (Including gantry, bridge and trolley) ├------┼----------------------┤
│                        │    大型    │           800<Q≤2511           │
│                        ├──────┼─────────────────┤
│                        │   超大型   │             Q>2500              │
├────────────┼──────┼─────────────────┤
│                        │    小型    │             Q≤8 00              │
│                        ├──────┼─────────────────┤
│                        │    中型    │           800<Q≤1600           │
│         液压式         ├──────┼─────────────────┤
│                        │    大型    │          1600<Q≤3200           │
│                        ├──────┼─────────────────┤
│                        │   超大型   │             Q>3200              │

└────────────┴──────┴─────────────────┘

二、企业注册资金要求

┌────────────┬──────┬─────────────────┐

│-│-│ Specifications with a registered capital of not less than (Yuan) │

├────────────┼──────┼─────────────────┤

│                        │    小型    │                50                │

│                        ├──────┼─────────────────┤

│         螺杆式         │    中型    │               100                │

│                        ├──────┼─────────────────┤

│                        │    大型    │               300                │

├────────────┼──────┼─────────────────┤

│                        │    小型    │               100                │

│                        ├──────┼─────────────────┤

│       固定卷扬式       │    中型    │               200                │

│         移动式         ├──────┼─────────────────┤

│         液压式         │    大型    │               1000               │

│                        ├──────┼─────────────────┤

│                        │   超大型   │               2000               │ └────────────┴──────┴─────────────────┘
    Third, business personnel requirements
1, professional technical personnel
┌──────┬─────┬────┬──────────────┬────┐
│            │          │        │      工程师(含)以上      │其他技术│
Type │ size │ │ ├ number-----┬ ┬-----┤ personnel │
││││ Electrical and mechanical welding │ │ │ │
├──────┼─────┼────┼────┼────┼────┼────┤
│            │   小型   │   1    │   1    │        │        │        │
│            ├─────┼────┼────┼────┼────┼────┤
│   螺杆式   │   中型   │   2    │   2    │        │        │        │
│            ├─────┼────┼────┼────┼────┼────┤
│            │   大型   │   3    │   2    │        │        │   1    │
├──────┼─────┼────┼────┼────┼────┼────┤
│            │   小型   │   2    │   1    │        │        │   1    │
│            ├─────┼────┼────┼────┼────┼────┤
│ 固定卷扬式 │   中型   │   4    │   2    │   1    │        │   1    │
│   移动式   ├─────┼────┼────┼────┼────┼────┤
│            │   大型   │   8    │   3    │   1    │   2    │   2    │
│            ├─────┼────┼────┼────┼────┼────┤
│            │  超大型  │   11   │   4    │   3    │   2    │   2    │
├──────┼─────┼────┼────┼────┼────┼────┤
│            │   小型   │   2    │   1    │        │        │   1    │
│            ├─────┼────┼────┼────┼────┼────┤
│            │   中型   │   5    │   2    │   1    │   1    │   1    │
│   液压式   ├─────┼────┼────┼────┼────┼────┤
│            │   大型   │   8    │   2    │   2    │   2    │   2    │
│            ├─────┼────┼────┼────┼────┼────┤
│            │  超大型  │   10   │   4    │   2    │   2    │   2    │
    └──────┴─────┴────┴────┴────┴────┴────┘
    Note: other technicians are engineers, technicians and technologists.
2, welder
┌────┬────┬─────────────┬────┬────────┐
│││ Number of qualified Welders and welding methods │ │ welding position and base metal category │
│        │        │                          │        │    试件类型    │
│ │ ├ Product specifications product type-┬-┬------┼ ┼-----------┤
│        │        │      │焊条电弧│        │        │                │
│        │        │总人数│焊或气体│ 埋弧焊 │        │                │
│        │        │      │保护焊  │        │        │                │
├────┼────┼───┼────┼────┼────┼────────┤
Screw │ │ │ 2 │ │ 2 ││Ⅱ class, large PA (flat) │
├────┼────┼───┼────┼────┼────┼────────┤
│        │  小型  │  2   │   2    │        │  Ⅱ类  │                │
│        ├────┼───┼────┼────┼────┤  PF(立焊)    │
│  固定  │  中型  │  3   │   3    │        │  Ⅱ类  │                │
│ 卷扬式 ├────┼───┼────┼────┼────┼────────┤
│ │ Big │ ¦ 6 ¦ 4 2 II class specimen thicker than 12mm │
│        ├────┼───┼────┼────┼────┤的全位置合格焊工│
│ │ Super class ⅱ ¦ ¦ 10 ¦ 6 ¦ 4 ¦ not less than 2 persons │
├────┼────┼───┼────┼────┼────┼────────┤
│        │  小型  │  3   │   3    │        │ Ⅱ类   │试件厚度为10-   │
│ ├,-┼,-┼-┼,-┼-┤ 12mm all position qualified │
│        │  中型  │  4   │   4    │        │  Ⅱ类  │焊工不少于2人   │
│ 移动式 ├────┼───┼────┼────┼────┼────────┤
│ │ Big │ ¦ 10 ¦ 8 ¦ 2 II class specimen thicker than 12mm │
│        ├────┼───┼────┼────┼────┤的全位置合格焊工│
Super big │ │ │ │ 16 ¦ 12 ¦ 4 II class not less than 2 persons │
├────┼────┼───┼────┼────┼────┼────────┤
│        │  小型  │  2   │   2    │        │        │                │
│        ├────┼───┼────┼────┤        │                │
¦ ¦ Medium ¦ 2 1 1 │ │ II and VII class outer diameter scope │
│ ├-Hydraulic-┼ ┼-------┼-┤ │ products to meet needs and stainless steel, welded │
│ │ │ 2 │ big │ 3 1 │ │ class location for PF (pipe) │
│        ├────┼───┼────┼────┤        │                │
│        │ 超大型 │  6   │   3    │   3    │        │                │
    └────┴────┴───┴────┴────┴────┴────────┘
    Note: the sheet all position code: PA, PC, PE, PF.
3, non-destructive testing personnel
┌────┬────┬───┬───────────────────────┐
│││ Non-destructive testing qualification certificate and the number of non-destructive inspection │ │
│        │        │测人员├─────┬─────┬─────┬─────┤
│ │ │ │ Minority specifications ultrasonic magnetic particle inspection test │ │ │-ray penetration testing │
│        │        │  量  ├──┬──┼──┬──┼──┬──┼──┬──┤
││││ │ │ │ 2 level 3 level 2 level 3 level │ │ │ │ 2 level 3 level 2 level 3 level │
├────┼────┼───┼──┼──┼──┼──┼──┼──┼──┼──┤
│ 螺杆式 │  大型  │  2   │ 1  │    │    │    │ 1  │    │ 1  │    │
├────┼────┼───┼──┼──┼──┼──┼──┼──┼──┼──┤
│        │  中型  │  2   │ 1  │    │    │    │ 1  │    │ 1  │    │
│固定卷扬├────┼───┼──┼──┼──┼──┼──┼──┼──┼──┤
│式、移动│  大型  │  3   │ 2  │    │ 1  │    │ 1  │    │ 1  │    │
│式      ├────┼───┼──┼──┼──┼──┼──┼──┼──┼──┤
│        │ 超大型 │  4   │ 1  │ 1  │ 1  │    │ 1  │ 1  │ 1  │    │
├────┼────┼───┼──┼──┼──┼──┼──┼──┼──┼──┤
│        │  中型  │  2   │ 1  │    │    │    │ 1  │    │ 1  │    │
│        ├────┼───┼──┼──┼──┼──┼──┼──┼──┼──┤
│ 液压式 │  大型  │  3   │ 2  │    │ 1  │    │ 1  │    │ 1  │    │
│        ├────┼───┼──┼──┼──┼──┼──┼──┼──┼──┤
│        │ 超大型 │  3   │ 1  │ 1  │ 1  │    │ 1  │    │ 1  │    │

└────┴────┴───┴──┴──┴──┴──┴──┴──┴──┴──┘

Four, the main production equipment and process equipment requirements
┌───┬────┬────────────────────────────┐
│ │ Size │ main production equipment and process equipment │
├───┼────┼────────────────────────────┤
│ │ │ Worm small equipment (gear machine tools, lathe or whirling) │
│      ├────┼────────────────────────────┤
¦ ¦ Medium ¦ gear processing equipment (gear machine tools, lathe or whirlwind milling), welding machines, lifting equipment │
│螺杆式│        │(总起重量不低于5吨)                                   │
│      ├────┼────────────────────────────┤
│ │ Big │ gear processing equipment (gear machine tools, lathe or whirlwind milling), welding machines, lifting equipment │
│      │        │(总起重量不低于10吨)                                  │
├───┼────┼────────────────────────────┤
Small │ │ │ hobbing machine, drum machine (turning, milling, boring, etc), hoisting equipment (total weight │
│      │        │不低于5吨)、焊机                                       │
│      ├────┼────────────────────────────┤
│││ Hobbing machine (M12, φ 800mm), drum machine (lathe 1000mm │
On the medium │ │ │), other equipment (such as turning, milling, boring), the lifting equipment (total weight │
│固定卷│        │低于10吨)、焊机                                        │
│扬式、├────┼────────────────────────────┤
│ │ │ Hobbing machine (M20, φ 2200mm), drum machine (lathe 1500mm │
│ │ Big │ above), other equipment (such as turning, milling, boring), the lifting equipment (total weight │
│││ Less than 30 tonnes), automatic or semi-automatic welding machine │
│      ├────┼────────────────────────────┤
│││ Hobbing machine (M25, φ 2500mm), drum machine (lathe 2000mm │
Super big │ │ │ above), other equipment (such as turning, milling, boring), the lifting equipment (total weight │
│││ Is not less than 50 tonnes), automatic or semi-automatic welding machine │
├───┼────┼────────────────────────────┤
Small │ │ │ boring equipment or honing machines, cylindrical grinders, hydraulic test bench, lifting equipment (total lifting │
│      │        │量不低于5吨)                                           │
│      ├────┼────────────────────────────┤
│││ Boring equipment or deep hole honing machines (300mm, travel 6m), cylindrical grinders, │
│ │ │ Hydraulic test/tilt and other processing equipment (such as turning, milling, boring), welding machines, lifting equipment │
│      │        │(总起重量不低于10吨)                                  │
│液压式├────┼────────────────────────────┤
│││ Boring equipment or deep hole honing machines (420mm, travel 8M), cylindrical grinders, │
│ │ Big │ hydraulic test rig and other processing equipment (such as turning, milling, boring), welding machines, lifting equipment │
│      │        │(总起重量不低于20吨)                                  │
│      ├────┼────────────────────────────┤
│││ Boring equipment or deep hole honing machines (500mm, travel 10m), cylindrical grinders, │
Super big │ │ │ hydraulic test rig and other processing equipment (such as turning, milling, boring), welding machines, lifting equipment │
│      │        │(总起重量不低于30吨)                                  │

└───┴────┴────────────────────────────┘

Five main measuring instruments and testing equipment requirements
┌───┬────┬────────────────────────────┐
│ │ Size │ main measuring instruments and testing equipment │
├───┼────┼────────────────────────────┤
, Medium │ │ │ small screw gauges, Vernier Calliper, feeler, square │
│      ├────┼────────────────────────────┤
│ │ Big │ screw screw gauges, roughness specimens, Vernier Calliper, feeler, square, ultrasonic flaw detector, │
│      │        │磁粉探伤仪                                              │
├───┼────┼────────────────────────────┤
│      │  小型  │游标卡尺、塞尺、直角尺                                  │
│      ├────┼────────────────────────────┤
¦ ¦ Medium level, roughness specimens, Vernier Calliper, feeler, square, weld inspection, │
│││ Hardness tester, ultrasonic flaw detector, magnetic particle flaw detector │
│      ├────┼────────────────────────────┤
│││ Level, roughness specimens, Vernier Calliper, feeler, square, weld inspection, │
│ │ Big │ fixed volume hardness tester, ultrasonic flaw detector, steel tape, coating thickness, surface roughness │
Yang style, │ │ │ model (Rz), cross cut adhesion, magnetic particle flaw detector, radiation detector for │
│移动式├────┼────────────────────────────┤
│││ Level, roughness Tester, Vernier Calliper, feeler, square, weld testing │
Super big │ │ │ feet, hardness tester, ultrasonic flaw detector, steel tape, coating thickness, surface rough │
Model │││ roughness (Rz), cross cut adhesion, magnetic particle flaw detector, radiation detector for │
├───┼────┼────────────────────────────┤
│ │ │ Roughness specimens, Vernier caliper, small square │
│      ├────┼────────────────────────────┤
¦ ¦ Medium roughness Tester, slide gauge, square, coating thickness gauges, ultrasonic │
│      │        │仪、磁粉探伤仪                                          │
│      ├────┼────────────────────────────┤
│││ Roughness Tester, slide gauge, square, tape measure coating thickness gauge, steel, weld │
│ │ Big │ hydraulic testing, hardness tester, ultrasonic flaw detector, hydraulic oil contamination detector, magnetic │
│      │        │粉探伤仪、射线探伤机                                    │
│      ├────┼────────────────────────────┤
│││ Roughness Tester, slide gauge, square, tape measure coating thickness gauge, steel, weld │
Super big │ │ │ testing, hardness tester, ultrasonic flaw detector, hydraulic oil contamination detector, magnetic │
│      │        │粉探伤仪、射线探伤机                                    │

└───┴────┴────────────────────────────┘

    Six, the quality management system requirements The quality management system including quality management, technology management, process management, marketing services, content management and material management.