Housing and municipal infrastructure engineering, construction drawing design document review management practices

    (Released April 27, 2013, Ministry of housing and urban-rural development to 13th since August 1, 2013) first in order to strengthen the housing construction engineering, construction drawing design document review of municipal infrastructure project management, improving the quality of engineering investigation and design under the construction engineering quality management regulation and the regulations on the management of survey and design of construction projects, such as administrative regulations, these measures are formulated.

    Article in the People's Republic of China engaged in housing construction, municipal infrastructure engineering, construction drawing design document to review and implement supervision and administration shall abide by these measures.

    Third State of construction drawing design documents (including surveying documents, hereinafter referred to as working drawings) censorship. Review of construction drawings in these measures refers to construction drawings review bodies (hereinafter referred to as review bodies) in accordance with the relevant laws and regulations, construction plans relate to public interest, public safety and engineering construction compulsory standard review of the content.

    Construction drawing review should stick to survey and design principles. Construction plans without examination, shall not be used.

    Engaged in housing construction projects, urban infrastructure construction, supervision and other activities, as well as the implementation of housing and municipal infrastructure engineering quality and safety supervision and management, should be based on the examination of construction drawing.

    Fourth housing and urban-rural construction departments under the State Council are responsible for the country's construction drawing review implementation guidance and supervision.

    Local people's Governments at or above the county level within the Department of housing and urban-rural construction is responsible for the administrative implementation supervision and management review of construction drawings. Article fifth province, autonomous region or municipality Department of housing and urban-rural construction should be in accordance with the conditions of censorship as provided herein, this scale within the administrative area, to determine the appropriate number of review bodies.

    Specific measures by the Department of housing and urban-rural construction by the State Council separately.

    Review agencies to review is specialized in the construction business, not for profit independent legal entities.

    The provinces, autonomous regions and municipalities directory of Department of housing and urban-rural construction review bodies should be submitted to the State Council departments of housing and urban-rural construction, and to the public.

    Sixth Review by business area divided into two categories, which undertake building, municipal infrastructure engineering, construction drawing review unrestricted scope of business; two types of institutions can undertake medium and the housing construction, municipal infrastructure engineering, construction drawing review.

    The scale of housing construction, municipal infrastructure projects Division, in accordance with the relevant provisions of the housing and urban-rural construction departments under the State Council.

    Seventh class of censors shall meet the following conditions:

    (A) has a sound technical management and quality assurance system. (Ii) review personnel should has good of ethics; has 15 years above by needed professional survey, and design work experience; presided over had many Yu 5 items large housing building engineering, and municipal based facilities engineering corresponding professional of design or class a engineering survey project corresponding professional of survey; has implemented practice industry registered system of professional, review personnel should has a level registered architects, and level registered structure engineers or survey design registered engineers qualification, and in this review institutions registered; not implemented practice industry registered system of professional,

    Reviewers should have senior engineer; within the last 5 years was not for violation of construction laws and regulations and mandatory standards subject to administrative penalties.

    (Three) in this review institutions full-time work of review personnel number: engaged in housing construction construction figure review of, structure professional review personnel not less than 7 people, building professional many Yu 3 people, electrical, and warm pass, and to drainage, and survey, professional review personnel the not less than 2 people; engaged in municipal based facilities engineering construction figure review of, by needed professional of review personnel not less than 7 people, other must supporting of professional review personnel the not less than 2 people; specifically engaged in survey file review of, survey professional review personnel not less than 7 people.

    Take on Super high-rise building construction drawing review, and should also have hosted super high-rise building project or 100 meters or above building structure design of Examiners of not less than 3 persons.

    (D) over the age of 60 inspectors 1/2 of not exceeding the professional review of staffing requirements.

    (E) the registered capital of no less than 3 million Yuan.

    Eighth section II review body shall meet the following conditions:

    (A) has a sound technical management and quality assurance system. (Ii) review personnel should has good of ethics; has 10 years above by needed professional survey, and design work experience; presided over had many Yu 5 items medium above housing building engineering, and municipal based facilities engineering corresponding professional of design or serie b above engineering survey project corresponding professional of survey; has implemented practice industry registered system of professional, review personnel should has a level registered architects, and level registered structure engineers or survey design registered engineers qualification, and in this review institutions registered; not implemented practice industry registered system of professional

    And reviewers should have senior engineer; within the last 5 years was not for violation of construction laws and regulations and mandatory standards subject to administrative penalties.

    (Three) in this review institutions full-time work of review personnel number: engaged in housing construction construction figure review of, structure professional review personnel not less than 3 people, building, and electrical, and warm pass, and to drainage, and survey, professional review personnel the not less than 2 people; engaged in municipal based facilities engineering construction figure review of, by needed professional of review personnel not less than 4 people, other must supporting of professional review personnel the not less than 2 people; specifically engaged in survey file review of, survey professional review personnel not less than 4 people.

    (D) over the age of 60 inspectors 1/2 of not exceeding the professional review of staffing requirements.

    (E) not less than 1 million RMB registered capital. Nineth unit construction plans should be sent for review bodies review, the review body shall not review the project owner, survey and design Enterprise Association or other interested parties.

    Approval management approach by the provinces, autonomous regions and municipalities directly under the people's Government Department of housing and urban-rural construction "open, fair and just" principles.

    Construction units shall not express or implied censorship in violation of the law and regulations and construction engineering construction compulsory standard review, no compression and reasonable review period, down a reasonable review of cost.

    Article tenth the construction unit shall provide the following information to the review bodies and the responsible for the authenticity of the information provided by:

    (A) as a basis for investigation, design approval documents and annexes of the relevant government departments;

    (B) a full set of working drawings;

    (Iii) other materials shall be submitted.

    11th review bodies, construction drawing review should be the following:

    (A) compliance with the engineering construction compulsory standard;

    (B) the Foundation and the main structure of the security;

    (C) compliance with the civil construction energy saving at the mandatory criteria, projects for implementing green building standards, and should also review compliance with green building standards;

    (D) register to practise in investigation and design enterprises and personnel, as well as related personnel in accordance with the regulations on the construction drawings stamped with the appropriate stamp and signature;

    (E) laws, regulations, rules and regulations must be reviewed by others.

    12th construction drawing review in principle no more than the following time limits:

    (A) the large housing construction projects, urban infrastructure project for 15 working days, medium and housing construction, municipal infrastructure projects for 10 working days.

    (B) engineering investigations files, class-a project for 7 working days, grade b and the following projects for 5 business days.

    Above time limit does not include construction time and review bodies review time.

    Article 13th review authority to review construction drawings shall be made according to the following circumstances: (A) the examination, examination books issued by the review body shall be filed with the employer, and stamped on the complete set construction drawing review seal. Review of book review should have professional staff eligible for signing, signed by the legal representative and stamped with the seal of the review bodies.

    Review body should be issued within 5 working days after the examination, review of project local people's Governments at and above the County departments of housing and urban-rural construction. (B) failed to pass the review, construction units and back should be issued by the review bodies review the advice document, note the unqualified reason.

    Meanwhile, should review notification and review employer, found in investigation and design enterprises and registered personnel in violation of the law, regulation and engineering construction compulsory standard questions, projects local people's Governments at and above the County Department of housing and urban-rural construction.

    After drawing back the construction unit, the construction unit shall require the Modify survey and design enterprise, and the revised construction plans to the original review body review.

    14th no units or individuals are not allowed to modify the examination of construction drawing; you want to change, all the way to 11th article content, the construction unit shall review revised construction plans to the original review bodies.

    15th reconnaissance and design enterprises shall survey and design of construction projects, strictly enforce the engineering construction compulsory standard, and be responsible for the quality of survey and design of construction projects. Review agencies responsible for construction drawing review, and review responsibilities.

    After examination, the construction plans, there are still violations of law, regulation and engineering construction compulsory standard issue, causes losses to the construction unit, review bodies shall bear corresponding liability for compensation. 16th review body shall establish and perfect internal control system. Review of construction drawings shall be signed by professional inspectors review records.

    Review of records, examination books, review the advice document and other relevant information should be on file.

    Article 17th has been implementing certified systems Professional, reviewers should be required to participate in continuing education for certified.

    Without a system of registration to use the practice of professional review staff should participate in the provinces, autonomous regions and municipalities of the departments of housing and urban-rural construction-related laws, regulations and technical standards for training, annual training period of not less than 40 hours.
The construction drawings of the 18th article according to regulations should be reviewed, without examination, shall be granted by the competent Department of housing and urban-rural construction construction permits.

    Article 19th competent Department of housing and urban-rural construction of the people's Governments above the county level shall strengthen the supervision and inspection of review bodies, check the following:

    (A) it meets the required conditions;

    (B) is out of range in construction drawing review;

    (C) it is used does not meet the criteria of review officers;

    (D) whether the requirement to review the content;

    (E) whether the requirement to report violations found during the review;

    (F) whether the requirement to fill in the review notice;

    (VII) whether the requirement in the examination book and signed and sealed on the construction drawings;

    (H) establish and improve the review of internal management system of institutions;

    (IX) review officers are required to participate in continuing education.

    The people's Governments above the county level shall supervise and check the Department of housing and urban-rural construction, and the review bodies entitled to be examined relevant documentation review of documentation and information, and monitor the results to the public.

    20th review bodies to the local people's Governments at or above the county level should review of the Department of housing and urban-rural construction statistics.

    Local people's Governments at or above the county level departments of housing and urban-rural construction should be regular statistics on the construction drawing review, and statistics are submitted to the next higher competent Department of housing and urban-rural construction.

    21st people's Governments above the county level departments of housing and urban-rural construction should be accepted in a timely manner the review construction drawings in the illegal or irregular spotting, accusation and complaint.

    22nd the people's Governments above the county level shall review body report by the housing and urban-rural construction departments units, reconnaissance and design enterprises, registered practitioners of illegal behavior should be investigated according to law.

    Article 23rd review bodies included in the list no longer meet the required conditions, provinces, autonomous regions and municipalities departments of housing and urban-rural construction should be ordered to rectify; fails to change and no longer be included in the review directory.

    24th article censorship in violation of the rules of any of the following acts, local people's Governments at or above the county level departments of housing and urban-rural construction ordered corrective action and fine of 30,000 yuan, and credited to the credit files in serious cases, provinces, autonomous regions and municipalities directly under the people's Government Department of housing and urban-rural construction no longer be included in the review directory:

    (A) out of range construction plan review;

    (B) use qualified inspectors;

    (C) review of the content that is not in accordance with the regulations;

    (D) is not required to report violation found during the review process;

    (V) fill in the review notice not according to stipulations;

    (F) in accordance with stipulations in the examination book and signed and sealed on the construction drawings;

    (G) certificate of examination of construction drawing, there are still violations of law, regulation and engineering construction compulsory standard.

    25th false examination book issued by the review bodies, examination is not valid, local people's Governments at or above the county level at the Department of housing and urban-rural construction of 30,000 yuan fine, provinces, autonomous regions and municipalities directly under the people's Government Department of housing and urban-rural construction no longer be included in the review directory.

    Inspector signing the false examination book, life no longer in charge of the examination staff; for implementing certified systems professional reviewers, should also be in accordance with the regulations on the management of construction engineering quality 72nd, the work safety of construction projects management article 58th of the Ordinance shall be punished.

    Article 26th violates these rules, any of the following acts, local people's Governments at or above the county level departments of housing and urban-rural construction correction of 30,000 yuan fines; the circumstances are serious, be informed:

    (A) reasonable review cycle of compression;

    (B) providing true trial information;

    (Iii) to review bodies does not comply with law, regulation and engineering construction compulsory standard requirement.

    Construction enterprises for real estate development, real estate development enterprise quality management should also be in accordance with the rules for processing.

    27th in accordance with this regulation, censorship fines, legal representative of the institution and fine bodies and other persons 5% up to 10% the amount of the fine, and credited to the credit file.

    28th of provinces, autonomous regions and municipalities directly under the people's Government Department of housing and urban-rural construction does not review body established under these rules, housing and urban-rural construction departments under the State Council shall order correction.

    29th State personnel in the construction drawing review regulatory dereliction of duty, abuse of power, favoritism and constitutes a crime, criminal responsibility shall be investigated according to law; do not constitute a crime, administrative sanctions according to law.

    30th of provinces, autonomous regions and municipalities directly under the people's Government Department of housing and urban-rural construction in accordance with the measures, formulate rules for its implementation. 31st article this way come into force on August 1, 2013. Originally released on August 23, 2004, Ministry of construction of the buildings and municipal infrastructure engineering, construction drawing design document to review regulation (Ministry of construction, the 134th) repealed simultaneously.