    (Released July 29, 2011, the China Meteorological Administration, the 22nd since as of September 1, 2011) Chapter I General provisions

    First in order to strengthen the management of lightning protection engineering professional qualification, lightning protection engineering design and construction specifications, to protect national interests, protect people's lives and property and public security, according to the People's Republic of China Meteorological law, the People's Republic of China on administrative licensing law and the prevention of meteorological disasters and other relevant provisions of the Ordinance, these measures are formulated. Article in the People's Republic of China territory engaged in mine engineering design or construction of the units, in accordance with the provisions of these measures shall be applied for mine engineering design and construction quality.

    After being found qualified, lightning protection engineering design achieved the qualification certificate or mine engineering professional construction qualification certificate after the range under the qualification engaged in mine engineering design or construction.

    Lightning protection engineering professional qualification is divided into design article qualification and two types of qualification, qualification level is divided into a, b, and c levels. The competent Meteorological Department under the State Council in charge of the national management of lightning protection engineering professional qualification, assume lightning protection engineering design and construction for class-a qualification recognition.

    The provinces, autonomous regions and municipalities within the meteorological authorities are responsible for the administrative management of lightning protection engineering professional qualification, assume lightning protection engineering for b and c-grade design and construction quality of the work.

    Fourth qualification units can engage in the design of building lightning protection provides the first class, second class and third class mine buildings, and a variety of venues and facilities for mine engineering design or construction.

    Qualification units can engage in the design of building lightning protection the second class and third class mine buildings, and a variety of venues and facilities for mine engineering design or construction.

    Class c qualification units can engage the provisions of the code for design of building lightning protection lightning protection lightning protection engineering of the building of the third kind of design or construction.

    Immovable cultural relics of lightning protection engineering design or construction shall be borne by the above qualification b units.

    Article fifth mine engineering design qualification certificate and the mine engineering-professional construction qualification certificate of originals and copies, printed by the competent Meteorological Department under the State Council unity.

    Sixth mine engineering professional qualification cognizance shall follow the open, fair, just and convenient, efficient, and the principle of trust protection.

    Seventh mine products in the production, distribution, development of lightning protection engineering design unit may apply for qualification.

    Chapter II qualifications requirements

    Section eighth for lightning protection engineering design or construction qualification units must meet the following basic conditions:

    (A) the status of enterprise legal persons;

    (B) have a fixed office space and mine engineering design or construction of equipment and installations;

    (C) engaged in mine engineering and technical personnel must obtain a certificate of the mine engineering qualifications;

    (D) mine engineering design or construction professional norms, standards and other information and archive storage conditions;

    (E) the establishment of quality assurance systems, with essential conditions and improve the safety rules and regulations.

    Nineth qualification units in addition to the application for the article eighth of the basic conditions, should also comply with the following conditions:

    (A) the registered capital of RMB 1.5 million or more; (B) commensurate with the business of lightning protection engineering technicians and associate professionals.

    Achieved certificate of the mine engineering qualifications in professional and technical personnel, three or more with mine-related senior professional titles, six more than mine-related intermediate technical title;

    (C) the total lightning protection engineering for nearly three years to complete no less than 8 million yuan of lightning protection engineering work performed by no less than 20, each contract worth no less than 300,000 yuan, of which at least one contract worth no less than 1.5 million Yuan;

    (Iv) assume lightning works shall be subject to design review and acceptance of local meteorological departments;

    (E) obtain qualification for more than three years, annual examination each year.

    The tenth unit of qualification in addition to the application for the article eighth of the basic conditions, should also comply with the following conditions:

    (A) the registered capital of RMB 800,000 or more; (B) commensurate with the business of lightning protection engineering technicians and associate professionals.

    Made anti-mine engineering qualification certificate of professional technicians in the, two name above has anti-mine related professional senior technology titles, four name above has anti-mine related professional intermediate technology titles (three) near three years within completed anti-mine engineering total many Yu 4 million Yuan, by completed of integrated anti-mine engineering many Yu 20 a, each engineering amount not below 150,000 yuan, which at least has two engineering amount not below 500,000 yuan.

    (Iv) assume lightning works shall be subject to design review and acceptance of local meteorological departments;

    (E) obtained grade c qualification for more than a year, annual examination each year.

    Section 11th grade c qualification units in addition to the eighth of the basic conditions, should also comply with the following conditions:

    (A) the registered capital of RMB 500,000 or more; (B) commensurate with the business of lightning protection engineering technicians and associate professionals.

    Achieved certificate of the mine engineering qualifications in professional and technical personnel, more than one with mine-related senior professional titles, three more than mine-related intermediate technical titles.

    Chapter III applications for qualification and acceptance

    12th applicant qualification units, shall provide the registered seat of the provinces, autonomous regions and municipalities directly under the competent meteorological applications; applications b and c class units, shall provide the registered seat of the District of the municipal meteorological authorities to apply.

    Qualification processing times for each September, b and c grade processing times for March and November each year. 13th meet eighth and 11th of the corresponding conditions of these measures, application of lightning protection engineering design or construction qualifications.

    The applicant should submit the following documentation:

    (A) the application;

    (B) qualification of the lightning protection engineering design application form (Schedule 1) or the mine engineering professional construction qualification application form (Schedule 2);

    (C) the business license, tax registration certificate (national tax and land tax) and the corporate organization code certificate and duplicate copies of original and copy;

    (D) of the summary of professional and technical personnel (Schedule 3), made the mine engineering qualification certificate of professional and technical personnel of senior and intermediate technical title certificates, identity documents, employment contracts, social security and mine engineering and the original and photocopy of your certificate of qualification;

    (E) enterprise quality management and mine engineering quality management manuals;

    (Vi) corporate fixed work place original and copy of title deed or lease contract;

    (G) list of instruments, equipment and other related facilities. 14th in line with this approach the eighth and Nineth and tenth for the condition may apply for lightning protection engineering design or construction grade a or grade b qualification.

    Applicant in addition submit written materials of the 13th under these measures, should also submit the following documentation:

    (A) existing copy and duplicate copies of the certificate of qualification;

    (B) the lightning protection project completed form (Schedule 4);

    (C) three or more users from mine engineering certificate;

    (D) two complete lightning protection engineering of complete technical information;

    (E) issued by the competent Meteorological Department had completed mine engineering design review, acceptance and other related information.

    15th meteorological departments should be in receipt of all application materials within five working days of the date, according to the People's Republic of China administrative license law of the 32nd article decide whether to accept.

    Qualification of the fourth chapter review and assessment 16th of provinces, autonomous regions and municipalities directly under the meteorological authorities are responsible for organizations to apply for the qualification of units within their respective administrative areas at first instance; district of the municipal meteorological authorities are responsible for organizations to apply within their respective administrative areas b and c class units in first instance.

    Primary review information provided by the applicant is true and complete, and are consistent with the appropriate qualifications. Of first instance qualified, in the mine engineering design qualification application form or the mine engineering professional construction qualification application form of "trial" units of first instance up to bar and sealed, and within 20 working days from the day of acceptance application form and other filings with the competent Meteorological Department at a higher level.

    Unqualified in the first instance, by a written confirmation issued by the unit in the first instance, and returned to the applicant and state the reasons. 17th qualification by the competent Meteorological Department under the State Council commissioned mine engineering professional qualification Review Committee review, review results are reported to the competent Meteorological Department under the State Council. The competent Meteorological Department under the State Council shall, within 20 working days of receiving the results found.

    Identified by, issued the mine engineering design qualification certificate or professional construction qualification certificate for the project of mine. B and c grade by provinces, autonomous regions and municipalities directly under the meteorological departments commissioned mine engineering professional b and c grade Review Committee review, results of meteorological departments of provinces, autonomous regions and municipalities.

    The provinces, autonomous regions and municipalities directly under the meteorological departments should receive the results within 20 business days after the determination is made, identified by the State Council after the competent meteorological record, lightning protection engineering design and issue the certificate of qualification or professional construction qualification certificate for the project of mine.

    Does not pass found, found within ten working days of the decision issued by identified institutions written rejected applicants, and explain the reasons.

    18th mine engineering professional qualification assessment Board composition is determined by the competent Meteorological Department under the State Council; lightning protection engineering b, c level qualifications assessment committee composed of provinces, autonomous regions and municipalities directly under the Meteorological Authority to determine and report to the competent Meteorological Department under the State Council for the record.

    Lightning protection engineering professional qualification review, the Review Committee, based on the unit of work need to be assigned more staff to apply for on-site verification; review by voting, and the review comments.

    Supervision and administration of the fifth chapter 19th of provinces, autonomous regions and municipalities directly under the meteorological authorities on lightning protection engineering design and construction quality implementation of the inspection system. Inspection does not meet the requirements of rectification. Still does not meet the requirements after rectification, inspection to be ineligible.

    Fail to pass the annual inspection, lower level or cancellation of qualification.

    Did not participate in the annual inspection in the inspection time allotted, whose certifications expire automatically, and a year to reapply for qualification. 20th mine engineering design and construction certificate is valid for three years. Three months before the expiration date, the applicant should apply to the identified bodies continues. Original identified according to inspection records and the qualification requirements, within one month of the expiration to approve the extension, downgrade or cancellation of the decision.

    Late renewal application had been filed, certifications expire automatically, and a year to reapply for qualification.

    21st qualification within the validity of the qualification certificate of name, address, registered capital, the change of the legal representative shall, within 30 business days after the approval of the Administrative Department for industry and commerce, to the recognized agencies qualification certificate change procedures.

    Merger, restructuring, a qualification of the Division as well as industrial and commercial registration across provinces, autonomous regions and municipalities directly under the changes, shall, in accordance with the procedure as provided herein to the seat of the provinces, autonomous regions and municipalities directly under the qualification approved by the competent meteorological applications.

    Enterprise merged of, merged Hou acquired or new established of enterprise can inherited merged Qian parties in the high grade of qualification; Enterprise Division, and restructuring of, Division, and restructuring Hou of enterprise qualification grade according to actual reached of qualification conditions again approved; enterprise across province, and autonomous regions, and municipalities change business registered to of, by original finds institutions agreed Hou, by new registered location of province, and autonomous regions, and municipalities meteorological competent institutions approved qualification. 22nd qualification unit, according to the appropriate level of qualification should be mine engineering design or construction professional.

    Any qualification certificate or exceeds the level of qualification to undertake mine-engineering design and construction, mine engineering subcontracting is prohibited or illegal subcontracting.

    Made the mine engineering qualification of professional and technical personnel, shall simultaneously in two or more qualifications for mine engineering part-time practice.

    23rd qualification units need to undertake the external lightning protection engineering of the administrative areas of provinces, autonomous regions and municipalities, should be to the place of work of meteorological departments of provinces, autonomous regions and municipalities directly under the record, and accept the supervision and management of the local weather authorities.

    24th no unit is allowed to deceive, deception and other means of qualification may not be forged, altered, leased, lent, anchored, transferred to the lightning protection engineering design qualification certificate or the mine engineering professional construction qualification certificate.

    25th the competent Meteorological Department under the State Council are responsible for the provinces, autonomous regions and municipalities directly under the qualification of meteorological departments supervise and inspect the work.

    The provinces, autonomous regions and municipalities directly under the meteorological authorities are responsible for engaging in mine engineering design and construction supervision and inspection, and supervision and inspection on a regular basis and the results recorded, archived, announced to the public.

    Chapter Sixth penalty Section 26th unit to hide relevant facts or providing false information to apply for accreditation, meteorological departments concerned inadmissible or refusing to license, and given a warning.

    Applicants may not apply again for qualification in just one year.

    27th licensed unit by fraud, bribery or other improper means to obtain qualifications, warnings about the meteorological departments in accordance with the permission granted, revoke its certificate, may be fined a maximum of 10,000 yuan and 30,000 yuan; be allowed to allowed to re-apply in three years accreditation constitutes a crime, criminal responsibility shall be investigated according to law.

    28th article violates these rules, any of the following acts, meteorological departments above the county level in accordance with the permission shall be ordered to correct, given a warning and can be fined a maximum of 50,000 yuan and 100,000 Yuan; has illegally obtained, confiscation of illegal income cause damage to others shall bear liability constitutes a crime, criminal responsibility shall be investigated in accordance with law:

    (A) forged, altered, leased, lent, call, transfer of lightning protection engineering design or construction qualification certificate;

    (B) to conceal from the bodies responsible for supervision and inspection of the situation, providing false information or refuse to provide authentic materials reflect its activities;

    (C) has not obtained the certificate or the certificate has expired, to undertake mine engineering;

    (D) beyond the qualification or without a record to take the provinces, autonomous regions and municipalities outside the administrative area of lightning protection engineering;

    (E) the mine engineering qualification units to undertake the project subcontracted or illegal subcontracting;

    (Vi) other illegal activities.

    29th national staff in mine engineering design and construction quality of the determination and administration of dereliction of duty, abuse of authority or engages, shall be given administrative sanctions constitutes a crime, criminal responsibility shall be investigated according to law.

    The seventh chapter by-laws

    30th in all provinces, autonomous regions and municipalities directly under the meteorological departments in accordance with these measures, formulate implementing rules and report to the competent Meteorological Department under the State Council for the record. 31st article this way come into force September 1, 2011.

  

    April 1, 2005, the China Meteorological Administration announced the management measures of lightning protection engineering professional qualification at the same time abolish.

    Attachment: People's Republic of China relevant provisions in the administrative licensing law

    The 32nd Executive to the applicants ' application for administrative license shall be made according to the following circumstances:

    (A) the application does not need an administrative license in accordance with law, shall immediately inform the applicant will not be accepted;

    (B) the application does not belong to the terms of reference of the executive authorities in accordance with law, shall immediately make a decision inadmissible, and inform the applicant to apply to the relevant administrative authorities;

    (C) application errors that can be corrected on the spot, shall permit the applicant to be corrected on the spot;

    (D) the application materials are incomplete or not in compliance with the statutory form, shall, on the spot or within the 5th time inform all applicants need to correct content, fails to inform the, shall be accepted as of the date of receipt of the application materials;

    (V) application belongs to the administrative body terms of reference, application materials are complete and comply with the statutory format, all in accordance with the requirements of the administrative authority or the applicant corrected application, shall accept administrative licensing applications.

    Executive to accept or not to accept an application for administrative license shall issue a dated and stamped with the Special seal of the Executive in written form.

    Schedule: 1. application form for qualifications for design of lightning protection engineering

    2. in the mine engineering professional construction qualification application form

    3. the summary of professional and technical personnel

4. the schedule to the lightning protection project completed table 1: lightning protection engineering design qualification application form
┌─────┬─────────────────────────────┐
│企业名称  │                                                          │
├─────┼────────────┬────┬───────────┤
│法定代表人│                        │经济性质│                      │
├─────┼────────────┼────┼───────────┤
│注册资本  │                        │主管单位│                      │
├─────┼────────────┴────┴───────────┤
│单位地址  │                                                          │
├─────┼─────────┬────┬────┬────┬────┤
Communication address postal code of │ │ contact │ │ │ │ │
├─────┴─────────┴──┬─┴────┴────┴────┤
Lightning protection engineering design qualification │ │ applications │
├──────────────────┼────────────────┤
│ Company engaged in mine engineering design │ │
├──────────────────┴────────────────┤
│                        本企业专业技术人员数量                        │
├──┬───┬────┬────┬──────┬───┬───┬───┤
│ │ │ People senior engineers engineer │ │ │ │ │ technicians people Assistant Engineer/technician │
├──┼───┴────┴────┴──────┴───┴───┴───┤
│ 企 │                                                                │
│ 业 │                                                                │
│ 概 │                                                                │
│ 况 │                                                                │
├──┼────────────────────────────────┤
│    │                                                                │
│    │                                                                │
│    │                                                                │
│初审│                                                                │
│意见│                                                                │
│    │                                                                │
│    │                                                                │
│    │                                                                │
│    │                                              年    月    日    │
├──┼────────────────────────────────┤
│    │                                                                │
│    │                                                                │
│    │                                                                │
│评审│                                                                │
│意见│                                                                │
│    │                                                                │
│    │                                                                │
│    │                                                                │
│    │                                              年    月    日    │
├──┼────────────────────────────────┤
│    │                                                                │
│    │                                                                │
│主管│                                                                │
│部门│                                                                │
│审批│                                                                │
│意见│                                                                │
│    │                                                                │
│    │                                                                │
│    │                                              年    月    日    │

└──┴────────────────────────────────┘

Appendix 2: lightning protection engineering construction certificate application form
┌─────┬─────────────────────────────┐
│企业名称  │                                                          │
├─────┼────────────┬────┬───────────┤
│法定代表人│                        │经济性质│                      │
├─────┼────────────┼────┼───────────┤
│注册资本  │                        │主管单位│                      │
├─────┼────────────┴────┴───────────┤
│单位地址  │                                                          │
├─────┼─────────┬────┬────┬────┬────┤
Communication address postal code of │ │ contact │ │ │ │ │
├─────┴─────────┴──┬─┴────┴────┴────┤
Lightning protection engineering professional construction qualification │ │ applications │
├──────────────────┼────────────────┤
Lightning protection engineering construction time │ │ │
├──────────────────┴────────────────┤ │                        本企业专业技术人员数量                        │
├───┬───┬────┬───┬──────┬───┬───┬───┤
│ │ │ People senior engineers engineer │ │ │ │ │ technicians people Assistant Engineer/technician │
├───┼───┴────┴───┴──────┴───┴───┴───┤
│      │                                                              │
│      │                                                              │
│  企  │                                                              │
│  业  │                                                              │
│  概  │                                                              │
│  况  │                                                              │
│      │                                                              │
│      │                                                              │
│      │                                            年    月    日    │
├───┼───────────────────────────────┤
│      │                                                              │
│      │                                                              │
│      │                                                              │
│ 初审 │                                                              │
│ 意见 │                                                              │
│      │                                                              │
│      │                                                              │
│      │                                                              │
│      │                                            年    月    日    │
├───┼───────────────────────────────┤
│      │                                                              │
│      │                                                              │
│      │                                                              │
│ 评审 │                                                              │
│ 意见 │                                                              │
│      │                                                              │
│      │                                                              │
│      │                                                              │
│      │                                            年    月    日    │
├───┼───────────────────────────────┤
│      │                                                              │
│      │                                                              │
│ 主管 │                                                              │
│ 部门 │                                                              │
│ 审批 │                                                              │
│ 意见 │                                                              │
│      │                                                              │
│      │                                            年    月    日    │

└───┴───────────────────────────────┘

Appendix 3: Professional and technical personnel summary
填报单位(盖章):                                      填报日期:    年    月    日
┌─┬──┬─┬─┬──┬───┬───┬────┬─────┬──────┬──────┐
│ ││││ │ Order │ │ │ years engaged in the lightning protection engineering job │ │ certificate │
Name age │ │ │ │ │ calendar │ professional title │ jobs │ │ │ │ certificate number number (if any) │
│  │    │  │  │    │      │      │        │          │  (如有)  │            │
├─┼──┼─┼─┼──┼───┼───┼────┼─────┼──────┼──────┤
│  │    │  │  │    │      │      │        │          │            │            │
├─┼──┼─┼─┼──┼───┼───┼────┼─────┼──────┼──────┤
│  │    │  │  │    │      │      │        │          │            │            │
├─┼──┼─┼─┼──┼───┼───┼────┼─────┼──────┼──────┤
│  │    │  │  │    │      │      │        │          │            │            │
├─┼──┼─┼─┼──┼───┼───┼────┼─────┼──────┼──────┤
│  │    │  │  │    │      │      │        │          │            │            │
├─┼──┼─┼─┼──┼───┼───┼────┼─────┼──────┼──────┤
│  │    │  │  │    │      │      │        │          │            │            │
├─┼──┼─┼─┼──┼───┼───┼────┼─────┼──────┼──────┤
│  │    │  │  │    │      │      │        │          │            │            │
├─┼──┼─┼─┼──┼───┼───┼────┼─────┼──────┼──────┤
│  │    │  │  │    │      │      │        │          │            │            │
├─┼──┼─┼─┼──┼───┼───┼────┼─────┼──────┼──────┤
│  │    │  │  │    │      │      │        │          │            │            │
├─┼──┼─┼─┼──┼───┼───┼────┼─────┼──────┼──────┤
│  │    │  │  │    │      │      │        │          │            │            │
├─┼──┼─┼─┼──┼───┼───┼────┼─────┼──────┼──────┤
│  │    │  │  │    │      │      │        │          │            │            │
├─┼──┼─┼─┼──┼───┼───┼────┼─────┼──────┼──────┤
│  │    │  │  │    │      │      │        │          │            │            │
├─┼──┼─┼─┼──┼───┼───┼────┼─────┼──────┼──────┤
│  │    │  │  │    │      │      │        │          │            │            │
├─┼──┼─┼─┼──┼───┼───┼────┼─────┼──────┼──────┤
│  │    │  │  │    │      │      │        │          │            │            │
├─┼──┼─┼─┼──┼───┼───┼────┼─────┼──────┼──────┤
│  │    │  │  │    │      │      │        │          │            │            │
├─┼──┼─┼─┼──┼───┼───┼────┼─────┼──────┼──────┤
│  │    │  │  │    │      │      │        │          │            │            │
├─┼──┼─┼─┼──┼───┼───┼────┼─────┼──────┼──────┤
│  │    │  │  │    │      │      │        │          │            │            │

└─┴──┴─┴─┴──┴───┴───┴────┴─────┴──────┴──────┘

Table 4: completed mine project table
Complete units (seal): submission date: year month day
┌─┬────┬────┬────┬────┬────┬─────┬─────┬──┐
│ │ │ Order │ project name actual cost finished │ protection operation │ │ │ design approved acceptance │ comments │
│号│        │        │        │        │        │意见书编号│意见书编号│    │
├─┼────┼────┼────┼────┼────┼─────┼─────┼──┤
│  │        │        │        │        │        │          │          │    │
├─┼────┼────┼────┼────┼────┼─────┼─────┼──┤
│  │        │        │        │        │        │          │          │    │
├─┼────┼────┼────┼────┼────┼─────┼─────┼──┤
│  │        │        │        │        │        │          │          │    │
├─┼────┼────┼────┼────┼────┼─────┼─────┼──┤
│  │        │        │        │        │        │          │          │    │
├─┼────┼────┼────┼────┼────┼─────┼─────┼──┤
│  │        │        │        │        │        │          │          │    │
├─┼────┼────┼────┼────┼────┼─────┼─────┼──┤
│  │        │        │        │        │        │          │          │    │
├─┼────┼────┼────┼────┼────┼─────┼─────┼──┤
│  │        │        │        │        │        │          │          │    │
├─┼────┼────┼────┼────┼────┼─────┼─────┼──┤
│  │        │        │        │        │        │          │          │    │
├─┼────┼────┼────┼────┼────┼─────┼─────┼──┤
│  │        │        │        │        │        │          │          │    │
├─┼────┼────┼────┼────┼────┼─────┼─────┼──┤
│  │        │        │        │        │        │          │          │    │
├─┼────┼────┼────┼────┼────┼─────┼─────┼──┤
│  │        │        │        │        │        │          │          │    │
├─┼────┼────┼────┼────┼────┼─────┼─────┼──┤
│  │        │        │        │        │        │          │          │    │
├─┼────┼────┼────┼────┼────┼─────┼─────┼──┤
│  │        │        │        │        │        │          │          │    │
├─┼────┼────┼────┼────┼────┼─────┼─────┼──┤
│  │        │        │        │        │        │          │          │    │
├─┼────┼────┼────┼────┼────┼─────┼─────┼──┤
│  │        │        │        │        │        │          │          │    │
    └─┴────┴────┴────┴────┴────┴─────┴─────┴──┘ Note: Please click here to fill in the table of lightning projects actually completed in the last three years.