The Ministry of public security on amending the provisions on fire supervision and management of construction projects of decision

    (Published July 17, 2012 the Ministry of public security, the 119th since November 1, 2012) to further strengthen fire supervision and management of the construction project, the Ministry of public security decided to fire supervision and management of construction engineering regulations read as follows:

One, in the second paragraph of "interior decoration, use change" amended to read "with indoor and outdoor decoration, building insulation, use change."

    The second paragraph in the "other temporary buildings" is amended as "other non-densely populated places of temporary buildings."

Second, the article is changed to: "construction, design, construction, project supervision unit shall comply with fire regulations, regulations on construction project quality administration and national fire protection technical standards, construction design, construction quality and safety. "Public security fire control institutions to implement the construction project design review, fire inspection and record keeping, spot checks, and to fire construction supervision.

    ”

    In the third, the seventh "two" amended to read "two".

    In section four, the eighth "final acceptance of filing" is amended as "complete fire record." Five, the 12th article is revised as follows: "the Community fire protection technical services shall be established by law, community fire protection technical service work should be carried out according to law. Fire protection design and acceptance to provide drawings for construction engineering reviews, safety assessment, detection, and fire service agencies and personnel, shall obtain a relevant qualification, qualification, in accordance with the laws and administrative regulations, national standards, industry standards and practice guidelines provide technical service and issued by the responsible for the review, assessment, inspection and testing of.

    ”

Six, the 14th article is revised as follows: "this article, except as provided in the second building area more than 40,000 square meters or height more than 50 meters of public buildings."

    An additional, fourth category: "national standards for a kind of high-rise residential buildings". VII, by deleting article 15th item, and add a, as a fifth category: "other materials stipulated by laws and administrative regulations.

” Addition of a paragraph, as the second paragraph: "need to get a planning permit of construction engineering according to law, shall provide the planning permit of construction engineering documents; the law needs approval of the urban and Rural Planning Department of temporary buildings, belonging to the densely populated places, urban and rural planning should provide evidence of the approval of the competent authorities.

    ”

    In article eight, the 16th "special fire-fighting design of technical solutions and description" is amended as "special design documents." Article nine, the 18th is amended as: "public security fire control institutions shall, in accordance with fire regulations and national construction fire protection design of the fire protection technical standards declarations file for review.

To comply with the following conditions, public security fire control institutions shall provide fire protection design examination of views does not meet the requirements, shall issue a design approval unqualified opinion, and explain the reasons:

"(A) the design unit with the corresponding qualifications;

"(Ii) fire-fighting design documents meet the requirements of the Ministry of public security fire-fighting design document reporting requirements;

"(C) the General layout of the building and floor, fire resistance rating, building construction, evacuation, fire-fighting water supply, fire power and power distribution, fire-fighting equipment such as fire engineering building fire protection technology designed to meet national standards; "(D) the selection of fire protection products and building materials with fire performance requirements which comply with fire engineering construction technology standard and the relevant regulations.

    ”

Ten, the 19th article of the "fire technology program" is amended as "special design documents." The fourth paragraph as follows: "special fire on two-thirds the above reviewer agreed design document, can be used as fire protection design approval basis.

    ”

Under article XI of the 21st is revised as follows: "applying for fire Inspection Unit shall provide the following materials:

"(A) the application form for inspection of construction engineering;

"(B) the project completion report and project completion drawings related to fire fighting facilities;

"(C) fire safety product quality certificate;

"(D) the fire performance requirements for building components, building materials, decoration materials conform to national or industry-standard certificates, factory certificate;

"(V) fire safety facilities inspection certificate;

"(Vi) construction, project supervision, inspection unit the legal status and qualification supporting documents;

"(G) the business license of the employer, such as legal proof of identity; "(VIII) other materials stipulated by laws and administrative regulations.

    ”

    12, by deleting article 24th. 13, and will 25th article to 24th article, modified for: "on this provides 13th article, and 14th article provides yiwai of construction engineering, units should in made construction license, and engineering completed acceptance qualified of day up 7th within, through provincial police organ fire institutions website for fire design, and completed acceptance fire record, or to police organ fire institutions business accepted places for fire design, and completed acceptance fire record.



Added two paragraphs, as the second and third paragraphs: "Construction in fire safety design for construction or completion a fire record, should register at public security fire control institutions to declare, respectively table, 15th article in the present provisions of the relevant material and construction license copies of documents, or related materials provided in this article 21st.

According to housing and urban-rural construction Administrative Department documentation review of the relevant provisions, should also provide copies of construction drawing examination of documents issued by the review bodies. "The law does not require obtaining construction permits construction projects, fire protection design, acceptance may not fire for the record.

    ”

14, merging the 26th, 27th, 28th, 25th and amended as: "public security fire control institutions received fire design, acceptance of fire for the record after the Declaration, filing materials, shall issue a registration certificate; the archival materials are incomplete or not in compliance with the statutory form, shall, on the spot or within the 5th told to correct everything at once. "Public security fire control institutions shall have the record of fire protection design, acceptance of projects, identify targets at random and announced to the public. Identified as targets, public security fire control institutions shall, within 20th in accordance with fire regulations and the State technical standard of engineering construction drawings to check, or in accordance with the standard for inspection and assessment of construction engineering completion check, making checking records.

Inspection results should be announced to the public, failed to pass the examination, shall notify the owner in writing. "Unit after receiving the notice, should be stopped or to stop the construction, organization after rectification to the public security fire control institutions for review.

Public security fire control institutions shall in the 20th days of receiving a written request for review and issue a written review comments. "Construction and design, construction units are not allowed to modify the record construction design in accordance with law. Necessitates modification, fire control design of construction should again report record.

    ” XV, and will 29th article to 26th article, modified for: "construction engineering of fire design, and completed acceptance not law reported police organ fire institutions record of, police organ fire institutions should law punishment, ordered units in 5th within record, and determine for check object; on late not record of, police organ fire institutions should in record term expires of day up 5th within notification units stop construction or stop using.

    ” Under article 16, the 32nd to 29th and amended as: "the fire of construction engineering design and fire record of acceptance sampling by provincial-level public security fire control institutions in the combined area construction drawing review bodies review quality, fire protection design and construction quality determined and announced to the public.

Operating personnel-intensive site inspection of the construction project should not be less than 50%. "Public security fire control institutions and their staff shall, in accordance with the provisions of construction fire protection design and acceptance the implementation record checks, are not allowed to determine targets.

    ”

17, the 47th to the 44th article first is revised as follows: "do not meet the statutory conditions of building fire protection design examination certificate, acceptance or by fire design and complete fire record checks".

    The second amendment: "meets the statutory conditions of the fire protection design of construction projects, fire inspection application fire protection design and acceptance record, check or inadmissible, approval, acceptance or delay in processing". 18, the addition of an article, as the 45th: "these provisions contained in building materials building insulation material.

    ” Article 19, the 48th to 46th and amended as: "national fire protection technical standard of engineering construction compulsory requirements, refer to the national fire protection technical standard of engineering construction compulsory article.

    ” Under article 20, the 49th to 47th and amended as: "in these provisions, the ' day ' refers to working days, excluding holidays.

    ” Under article 21, the 50th to 48th, amended to read: "model of legal instruments needed to carry out the provisions, formulated by the Ministry of public security.

    ”

    Under article 22, the eighth and Nineth, tenth, 11th in the "indoor decoration materials" is amended as "materials".

    Under article 23, the Nineth and tenth and 11th in the "fire performance requirements" is amended as "fire performance requirements."

24, the fire supervision and management of construction engineering provides serial numbers in accordance with the relevant provisions of this decision and be adjusted accordingly.

This decision shall take effect on November 1, 2012.

    The fire supervision management of construction engineering regulations be revised according to this decision, republished.

    Report: fire supervision and management of construction engineering 2012 (revised) (April 30, 2009 the Ministry of public security, the 106th released July 17, 2012, the Ministry of public security to 119th published since November 1, 2012, the Ministry of public security on modifications of fire supervision and management of construction engineering decision amendments to provisions)

    Directory

Chapter I General provisions

Chapter II fire protection design and construction of quality responsibility

Chapter III fire protection design approval and fire control acceptance

The fourth chapter record check of fire protection design and acceptance of

The fifth chapter law enforcement and supervision

The sixth chapter legal liability

    The seventh chapter by-laws
Chapter I General provisions

    First in order to strengthen fire supervision and management of construction projects, and implementation of building fire protection design and construction engineering quality and safety responsibilities, standardize fire supervision and management, according to the People's Republic of China Law on fire, the construction engineering quality management regulation, this provision is enacted.

Provisions of this article apply to new construction, expansion, renovation (including indoor and outdoor decoration, building insulation, use change), fire supervision and management of the construction project.

    Residential interior decoration, this provision does not apply the villagers build their own homes, disaster relief and other non-temporary buildings-building activities in densely populated places.

Article building, designing, construction, construction supervision and other units shall comply with fire regulations, regulations on construction project quality administration and national fire protection technical standards, construction design, construction quality and safety.

    Public security fire control institutions to implement the construction project design review, fire inspection and record keeping, spot checks, and to fire construction supervision. Article fourth among public security fire control institutions of people's Governments of provinces, autonomous regions, and local people's Governments at or above the county level public security fire control institutions area fire protection design of the construction project auditing, inspection and record checks work.

Division of labour is determined by provincial-level public security fire control institutions, and reported to the Ministry of public security fire Bureau.

    Fire safety design for construction of the trans-audit, inspection and record checks, by the common level of public security fire control institutions to exercise jurisdiction.

    Fifth public security fire control institutions to implement fire supervision and management of construction projects shall follow the principles of Justice, strict, civilized and efficient.

Construction of the sixth fire design and construction must comply with national fire protection technical standard of engineering construction.  

    New national construction before the implementation of technical standards on fire, fire protection design of the construction project has been public security fire control institutions examination or filing, respectively, according to the original review comments or filing standards.

    Article seventh public security fire control institutions for fire protection design of construction project auditing, inspection and record checks, should be implemented by two or more law enforcement officers.

    Chapter II fire protection design and construction of quality responsibility

Eighth construction units shall not be required to design, construction, supervision and other relevant entities and persons violating the fire code and the national construction fire protection technical standard, lower the quality of building fire protection design and construction engineering, and fire protection design and construction quality of the following responsibilities:

(A) shall apply to fire control design of construction project auditing, inspection, fire protection design and acceptance of fire according to formalities and accepting checks; construction set in public gathering places without fire safety checks or not complying with the safety requirements by the inspection shall not be put into use, business;

(B) the implementation of project supervision of construction projects, fire should be together construction quality supervision;

(C) selected for their qualifications prescribed by the State unit of fire protection design and construction;

(D) the selection of qualified fire protection products and meet the requirements of fire resistance of building elements and building materials and decoration materials;

    (E) according to law shall be subject to design review, inspection of construction works, unaudited or audited is not qualified, may organize construction, unqualified acceptance or acceptance shall not be delivered.

Nineth quality responsibility of the fire control design of design unit shall bear the following:

(A) according to the fire code and the national fire protection technical standards for fire protection design of engineering construction, prepared to meet the requirements of fire safety design document, must not violate the requirements of the national fire protection technical standard of engineering construction compulsory for design;

(B) used in the design of fire protection products and fire-proof performance of building elements and building materials, decoration materials, specification, performance specifications to be indicated, the quality requirements must conform to the State standards or industrial standards;

    (C) participation in employer organizations of construction engineering completion approval, implementation of the fire protection design of construction projects to sign it.

Tenth construction unit shall bear the following fire of construction quality and safety responsibilities:

(A) in accordance with the national construction technical standards on fire and fire protection design examination or for the record fire construction design documents, without changing the fire-fighting design for construction, reduce the construction quality of fire;

(B) the inspection of fire protection products and fire-proof performance of building components, the quality of building materials and decoration materials, qualified products to ensure construction quality of fire; (C) establish a construction site fire safety responsibility system and determining fire safety Director. Strengthen fire education and training to construction personnel, implementation of fire, electricity, flammable combustible materials such as fire management policies and procedures.

    Ensure the construction before the final acceptance of fire exits, fire water, fire service installations and equipment, fire safety signs in good working condition.

11th the construction supervising units shall undertake the following responsibilities of construction quality supervision of fire services:

(A) in accordance with the national construction technical standards for fire and fire protection design examination or filing of design files implemented project management

(B) the performance requirements of fire protection products and fire-proof building, building materials, decoration materials, construction, installation, verify product quality certificate, must not agree to use or install fire and fire performance does not meet the requirements of the building, building materials, decoration materials;

    (C) participation in employer organizations of construction engineering completion approval, construction engineering construction quality sign of fire. 12th community fire protection technical service shall be established by law, community fire protection technical service work should be carried out according to law.

    Fire protection design and acceptance to provide drawings for construction engineering reviews, safety assessment, detection, and fire service agencies and personnel, shall obtain a relevant qualification, qualification, in accordance with the laws and administrative regulations, national standards, industry standards and practice guidelines provide technical service and issued by the responsible for the review, assessment, inspection and testing of.

    Chapter III fire protection design approval and fire control acceptance

13th on crowded places that have any of the following circumstances, the construction unit shall apply to the public security fire control institutions fire protection design examination, and after the completion of the construction project to the fire protection design examination opinions issued by public security fire control institutions to apply for inspection:

(A) building stadiums, halls of the total area of more than 20,000 square meters, public exhibition, the exhibition hall of the Museum;

(B) the total construction area of over 15,000 square metres of civil airport terminal passenger waiting room of the station, ferry terminal, and houchuanting;

(C) the total area more than 10,000 square meters of hotels, restaurants, shopping malls, markets;

(D) more than 2,500 square meters of total area theaters, public library reading room, commercial indoor Fitness, leisure complex, hospital outpatient service building, University teaching building, library, canteen, labour-intensive production and processing workshop, temples, churches;

(E) the total building area of more than 1000 square meters room for children in nurseries, kindergartens, children's Arcade, indoor children activities, homes for the aged, welfare institutions, ward of the hospital, nursing homes, primary and middle school teaching building, library, cafeteria, school dormitories, labor-intensive enterprises employee dormitories;

    (F) buildings with a total area larger than 500 square meters of dance halls, video halls, theaters, karaoke bars, nightclubs, recreation Hall, sauna, an Internet point, a bar, restaurants, teahouses, coffee shops with entertainment features.

Article 14th on special projects that have any of the following circumstances, the construction unit shall apply to the public security fire control institutions fire protection design examination, and after the completion of the construction project to the fire protection design examination opinions issued by public security fire control institutions to apply for inspection:

(A) the features listed in this article 13th crowded places of construction works;

(B) the State Office building, electric operation, telecommunications building, post office building, disaster command and control buildings, radio and television building, file building;

(C) of this article, except as provided in the second building area more than 40,000 square meters or height more than 50 meters of public buildings;

(D) national standard of a high-rise residential building;

(E) urban rail transportation, tunnels, large power plants, power transformation and distribution engineering;

    (F) the production, storage, loading and unloading of inflammable and explosive dangerous goods factories, warehouses and private stations, terminals, inflammable gas and liquid filling station, station, pressure regulating station.

15th construction application fire protection design approval shall provide the following documents:

(A) the fire control design of construction project auditing returns;

(B) the construction unit of the business license and other legal proof of identity;

(C) the design qualification certificate;

(D) the design documents;

(V) other materials stipulated by laws and administrative regulations.

    Need to get a planning permit of construction engineering according to law, shall provide the planning permit of construction engineering documents; the law needs approval of the urban and Rural Planning Department of temporary buildings, belonging to the densely populated places, urban and rural planning should provide evidence of the approval of the competent authorities.

Article 16th has any of the following circumstances, 15th construction unit in addition to the provisions listed in section materials, should also provide special design files, or designed using international standards, technical standards on fire outside the Chinese texts, as well as other related fire protection design of application examples, product descriptions, technical information, such as:

(A) fire protection technical standard of engineering construction does not require the;

(B) fire-fighting design document proposes to adopt new technology, new processes and new materials may affect the fire safety of construction projects, does not meet the requirements of the national standard;

    (C) intends to adopt international standards or technical standards on fire outside. 17th public security fire control institutions shall from the date of accepting an application for fire-fighting design in the 20th issue a written opinion.

    Pursuant to these provisions required the Organization of expert reviews, expert review time does not count in the review period. 18th public security fire control institutions shall, in accordance with fire regulations and national construction fire protection design of the fire protection technical standards declarations file for review.

To comply with the following conditions, public security fire control institutions shall provide fire protection design examination of views does not meet the requirements, shall issue a design approval unqualified opinion, and explain the reasons:

(A) the design unit with the corresponding qualifications;
(B) fire-fighting design documents meet the requirements of the Ministry of public security fire-fighting design document reporting requirements;

(C) the General layout of the building and floor, fire resistance rating, building construction, evacuation, fire-fighting water supply, fire power and power distribution, fire-fighting equipment such as fire engineering building fire protection technology designed to meet national standards;

    (D) selection of fire protection products and building materials with fire performance requirements which comply with fire engineering construction technology standard and the relevant regulations.

Article 19th of the 16th provided one of the construction projects, public security fire control institutions shall accept an application for fire design review within 5th of application materials submitted to the provincial people's Government public security fire control institutions specialists in the field. Provincial public security fire control institutions shall in the 30th from the date of receipt of the application materials in conjunction with the housing and urban-rural construction Administrative Department to convene expert, the units ' special fire-fighting design documents submitted are reviewed. Experts participating in the review should have senior professional titles, should not be less than the total of seven people, and shall provide expert review comments.

Experts have different views on which shall be indicated.

The provincial public security fire control institutions shall 5th expert after expert review opinions written notice to submit application materials for public security fire control institutions, and shall file with the Ministry of public security.

    Special fire-fighting design for two-thirds the above reviewer agreed with documents as a basis for design review. Article 20th building, designing, construction may be supplemented, modified by public security fire control institutions audited qualified fire protection design of construction projects.

    Necessitates modification, the construction unit shall provide fire protection design examination opinions issued by public security fire control institutions reapply for fire protection design of audit.

21st construction inspection the applicant shall provide the following materials:

(A) the application form for inspection of construction engineering;

(B) the project completion report and project completion drawings related to fire fighting facilities;

(C) fire safety product quality certificate;

(D) the fire performance requirements for building components, building materials, decoration materials conform to national or industry-standard certificates, factory certificate;

(E) fire-fighting equipment test certificate;

(Vi) construction, project supervision, inspection unit the legal status and qualification supporting documents;

(G) the business license of the employer, such as legal proof of identity;

    (VIII) other materials stipulated by laws and administrative regulations.

    22nd public security fire control institutions shall accept an application for inspection within 20th day of organized fire inspection and issue a fire inspection.

23rd public security fire control institutions to declare the fire inspection of the construction should be in accordance with the standard for fire inspection and assessment of building engineering fire protection design examination organization has fire inspection.

    On comprehensive assessment conclusions for eligible projects, public security fire control institutions shall provide fire control acceptance comment; the conclusion of comprehensive assessment to be ineligible shall issue a fire inspection unqualified opinion, and explain the reasons.

    The fourth chapter record check of fire protection design and acceptance of

Article 24th of this article 13th, 14th construction projects other than those stipulated, the construction unit shall in obtaining construction licenses, completion date of acceptance in the 7th, by public security fire control institutions at the provincial level website design and complete fire record, or to the place of public security fire control institutions to accept fire design and complete fire record. Fire safety design for construction company in construction or completion a fire record, should register at public security fire control institutions to declare, respectively table, 15th article in the present provisions of the relevant material and construction license copies of documents, or related materials provided in this article 21st.

According to housing and urban-rural construction Administrative Department documentation review of the relevant provisions, should also provide copies of construction drawing examination of documents issued by the review bodies.

    Does not need to obtain construction permits construction projects according to law, can not fire design, acceptance of fire records.

25th received public security fire control institutions fire protection design, acceptance of the fire for the record after the Declaration, filing materials, shall issue a registration certificate; the archival materials are incomplete or not in compliance with the statutory form, shall, on the spot or within the 5th told to correct everything at once. Public security fire control institutions shall have the record of fire protection design, acceptance of projects, identify targets at random and announced to the public. Identified as targets, public security fire control institutions shall, within 20th in accordance with fire regulations and the State technical standard of engineering construction drawings to check, or in accordance with the standard for inspection and assessment of construction engineering completion check, making checking records.

Inspection results should be announced to the public, failed to pass the examination, shall notify the owner in writing. Construction unit after the notification is received, should be stopped or to stop the construction, organization after rectification to the public security fire control institutions for review.

Public security fire control institutions shall in the 20th days of receiving a written request for review and issue a written review comments. Construction, design, construction units are not allowed to modify the record construction design in accordance with law.

    Necessitates modification, fire control design of construction should again report record.

    Construction of the 26th fire design, acceptance of failing to report record of public security fire control institutions, public security fire control institutions shall be punished according to law, and ordered the construction unit in the 5th record, and determined to be the subject; for those who do not record, public security fire control institutions shall record the expiry date of notification within the 5th unit stop working or stop using it.

    The fifth chapter law enforcement and supervision

    27th superior public security fire control institutions at lower levels of public security fire control institutions fire supervision and management of construction engineering supervision, inspection and guidance.

28th public security fire control institutions go through the fire of construction engineering design reviews, fire inspection, exercise primary responsibility the contractor, technology review, examine the separation and mass triage system.

    Fire control design of public security fire control institutions to implement audit and fire inspection of the primary responsibility undertaker, technology review and administrative examination and approval shall be in accordance with the duties of fire is responsible for the quality of law enforcement. Article 29th fire of construction engineering design and fire record of acceptance sampling by provincial-level public security fire control institutions in the combined area construction drawing review bodies review quality, fire protection design and construction quality determined and announced to the public.

Operating personnel-intensive site inspection of the construction project should not be less than 50%.

    Public security fire control institutions and their staff shall, in accordance with the provisions of construction fire protection design and acceptance the implementation record checks are not allowed to determine targets.

    Article 30th fire design review, fire inspection, record checks of public security fire control institutions staff are applicants, close relatives of the interested person or the applicant, interested parties have other relationships may affect to be fair, should be avoided.

    31st a public security fire control institutions receiving citizens, legal persons and other organizations relating to construction project violates fire laws and regulations and national fire protection technical standard of engineering construction report should be organized within the 3rd person verification, verification shall timely inform the informers.

    Article 32nd public security fire control institutions when implementing the fire supervision and management of construction projects shall be placed on the fire technical service agencies, fire protection products setting laws and regulations other than the regional conditions of access. Article 33rd public security fire control institutions and their staff shall not be designated or disguised form of specifying construction design, construction, project supervision and fire technical service providers. Not specify a unit of fire protection products and the brands, sales of building materials.

    Shall not participate in or interfere with construction fire-fighting equipment construction, fire protection products and building materials procurement bidding activity.

    34th fire control design of public security fire control institutions to implement audit, inspection and record keeping, spot checks shall not charge any fee.

35th public security fire control institutions to implement fire supervision and management of construction engineering basis, scope, conditions, procedures, deadlines and the need to submit all materials catalog and application demonstration text should be in public Internet sites, reception sites, Office space.

    Fire-fighting design review, fire inspection and record inspection results, apart from other than State secrets, business secrets and personal privacy, should be made public, the public right of access.

Fire protection design examination of 36th, fire control acceptance of any of the following circumstances, permits issued by public security fire control institutions or by a superior public security fire control institutions, according to the request of the interested party or ex officio, and can be legally revoked:

(A) is not eligible or not in compliance with the statutory requirements of the applicant;

(B) the units obtained by fraud, bribery or other improper means;

(C) public security fire control institutions exceeded the legal responsibilities and authorities;

(D) violation of legal procedures by public security fire control institutions;

(E) public security fire control institutions of personnel who abuse their powers, neglect their duties.

    Fire protection design examination in accordance with the provisions of the preceding paragraph revoked, fire control acceptance, may cause significant harm to the public interest, it shall not be annulled.

    37th citizens, legal persons and other organizations on fire supervision and management of construction engineering public security fire control institutions in the specific administrative acts, may apply to the public security organs of the people's Governments at the corresponding level of administrative review.

    The sixth chapter legal liability

38th violate the provisions of this article, in accordance with the People's Republic of China Law on fire article 58th, 59th, 65th, 66th, 69th in the second paragraph provides for penalties to constitute a crime, criminal responsibility shall be investigated according to law.

    Construction, engineering, design, construction supervision, technical services agencies and their employees violate the fire code, national fire protection technical standard of engineering construction, resulting in harmful consequences, apart from the administrative penalties or criminal responsibility shall be investigated according to law, and shall bear civil liability.

    39th employer when applying for the fire control design of audit, inspection, provides false materials, public security fire control institutions shall not accept or grant permission, and warning.
40th in violation of this provision and corrected, causing no harm, be given a lighter or mitigated punishment or be exempted from punishment.

    41st according to law should be audited by public security fire control institutions in the design of the fire control design of construction project auditing and inspection, unauthorized use and punishment respectively, concurrently.

42nd under any of the following circumstances, it shall be given a heavier punishment:

(A) has passed the fire design review, without changing the design to reduce fire safety standards;

(B) the project is not in accordance with law, for the record, and does not meet the requirements of national fire protection technical standard of engineering construction compulsory;

(C) record by the ordered fails to record;

    (D) project supervision and construction units or units in collusion, fraud, reduce the construction quality of fire.

43rd under any of the following circumstances, public security fire control institutions shall inform at the Department of housing and urban-rural construction administration:

(A) construction projects by public security fire control institutions shall be ordered to stop construction, stop usage;

(B) fire protection design and acceptance check of construction projects are not eligible;

    (C) other writing. 44th public security fire control institutions personnel of dereliction of duty, abuse of power, favoritism and constitutes a crime, criminal responsibility shall be investigated according to law.

Any of the following acts, does not constitute a crime, and disciplined in accordance with the relevant provisions of:

(A) does not meet the statutory conditions of building fire protection design examination certificate, acceptance or by fire design, complete fire record checks;

(B) to comply with the statutory conditions of fire control design of construction projects, fire inspection application fire protection design and acceptance record, check or inadmissible, approval, acceptance or delay in processing;

(C) specified or specified in a disguised form of design, construction units and project supervisory units;

(D) designated or specified in a disguised form of fire protection products brand, sales or technical services, fire-fighting facilities construction;

    (E) use their posts to receive units or personal belongings.

    The seventh chapter by-laws

    45th article of the provisions contained in building materials building materials.

    46th national fire protection technical standard of engineering construction compulsory requirements, refer to the national fire protection technical standard of engineering construction compulsory article.

    47th article of the provisions in the "day" refers to working days, excluding holidays.

    48th legal instruments needed for the implementation of the provisions of article style, developed by the Ministry of public security. 49th article of the regulations come into force on May 1, 2009. Released on October 16, 1996, the building fire protection management regulations on supervisions and verification (the Ministry of public security, 30th) repealed simultaneously.