Lightning design review and acceptance requirements

    (July 22, 2011, the China Meteorological Administration released as of September 1, 2011, 21st) Chapter I General provisions

    First in order to standardize the lightning protection devices (hereinafter referred to as lightning) design review and acceptance work and safeguard national interests, protect people's lives and property and public security, according to the People's Republic of China Meteorological law, the People's Republic of China on administrative licensing law and the prevention of meteorological disasters and other relevant provisions of the Ordinance, these rules are formulated. Second meteorological departments at and above the county level shall be responsible for the design of lightning protection device within the administrative area of auditing and acceptance work.

    There is no meteorological departments of the County (City), the upper-level lightning protection design of meteorological authorities are responsible for auditing and acceptance work.

    Article design auditing and acceptance work of lightning protection device shall follow the open, fair, just and convenient, efficient, and the principle of trust protection.

    Following construction of the fourth article (structure), location and facilities of lightning protection devices shall be subject to design review and acceptance:

    (A) the provisions of the code for design of building lightning protection lightning I, II, III class buildings;

    (B) oil, gas, refueling stations, liquefied natural gas, oil (gas) pipe, valve room and facilities within explosion and fire hazard atmospheres;

    (C) telecommunications, transport, radio and television, medicine and health, finance and securities, education, unmovable cultural relics, sport, tourism, recreation and other public services and facilities and a variety of electronic information systems;

    (D) the lightning protection devices should be installed in accordance with the relevant provisions of other venues and facilities. The fifth lightning protection device design without approval, no delivery and construction.

    Lightning protection device for completion without the acceptance of, and shall not be put into use.

    Construction, reconstruction and expansion engineering of mine must be simultaneously with the principal part of the project designed, built and put into use.

    Sixth lightning design review and acceptance of procedures, instruments should be publicized in accordance with law.

    Lightning protection device design chapter review Seventh lightning protection device designed to implement audit systems.

    Construction should apply to the meteorological departments, filling out of the lightning protection device design review application form (Schedule 1, schedule 2).

    Construction application for building, rebuilding, expansion of building (structure) when you design a document review, shall also apply for design of lightning protection device examination.

    Preliminary design review section eighth for lightning protection device shall submit the following materials:

    (A) of the lightning protection device design applications (Schedule 3);

    (B) the General plan;

    (C) design and copies of certificates of qualification and certification of personnel;

    (D) preliminary design of lightning protection device specification and preliminary design drawings and related information;

    Project of lightning disaster risk assessment is needed, lightning disaster risk assessment report shall be submitted.

    The Nineth construction design of lightning protection device examination the applicant shall submit the following materials:

    (A) of the lightning protection device design applications (Schedule 3);

    (B) design and copies of certificates of qualification and certification of personnel;

    (C) the construction design of lightning protection device specifications, construction drawings and related information;

    (Iv) the design of mine used in product-related information;

    (E) recognized by the local meteorological departments lightning protection technology of lightning protection device design of the technical evaluation report issued by the Agency.

    Lightning protection device has not been designed, shall submit a general plan; after a preliminary design, lightning protection devices shall be submitted to the approval of preliminary design advice (table 4).

    Tenth lightning design review application meets the following conditions, shall be accepted.

    (A) the design has obtained the required qualifications, units and personnel qualifications;

    (B) the applicants submitted application materials are complete and comply with the statutory format;

    (C) require lightning disaster risk assessment project, presented a lightning disaster risk assessment report. 11th lightning design review application materials are incomplete or do not comply with the statutory format, meteorological departments shall, within five working days as of receipt of the application materials again inform all applicants need to supplement content and issue of the lightning protection device design data correction notice (schedules 5 and 6).

    Fails to inform the, material from the date of receipt of the application will be deemed accepted. 12th meteorological departments should be in receipt of all application materials within five working days, in accordance with the People's Republic of China Law on administrative licensing provisions of 32nd, according to admissible under these provisions to accept or not to accept a written decision, and decided to accept the petition issued by the lightning protection device design receipt of acceptance (table 7).

    Inadmissible, shall state the reasons in writing.

    13th lightning design content:

    (A) the legitimacy of the application materials;

    (B) the lightning design documents for compliance with relevant standards and use requirements prescribed by the competent Meteorological Department under the State Council.

    14th meteorological departments should be completed within 20 working days from the date of acceptance of audit work. Lightning design documents meet the requirements upon examination, meteorological departments should conclude on auditing procedures, issuing approval submissions for design of lightning protection device (table 8). Construction units should be carried out in accordance with the approved design drawings and construction.

    Need lightning protection design changes and modifications during construction, an application shall, in accordance with the program design. Design of lightning protection device does not meet the requirements upon examination, meteorological departments issued the book of lightning protection device design changes (Schedule 9).

    Applicant design modifications, according to the original program application for design review.

    Chapter III lightning protection device acceptance 15th lightning practice the acceptance system.

    Construction should apply to the meteorological departments, fill in the lightning protection device of final acceptance of the application form (Appendix 10).

    Building, rebuilding, expansion of building (structure) when it is completed, the construction unit shall notify the local meteorological departments and acceptance of lightning protection device.

    16th lightning acceptance shall submit the following materials:

    (A) of the lightning final acceptance of the application form (Appendix 10);

    (B) the lightning protection design approval submissions;

    (C) construction qualification certificate and copy of workers ' qualification certificate;

    (D) the qualification made lightning detection unit of the lightning protection device test report;

    (E) the lightning as-built drawings and other technical information;

    (F) the mine factory certification, installation records and meet the requirements prescribed by the competent Meteorological Department under the State Council document.

    17th lightning acceptance apply subject to the following conditions, shall be accepted.

    (A) design of lightning protection device achieves local meteorological authorities issued by the lightning protection design approval submissions;

    (B) contractors and staff qualifications and qualifications prescribed by the State;

    (C) the complete application materials submitted by the applicant and in accordance with the prescribed form. 18th lightning acceptance to the application materials are incomplete or do not comply with the statutory format, meteorological departments shall, within five working days as of receipt of the application materials again inform all applicants need to supplement content and issue of the lightning protection device acceptance data correction notice (Schedule 11).

    Fails to inform the, material from the date of receipt of the application will be deemed accepted. 19th meteorological departments should be in receipt of all application materials within five working days, in accordance with the People's Republic of China Law on administrative licensing provisions of 32nd, according to admissible under these provisions to accept or not to accept a written decision, and decided to accept the petition issued by the lightning protection device acceptance receipt of acceptance (table 12).

    Inadmissible, shall state the reasons in writing.

    20th lightning final acceptance of content:

    (A) the legitimacy of the application materials;

    (B) installation of lightning protection device does comply with the relevant national standards and use requirements prescribed by the competent Meteorological Department under the State Council;

    (C) installation of lightning protection device is in compliance with the approved construction drawings completion.

    21st meteorological departments should receive acceptance within ten working days from the date of conclusion.

    Lightning protection device experience meet the requirements of the resumption, meteorological departments should conclude on inspection procedures, issued by the lightning of the acceptance (table 13). Lightning protection device does not meet the requirements of acceptance, meteorological departments lightning protection devices shall issue a corrective advice (table 14).

    After the corrective action is completed, reapply for acceptance under the original procedure.

    Supervision and administration of the fourth chapter

    22nd the applicant shall not be fraud, bribery or other means to make an application or license; lightning protection device shall not be altered or forged design review and final acceptance of the relevant materials or documents. 23rd local meteorological authorities above the county level shall strengthen the lightning design review and acceptance of supervision and inspection, establish and perfect the supervision system, in discharging its oversight responsibilities.

    The public right of access supervision and inspection records.

    Meteorological departments should strengthen the 24th superior subordinate meteorological departments lightning protection device design auditing and acceptance work supervision and inspection, and correcting violations in a timely manner.

    25th meteorological departments at and above the county level shall conduct mine equipment design review and acceptance of supervision and inspection, shall be without prejudice to the normal production and operation activities shall not solicit or accept any property and reap other benefits.

    26th found illegal units and individuals engaged in mine equipment design review and acceptance activities, local meteorological departments at or above the county level shall be entitled to report meteorological departments at and above the county level shall be verified, processed in a timely manner.

    27th local meteorological authorities above the county level while performing their duties of supervision and inspection, the right to take the following measures:

    (A) requested by units or individuals for examination building construction planning permission, lightning protection device design drawings and other documentation and information, consulting or copying;

    (B) were from units or individuals for examination of building lightning protection device design, installation, testing, inspection and use of description of the situation;

    (C) check from entering the building.

    28th local meteorological departments at and above the county level shall conduct mine design review and acceptance monitoring and checking, relevant units and individuals shall support and collaboration, and provide convenience for work shall not refuse and impede performing official duties according to law.

    Article 29th lightning design review and acceptance of supervision and inspection personnel should be trained, after passing the examination, may engage in supervision and inspection work.

    Chapter fifth penalty

    Article 30th units hide the application design review, providing false information or the final acceptance of the license, meteorological departments concerned inadmissible or refusing to license, and given a warning.

    31st applications unit by fraud, bribery or other improper means through a design review or acceptance of, warnings about the meteorological departments in accordance with the permission granted, revoke its license, fines of between 10,000 yuan and 30,000 yuan constitutes a crime, criminal responsibility shall be investigated according to law.

    32nd breach of these provisions, any of the following acts, meteorological departments above the county level in accordance with the permission shall be ordered to correct, given a warning and can be fined a maximum of 50,000 yuan and 100,000 yuan and cause damage to others shall bear liability constitutes a crime, criminal responsibility shall be investigated in accordance with law:

    (A) the altered or forged lightning design review and acceptance of relevant materials or documents;

    (B) withheld relevant information from supervision and inspection agencies, providing false information or refuse to provide authentic materials reflect its activities;

    (C) meteorological departments lightning protection device design without the approval of unauthorized construction;

    (D) the meteorological departments lightning protection device for completion without the acceptance of unauthorized use.

    33rd local meteorological authorities above the county level found in the supervision and inspection of illegal act constitutes a crime, it shall transfer the relevant organs, shall be investigated for criminal liability does not constitute a crime, shall be given an administrative penalty.

    34th State functionaries in the lightning design auditing and acceptance work due to malpractice, resulting in significant lightning accidents, shall be given administrative sanctions by the unit constitutes a crime, criminal responsibility shall be investigated according to law.

    35th in violation of this provision causes lightning caused fires, explosions and casualties and heavy loss of State or another person's property, directly responsible for administrative sanctions by the competent Department constitutes a crime, criminal responsibility shall be investigated according to law.

    The sixth chapter supplementary articles

    Article 36th in all provinces, autonomous regions and municipalities directly under the meteorological departments in accordance with the implementing rules for the regulations and submitted to the competent Meteorological Department under the State Council for the record. 37th article of the regulations come into force September 1, 2011.

    April 1, 2005, published by the China Meteorological Administration, the lightning design review and acceptance regulations repealed simultaneously.

    Attachment: People's Republic of China relevant provisions in the administrative licensing law

    The 32nd Executive to the applicants ' application for administrative license shall be made according to the following circumstances:

    (A) the application does not need an administrative license in accordance with law, shall immediately inform the applicant will not be accepted;

    (B) the application does not belong to the terms of reference of the executive authorities in accordance with law, shall immediately make a decision inadmissible, and inform the applicant to apply to the relevant administrative authorities;

    (C) application errors that can be corrected on the spot, shall permit the applicant to be corrected on the spot;

    (D) the application materials are incomplete or not in compliance with the statutory form, shall, on the spot or within the 5th time inform all applicants need to correct content, fails to inform the, shall be accepted as of the date of receipt of the application materials;

    (V) application belongs to the administrative body terms of reference, application materials are complete and comply with the statutory format, all in accordance with the requirements of the administrative authority or the applicant corrected application, shall accept administrative licensing applications.

    Executive to accept or not to accept an application for administrative license shall issue a dated and stamped with the Special seal of the Executive in written form.

    Schedule: 1. of the lightning protection device design review submission form (preliminary design)

    2. the lightning design review application form (detailed design)

    3. the book of lightning protection device design review application (preliminary design working drawing design)

    4. the opinion on the preliminary design of lightning protection device approved

    5. the design of lightning protection device data correction notice (preliminary design)

    6. the design of lightning protection device data correction notice (detailed design)

    7. lightning protection device design of the receipt of acceptance (initial design construction design)

    8. the opinion on the design of lightning protection device approved

    9. the book of lightning protection device design changes

    10. the lightning of final acceptance of the application form

    11. the lightning acceptance of data correction notice

    12. the lightning acceptance receipt of acceptance

    13. of the lightning protection device acceptance

    14. the lightning opinion on the corrective

Appendix 1: lightning protection device design review submission form (preliminary design)
┌──────┬───────┬────┬─────┬────┬─────────────┐
│  申请单位  │              │联系电话│          │  传真  │                          │
│名称(公章)│              ├────┼─────┼────┼─────────────┤
│            │              │ 联系人 │          │  手机  │                          │
├──────┼───────┴────┴─────┴────┴─────────────┤
│  项目名称  │                                                                          │
├──────┼─────────────────────────────────────┤
│  项目地址  │                                                                          │
├──────┼───────┬────┬─────┬────┬─────────────┤
│设计单位名称│              │  联系人│          │联系电话│                          │
├──────┼───────┴────┴─────┴────┴─────────────┤
│ Size │ buildings unit ______ (); total floor area of ______ sqm maximum building height ______ meters; total │                                                            │            │地面积______。

├──────┼─────────────────────────────────────┤
│  建设项目  │                                                                          │
│  使用性质  │                                                                          │
├──────┴─────────────────────────────────────┤
│送审资料:                                                                              │
│    1.《防雷装置设计审核申请书》;                                                      │
│    2.总规划平面图;                                                                    │
│ 3. design units and personnel qualification, qualification certificate copy; │
│ 4. preliminary design specification (including meteorological data, design, formula, direct lightning protection and lightning electromagnetic pulse prevention │
│ Protection lightning protection measures, product selection, and so on) and preliminary design drawings (including ground floor plan, floor plan layout of jieshan, SPD design schematic │
│图、建筑图、结构图等);                                                                │
│ 5. construction, structures, fire protection, air conditioning, plumbing, strong, weak, such as preliminary design information │                                                            │ 6. lightning disaster risk assessment report.
│                │ Applicant shall submit information according to the standard binding, together with the competent meteorological audit watch.

├────────────────────────────────────────────┤                                                    │ Submit information missing, please complete as soon as possible.

│                                                                                        │
│经办人:            年    月    日                                                      │
├────────────────────────────────────────────┤ │ Approval information is agreed upon.                        Project number: (a) mine [].

│                                                                                        │
│经办人:            年    月    日                                                      │
                                                                 └────────────────────────────────────────────┘

Reporting time: year month day

Appendix 2: lightning protection device design review application form (detailed design)
┌──────┬─────────────┬──────┬────────┬──────┬────────┐
│  申请单位  │                          │  联系电话  │                │    传真    │                │
│名称(公章)│                          ├──────┼────────┼──────┼────────┤
│            │                          │   联系人   │                │    手机    │                │
├──────┼─────────────┼──────┴─┬──────┴──────┴────────┤
│  项目名称  │                          │  预计开工时间  │                                            │
├──────┼─────────────┼────────┼──────────────────────┤
│  项目地址  │                          │  预计竣工时间  │                                            │
├──────┼────────┬────┼────────┼─────────┬────────────┤
│设计单位名称│                │ 联系人 │                │     联系电话     │                        │
├──────┼──────┬─┴─┬──┴┬─────┬─┴────┬────┴─┬──────┬───┤
Structure type name │ │ │ building an area of layer height │ │ │ │ category lightning protection of soil in power │ │ │
│ │ (See note II) │ │ (layer) │ │ (m) │ │ (sq) │ │ (refer to note c) │ │ (see note d) │ │ (see note e) │ │
├──────┼──────┼───┼───┼─────┼──────┼──────┼──────┼───┤
│            │            │      │      │          │            │            │            │      │
├──────┼──────┼───┼───┼─────┼──────┼──────┼──────┼───┤
│            │            │      │      │          │            │            │            │      │
├──────┼──────┴───┴───┴─────┴──────┴──────┴──────┴───┤
│项目简要说明│                                                                                          │
├──┬───┴─────────────────────────────────────────────┤
│    │一、送审资料:                                                                                    │
│    │    1.《防雷装置设计审核申请书》;                                                                │
│ │ 2. design units and personnel qualification, qualification certificate copy; │
│ │ 3. lightning protection device construction design specifications and construction design drawing two sets and electronic documentation; │
│ │ 4. master plan approved by the Planning Department the two sets (original or copy, copy stamped with the seal of the unit you want), │
│    │    5.建筑施工图及其电子文档;                                                                    │ │    │    6.结构施工图;                                                                                │
│ │ 7. lightning and other building-related construction (water, electricity, fire, gas, metal frame detail, SPD installation), │
│ │ 8. industrial building production process, material distribution, information storage, dangerous places; │
│ │ 9. tank material, wall thickness, storage configuration, storage pressure data and information │
│ 说 │    10.防雷产品相关资料;                                                                         │
│ │ Ming 11. after a preliminary design of the submission of the preliminary design of lightning protection device approval; │                           │ │ 12. recognized by the local meteorological departments lightning protection technical evaluation issued by professional and technical bodies.
│                          │ │ The applicant submitting information should be according to the standard binding, together with the competent meteorological audit watch.

│ │ B, type fill in: a, brick and wood; b, mixture c, reinforced concrete, steel d │
│    │    三、使用类别填写:                                                                            │
│ │ A1. category B1 plant, warehouse ... education, health care, scientific research, Sports Hall C1. advanced composite construction D1. General building A2. b plant, warehouse B2. │
│ │ Theaters, halls, clubs, travel to C2. high-rise D2. residential, apartment A3. c warehouse B3. bin, entertainment, financial, commercial, C3. large │
│ │ Factory, c building D3. General plant, warehouse A4. oil, gas station (district), boiler room B4. transport, communications, water, electricity, gas and C4. Special │
│    │形建筑物D4.其他                                                                                   │
│ │ SI, power filled in: a. overhead line b. own electricity distribution room c. buried into the line of │
│ │ V, soil to fill in: a. Rock b. c. common d. soft │
├──┴─────────────────────────────────────────────────┤                                                                  │ Submit information ______ of the missing items, please complete as soon as possible.

│                                                                                                        │
│经办人:                   年    月    日                                                               │
├────────────────────────────────────────────────────┤ │ Approval information is agreed upon.                                             Item no: (a) mine [].

│                                                                                                        │
│经办人:                   年    月    日                                                               │

└────────────────────────────────────────────────────┘

Appendix 3:

Lightning design review

Application

申请单位(公章):_____________________

申请项目:_____________________________
                           Design phase: preliminary design working drawing design

_____________________________

Application time: ______ ______ ________ year month day
┌─┬───────┬─────────────────────────┐
│  │     名称     │                                                  │
│  ├───────┼─────────────────────────┤
│项│     地址     │                                                  │
│目├───────┼─────────────────────────┤
│ │ Size │ buildings unit ______ (); total floor area of ______ sqm; most │      │ │ │ Conditions building height ______ meters high, and covers an area of ______ sqm.

│  ├───────┼─────────────────────────┤
│  │   使用性质   │                                                  │
├─┼───────┼─────────────────────────┤
│建│     名称     │                                                  │
│设├───────┼─────────────┬────┬──────┤
│单│     地址     │                          │邮政编码│            │
│位├───────┼─────────────┼────┼──────┤
│  │    联系人    │                          │联系电话│            │
├─┼───────┼─────────────┴────┴──────┤
│  │     名称     │                                                  │
│  ├───────┼─────────────┬────┬──────┤
│设│     地址     │                          │邮政编码│            │
│计├───────┼─────────────┼────┼──────┤
│单│  资质证编号  │                          │资质等级│            │
│位├───────┼─────────────┼────┼──────┤
│  │  资格证编号  │                          │联系电话│            │
├─┴───────┴─────────────┴────┴──────┤
│ Inflammable and explosive products, chemical goods │
├─────────┬─────────────────────────┤
│                  │                 数量(吨/每年)                 │
│       品名       ├─────┬────┬────┬────┬────┤
│                  │   生产   │  使用  │  储存  │  运输  │  经营  │
├─────────┼─────┼────┼────┼────┼────┤
│                  │          │        │        │        │        │
├─────────┼─────┼────┼────┼────┼────┤
│                  │          │        │        │        │        │
├─────────┼─────┼────┼────┼────┼────┤
│                  │          │        │        │        │        │
├─────────┼─────┼────┼────┼────┼────┤
│                  │          │        │        │        │        │
├─────────┼─────┼────┼────┼────┼────┤
│                  │          │        │        │        │        │
├─────────┼─────┼────┼────┼────┼────┤
│                  │          │        │        │        │        │
├─────────┼─────┼────┼────┼────┼────┤
│                  │          │        │        │        │        │
├─────────┴─────┴────┴────┴────┴────┤
│                           电子信息系统情况                           │
├─────────┬─────────────────────────┤
Device configuration and architecture name │ │ │
├─────────┼─────────────────────────┤
│                  │                                                  │
├─────────┼─────────────────────────┤
│                  │                                                  │
├─────────┼─────────────────────────┤
│                  │                                                  │
├─────────┼─────────────────────────┤
│                  │                                                  │
├─────────┼─────────────────────────┤
│                  │                                                  │
├─────────┼─────────────────────────┤
│                  │                                                  │
├─────────┴─────────────────────────┤
│设计简介:                                                            │
│                                                                      │
│                                                                      │
│                                                                      │
│                                                                      │
│                                                                      │
│                                        经办人:    年    月    日    │
├───────────────────────────────────┤
│                                                                      │
│                                                                      │
│                                                                      │
│                                                                      │
│                                                                      │
│ Applicant (seal): Attn: date │
├───────────────────────────────────┤
│办理结果:                                                            │
│                                                                      │
│                                                                      │
│                                                                      │
│                                                                      │
│                                                                      │
Meteorological departments │ (sealed): Attn: date │

└───────────────────────────────────┘

Appendix 4:

Lightning protection device approved preliminary design submissions

Project number: () Ray trial word []

_____________________________(单位):

__________________ You report to preliminary design of lightning protection device information, audited, in line with national technical specifications and requirements of the relevant laws and regulations in force, granted the preliminary design for the construction drawing design.

(Official seal)

Year month day

Appendix 5:

Design of lightning protection device data correction notice

(Preliminary design)

Project number: () Ray trial word []

_____________________________(单位):

__________________ You report to preliminary design of lightning protection device information received, the data are not yet available, please complete the following to play "√" information in order to go through the audit procedures.

-The book of lightning protection device design review application;

-Design qualification certificate copy;

-Design qualification certificate copy;

-General plan;

-Preliminary design of lightning protection device instruction manual (including meteorological data, design, formula, direct lightning protection, lightning protection lightning electromagnetic pulse protection measures, product selection, etc);

-Lightning protection device to preliminary design drawings (including ground floor plan layout, Flash Player plan, SPD design diagrams, architecture diagrams, charts, etc);

Preliminary design-construction information;

-Structural preliminary design information;

Preliminary design-fire;

-Preliminary design of air conditioning materials;

-Water supply and drainage design information;

Preliminary design-strong professional information;

-Weak professional preliminary design data;

-Lightning disaster risk assessment report;

-Other information.

(Official seal)

Year month day

Appendix 6:

Design of lightning protection device data correction notice

(Detailed design)

Project number: (a) mine []

_____________________________(单位):

You unit to __________________ construction design of lightning protection device of information received, the data are not yet available, please complete the following to play "√" information in order to go through the audit procedures.

-The book of lightning protection device design review application;

-Design qualification certificate copy;

-Design qualification certificate copy;

-The preliminary design of lightning protection device approval submissions;

-Lightning protection device design drawings to ______, ______ electronic documents;

-Master plan approved by the Planning Department ______ (original or copy, copy be stamped with the seal of the unit);

-Construction drawing ______, ______ electronic documents;

-Construction design of lightning protection device description;

-Structure construction drawing set;

-Electrical construction drawings;

-Fire safety construction plan set;

-Gas pipeline construction set;

-Metal frame detail;

SPD-information system installation;

-Lightning protection product-related information;

Design-technical evaluation report;

-Other information.

(Official seal)

Year month day

Appendix 7:

Items accepted:

Lightning design review acceptance receipt

(Preliminary design working drawing design)

Applicant:

Institution code: Sponsor:

Application:

Date of receipt: completed in time period:

Matters needing attention

1. This voucher receipt for collection of data and receiving processing results, in order to be able to successfully go through the relevant formalities, make sure you keep the receipt.

2. If the application needs to modify, Supplement, or field inspection is required after the rectification, concluded the period until further notice.

3. project admissibility number or organization code, acted in a window or on the Internet and browse through information.

4. If it is a matter had been concluded, and ask you to carry identity documents and accepted receipt to the Office window to get results.

The accepting institution (sealed): accept date: year month day

经办人:                            查询电话:

Query URL: Tel:

Appendix 8:

Lightning protection device designed to approve submissions

Project number: (a) mine []

_____________________________(单位):

__________________ You report to lightning protection device design information, audited, in line with current national technical specifications and requirements of the relevant laws and regulations, grant for the lightning protection device in construction procedures.

(Official seal)

Year month day

Table 9:

Lightning protection device designed to modify submissions

Project number: (a) mine []

_____________________________(单位):

You report to the ___________________ lightning protection device (preliminary design construction design), upon examination, does not meet the requirements, please follow the advice below to modify after examination. Modified as follows (attach a separate page):
                                                      (Official seal)

Year month day

Table 10:

Lightning protection device acceptance

Application

申请单位(公章):______________________________

申请项目:______________________________________

Application time: ______ ______ months _______ years
┌─────┬─────────────────────────────┐
│ 项目名称 │                                                          │
├─────┼─────────────────────────────┤
│ 项目地址 │                                                          │
├─────┴───────────┬─────────────────┤
│ The number of submissions approved by the lightning protection device design │ │
├─────────────────┼─────────────────┤
│     《防雷装置检测报告》编号     │                                  │
├────────┬────────┴─┬────┬──────────┤
│    开工时间    │                    │竣工时间│                    │
├──┬─────┼──────────┴────┴──────────┤
│    │   名称   │                                                    │
│ 建 ├─────┼──────────┬────┬──────────┤
│ 设 │   地址   │                    │邮政编码│                    │
│ 单 ├─────┼──────────┼────┼──────────┤
│ 位 │  联系人  │                    │联系电话│                    │
├──┼─────┼──────────┴────┴──────────┤
│    │   名称   │                                                    │
│ 设 ├─────┼────────────┬────┬────────┤
│ 计 │   地址   │                        │邮政编码│                │
│ 单 ├─────┼────────────┼────┼────────┤
│ 位 │  联系人  │                        │联系电话│                │
│    ├─────┼────────────┼────┼────────┤
│    │资质证编号│                        │资质等级│                │
├──┼─────┼────────────┴────┴────────┤
│    │   名称   │                                                    │
│    ├─────┼────────────┬────┬────────┤
│ 施 │   地址   │                        │邮政编码│                │
│ 工 ├─────┼────────────┼────┼────────┤
│ 单 │资质证编号│                        │资质等级│                │
│ 位 ├─────┼────────────┴────┴────────┤
│    │资格证编号│                                                    │
│    ├─────┼────────────┬────┬────────┤
│    │现场负责人│                        │联系电话│                │
├──┼─────┼────────────┴────┴────────┤
│    │ 防雷类别 │                                                    │
│    ├─────┴──────────────────────────┤
│ 项 │                                                                │
│ 目 │                                                                │
│ 概 │                                                                │
│ 况 │                                                                │
│ │ Note: construction projects, building name, quantity, total construction area of │                                                          │ │ Information.

├──┴────────────────────────────────┤
│送审材料:                                                            │
│ 1. lightning protection device acceptance of applications; 2. the lightning protection design approval submissions; │
│ 3. contractors and staff qualifications, credentials, 4. lightning as-built drawing; │
│ 5. lightning protection installation record 6. lightning protection products certificate; │
│ 7. lightning products test reports, 8. the lightning detection report │
├────────────────┬──────────────────┤
│ Unit (sealed): │ construction unit (sealed): │
│                                │                                    │
│                                │                                    │
│                                │                                    │
│                                │                                    │
│经办人:                        │经办人:                            │
│                                │                                    │
│                                │                                    │
│              年    月    日    │                  年    月    日    │
├────────────────┴──────────────────┤
│防雷装置检测机构(公章):                                            │
│                                                                      │
│                                                                      │
│                                                                      │
│                                                                      │
│                                                                      │
│                                                                      │
│               经办人:                             年    月    日    │
├───────────────────────────────────┤
│气象主管机构(公章):                                                │
│                                                                      │
│                                                                      │
│                                                                      │
│                                                                      │
│                                                                      │
│                                                                      │
│               经办人:                             年    月    日    │
├───────────────────────────────────┤
│办理结果:                                                            │
│                                                                      │
│                                                                      │
│                                                                      │
│                                                                      │
│                                                                      │
│                                                                      │
│               经办人:                             年    月    日    │

└───────────────────────────────────┘

Table 11:

Lightning final acceptance of data correction notice

Project number: (a) mine inspection []

_____________________________(单位):

__________________ You report to lightning final acceptance of information received, the data are not yet available, please complete the following to play "√" information so that the acceptance formalities.

-The book of lightning protection device acceptance application;

-The lightning protection design approval submissions;

-Construction units and personnel qualification, qualification certificate copy;

Lightning protection devices-as-built drawing;

-Lightning protection installation records;

-Lightning protection products certificate of quality;

-Lightning products test reports;

-Lightning protection device test report;

-Other materials.

(Official seal)

Year month day

Table 12:

Items accepted:

Lightning protection device acceptance acceptance receipt

Applicant:

Institution code: Sponsor:

Application:

Date of receipt: completed in time period:

Matters needing attention

1. This voucher receipt for collection of data and receiving processing results, in order to be able to successfully go through the relevant formalities, make sure you keep the receipt.

2. If the application needs to modify, Supplement, or field inspection is required after the rectification, concluded the period until further notice.

3. project admissibility number or organization code, acted in a window or on the Internet and browse through information.

4. If it is a matter had been concluded, and ask you to carry identity documents and accepted receipt to the Office window to get results.

The accepting institution (sealed): accept date: year month day

经办人:                           查询电话:

Query URL: Tel:

Table 13:
┌───────────────────────────────────┐
│                                                 雷验No:             │
│                                                                      │
│                          防雷装置验收意见书                          │
│                                                                      │
│    项目名称:                                                        │
│                                                                      │
│    建设单位名称:                                                    │
│                                                                      │
│    项目地址:                                                        │
│                                                                      │
│ Acceptance, lightning protection equipment comply with the relevant national standards referred to above and the use of meteorological departments under the State Council │                                                                │ Requirements.

│                                                                      │
│                                                                      │
│                                                 (公章)             │
│                                                                      │
│                                                  年    月    日      │
│                                                                      │
│                                                                      │
│附:防雷装置检测报告编号:                                            │

└───────────────────────────────────┘

Table 14:

Lightning rectification opinions

_____________________________(单位):

You ______________________________________ lightning protection device of the unit construction, site inspection, do not meet the national standard and quality standard of specifications, please follow the following corrective actions as soon as possible rectification, rectification is complete before the acceptance formalities.
    Corrective action as follows:
    1.

___________________________________________________________
    2.

___________________________________________________________
    3.

___________________________________________________________
    4.

___________________________________________________________
    5.

___________________________________________________________

___________________________________________________________

___________________________________________________________

(Official seal) Year month day