People's Republic of China State Council

No. No. 599

                     The electricity emergency treatment, investigation and handling of Executive meeting of the State Council on June 15, 2011 the 159th adoption of the regulations, are hereby promulgated and, as of September 1, 2011.

                   Prime Minister Wen Jiabao

 

The July 7, 2011

Electrical safety regulations on emergency handling, investigation and handling of accidents

Chapter I General provisions

First in order to enhance electrical safety accident emergency handling, power safety accident investigation, control, mitigate and eliminate electrical safety accidents, this Ordinance is enacted.

Second power accidents referred to in these regulations refers to electricity production or effect of electric power system safe and stable operation or power supply incidents (including the effects of thermal power plant thermodynamic accidents of normal supply). Article under the electricity safety (hereinafter referred to as accidents) affect power system safe and stable operation, or power (thermal) extent of normal supply, accidents are divided into major accidents, fatal accidents, large accidents and accidents in General. Accident classification standards shown by the first schedule to the Ordinance.

Accident classification standards portion of the project needs to be adjusted, the electricity regulatory body under the State Council put forward the proposals, approved by the State Council.

By an independent or through a single transmission line connected with the other provinces where the people's Governments at the provincial level by provincial power supply cities, as well as by a single transmission line or a single substation power supply in other districts of cities, county-level cities, reduce its power grid for load or cause power outage accident rating standard, regulators shall be separately formulated by the State Council, the State Council for approval.

Fourth State power regulators should enhance electrical safety supervision and administration, according to law, and improve incident response and investigation and handling of the system, organizing or participating in the investigation and handling of accidents.

Electricity regulatory body under the State Council and the State Council Energy Department and the other departments concerned, permissions for the local people's Governments and relevant departments in accordance with State regulations and procedures, organization, coordination and emergency handling involved in the accident.

The fifth electric power enterprises, consumers, and other relevant units and individuals shall comply with the electrical safety regulations, implementing accident prevention measures, to prevent and avoid accidents.

Relevant departments of the local people's Governments at or above the county level shall determine the important power user should be configured in accordance with the provisions of the electricity regulatory body under the State Council-owned emergency power and to strengthen safety management. Sixth after the accident, power companies and other units concerned shall provide for timely, accurate reporting of accidents, emergency handling, accident prevention to expand and reduce accidents.

Electric power enterprises shall as soon as possible to restore power generation, grid operation and power (thermal) regular supply.

Seventh no unit or individual may obstruct or interfere with emergency handling and accident reporting, investigation and handling according to law.

Chapter reports Eighth after the accident, scene of the accident the staff on duty should run immediately to the power plant and substation personnel, dispatching reports of Heads of agency duty officer or the corporate scene. After receiving the report, the person concerned shall immediately higher electric power dispatching reports of Heads of institutions and enterprises.

This enterprise head received report Hou, should immediately to State power regulatory institutions set in local of sent institutions (following said accident occurred to power regulatory institutions), and County above government safety supervision management sector report; thermal power plant accident effect thermal normal supply of, also should to heating management sector report; accident involved hydropower plant (station) dam security of, also should while to has jurisdiction right of water administrative competent sector or basin management institutions report.

Electric power enterprises and its associated personnel not later than news, false negatives or false claim and skimming incidents.

Nineth accidents reported to the electricity regulatory body after the accident shall immediately verify the information, reported to the electricity regulatory body under the State Council; accidents caused by power outage, local people's Governments at or above the county level shall at the same time inform the accident occurred.

For particularly serious accidents, fatal accidents and electricity regulatory body under the State Council shall immediately report to the State Council after receiving the accident report, and to inform the State production safety supervision and Administration Department, Energy Department and other relevant departments under the State Council.

Tenth report should include the following:

(A) the time and place of the accident (regional) as well as units of the accident;

(B) the known damage to electrical equipment, facilities, and outage of power (heating) unit number, power reduction for load or power plant reduced output values, blackout (stop hot) range;

(C) the preliminary judging of the accident;

(D) measures taken after the accident, the operation of power grids, generator set operation and control of accidents;

(E) other reports.

New developments after reports of the accident shall promptly remedy.

11th after the accident, units and staff shall properly to protect the scene of the accident as well as logbooks, votes, actions, and other related materials, save fault wave recorder, power dispatch data, generating data and power transmission and transformation equipment operation data and other relevant information, and accident investigation team after the establishment of related materials, information transfer of accident investigation team.

Rescue personnel or to restore the electric power production, grid operation, power supply and other emergency measures needed to change the scene of the accident, mobile electrical equipment should be marked, draw diagrams, keep important traces, evidence, and make a written record.

No unit or individual shall not intentionally destroy the scene of the accident, or forge, conceal or destroy evidence.

Chapter III accident emergency

12th electricity regulatory body under the State Council in accordance with the People's Republic of China emergency response Act and of the national emergency response plan for public emergencies in General, prepare national emergency response plan for dealing with power blackout incidents, reported to the State Council for approval.

Relevant local people's Government shall, in accordance with laws, administrative regulations and the State emergency response plan for dealing with power blackout incidents, organize disposal power blackout emergency plans for their respective administrative areas.

Disposal power blackout emergency preparedness should the emergency command structure and responsibilities, emergency measures, as well as personnel, financial, material, technical and other emergency support specific provisions.

13th electric power enterprises shall, in accordance with relevant regulations of the State, development of emergency plan of the enterprise.

Regulators should guide the construction of power enterprises to enhance the power emergency rescue teams, improve the system of emergency stocks.

14th after the accident, the electric power enterprises shall immediately take appropriate emergency measures, control the scope of the accident and prevent power systemic collapse and disintegration; accidents endanger the safety of persons and equipment, power plant and substation on duty in accordance with the relevant provisions, take immediate outage generators and power transmission equipment and other emergency measures.

Accident damage to electrical equipment, facilities, and related electric power enterprises shall immediately organize the repair.

15th according to the specific circumstances of the accident, power dispatch agencies can publish open or shut down generators, adjusting the generator active and reactive load, adjust the operation of power grids, adjust the supply control power dispatching commands, power plants, power users should be implemented.

Accidents can lead to damaged power system stability and power blackouts, power dispatch agencies have the right to decide to take limited load, splitting power, splitting of generators and other measures as may be necessary.

16th accident caused power blackouts and electricity regulatory body under the State Council and other relevant departments, electric power companies, relevant local people's Government shall, in accordance with relevant regulations of the State, start the appropriate contingency plans, set up emergency response command structure, power and power supply as soon as possible to prevent the occurrence of secondary disasters.

17th accident caused power blackouts, local people's Governments concerned and shall immediately organize the relevant departments to carry out emergency handling of the following:

(A) to strengthen the people's livelihood in the blackout area, national security units and public security safety and security, prevent that disrupt public order Act, safeguarding social stability;

(B) promptly excluded the danger due to power failure;

(C) accidents resulting in heavy casualties or in need of emergency transfers, the placement of the trapped men, timely implementation of treatment, transfers, job placement;

(D) strengthen the blackout area road traffic control and guidance, railways, civil aviation, transport, and communications security;

(E) emergency organizations emergency supplies and calls, the network resumes supplies of necessary goods and basic means of subsistence.

18th accident caused significant interruptions to the electricity power supply, major electricity users should be in accordance with the relevant technical requirements of the prompt start of its own emergency power supply invalid launched their own emergency power supply, power grid enterprises should provide the necessary support.

Accident resulted in subways, airports, high-rise buildings, shopping malls, theaters, stadiums and others gathering places power should be quickly enabled emergency lighting, orderly evacuation organization.

19th restore grid operation and power supply, should give priority to ensuring the important plant power transmission and distribution equipment, electrical, important backbone of recovery, giving priority to restore essential power users, major cities, main power supply.

20th emergency command structure or regulators shall, in accordance with the relevant regulations, uniform, accurate, and timely dissemination of relevant scope, dealing with progress information, estimated time of restoration.

The fourth chapter, investigation and handling of accidents

21st special major accidents by the State Council or sectoral organizations authorized by the State Council investigation team to investigate the accident.

Major accident accident investigation team organized by the electricity regulatory body under the State Council to investigate. Larger accidents, General accident by accident to power watchdog organization investigation team to investigate the accident.

Electricity regulatory body under the State Council deems necessary, may appoint an accident investigation team to investigate the larger accident.

General accident did not cause power outage, power regulator or Commission where the accident occurred units investigate and deal with the accident.

22nd article according to the specific circumstances of accidents, accident investigation by regulators, the local people's Governments concerned, work safety supervision and management departments and departments responsible for the supervision and administration of production safety-related people; the officer suspected of dereliction of duty, malfeasance or suspected of a crime, supervisory organs and the public security organs, people's procuratorates should be invited to send participants.

According to accident investigation work needs, accident investigation teams to employ experts to assist the investigation.

Incident investigation team leader accident investigation team designated by the organization.

23rd accident investigation group should be carried out in accordance with the relevant provisions of the State investigation, and within the following time limits to the organizational accident investigation group submit accident report:

(A) special investigations of major accidents and major incidents for a period of 60 days under special circumstances, approved by the accident investigation team of the Organization authority, may extend, but extended periods of not more than 60 days.

(B) large accidents and accident investigation for a period of 45 days under special circumstances, approved by the accident investigation team of the Organization authority, may extend, but the extension period shall not exceed 45 days.

Accident investigation period counted from the date of the accident.

24th survey report should include the following:

(A) the accident unit profile and after the accident;

(B) direct economic loss caused by accidents and accidents on power grid operation, power (thermal) normal supply conditions;

(C) the cause of the accident and the nature of the accident;

(D) emergency disposal and recovery power generation, grid operation;

(V) responsibility and liability for the accident unit, responsible for the recommendations;

(F) the accident prevention and corrective actions. Accident investigation report shall attach the relevant evidentiary material and technical analysis.

Members of the accident investigation team should sign the accident investigation report.

25th accident investigation report by the accident investigation team of the Organization Authority agrees, accident investigation work will come to an end; the delegate general accident accident investigation unit, accident investigation report shall be submitted to the power regulators agree where the accident occurred.

Competent authorities shall, in accordance with the accident and relevant persons punished, disciplined national staff with responsibility for accidents.

Accident occurred units shall bear the liability for this unit personnel for processing.

26th incident unit and related personnel should learn from accidents and implementation of accident prevention and measures to prevent the recurrence of accidents.

Power regulators, safety supervision and management departments and departments responsible for the supervision and administration of production safety-related accidents should be units and associated personnel, implementation of preventive and corrective measures for the supervision and inspection of the accident.

The fifth chapter legal liability

27th accident of electric power enterprises in charge of any of the following acts, the power regulator on its annual income 40% to 80% fine belonging to agents of the State, and shall be subject to punishment constitutes a crime, criminal responsibility shall be investigated in accordance with law:

(A) not immediately organized rescue;

(B) late or fail to report accidents;

(C) during the period of investigation and handling of accidents absence.

28th article occurred accident of power enterprise and about personnel has following behavior one of of, by power regulatory institutions on power enterprise at 1 million Yuan above 5 million Yuan following of fine; on main head, and directly is responsible for of competent personnel and other directly responsibility personnel at its Shang a annually income 60% to 100% of fine, belongs to national staff of, and law give disposition; constitute violation security management behavior of, by police organ law give security management punishment; constitute crime of, law held criminal:

(A) misrepresent or conceal the accident;

(B) forge or vandalism, the scene of the accident;

(C) the transfer of funds, property, concealment or destruction of relevant evidence and information;

(D) refused to accept the investigation or refuses to provide relevant information and materials;

(E) perjury or instigate others to commit perjury in the investigation of the accident;

(Vi) go into hiding after the accident.

29th power Enterprise responsible for the accidents, the power regulator fined in accordance with the following provisions:

(A) the General accident, fines of between 100,000 yuan and 200,000 yuan;

(B) large accidents, fines of between 200,000 yuan and 500,000 yuan;

(C) the major accident, between less than 2 million Yuan and 500,000 yuan in fines;

(D) major accidents occur, fined not more than 2 million Yuan and more than 5 million Yuan.

The 30th Chief of electric power enterprise safety production management of failing to perform their duties, cause an accident, fined by regulators follows belonging to agents of the State, and shall be subject to punishment constitutes a crime, criminal responsibility shall be investigated in accordance with law:

(A) the General accident, fine at its previous annual income of 30%;

(B) the larger accident, fine at its previous annual income of 40%;

(C) the major accident, fine at its previous annual income of 60%;

(D) major accidents occur, fine at its previous annual income of 80%.

31st Chief of electric power enterprise in pursuance of this Ordinance the 27th, 28th, 30th article by dismissal or criminal penalties, punishment date or within 5 years from the date of completion of penalty may not serve as any production and business operation entities primarily responsible.

Article 32nd power regulatory authority, the relevant local people's Government and other departments responsible for the supervision and administration of production safety-related one of any of the following acts, the directly responsible person in charge and other direct liable persons shall be given administrative sanctions directly responsible person in charge and other direct liable persons constitutes a crime, criminal responsibility shall be investigated in accordance with law:

(A) not immediately organized rescue;

(B) later, and false negatives or false claim and skimming of accident;

(C) obstruct, interfere in accident investigations;

(D) perjury or instigate others to commit perjury in the investigation of the accident.

Article 33rd participate in accident investigations, accident investigations of any of the following acts shall be given disciplinary action constitutes a crime, criminal responsibility shall be investigated in accordance with law:

(A) not responsible for accident investigations, accident investigations have major omissions;

(B) the harboring and protecting staff with responsibility for accidents or taking revenge.

The sixth chapter supplementary articles 34th article occurred this Ordinance provides of accident, while caused personnel casualties or directly economic loss, in accordance with this Ordinance determine of accident grade and in accordance with production security accident report and survey processing Ordinance determine of accident grade not same of, by accident grade high who determine accident grade, in accordance with this Ordinance of provides survey processing; accident caused personnel casualties, constitute production security accident report and survey processing Ordinance provides of major accident or special major accident of, in accordance with

Production safety accident reporting and investigation of provisions of the regulation on the handling of investigations.

Electricity production or occur during power generation equipment or power transmission equipment damaged, causing a direct economic loss of, does not affect the normal electric power system safe and stable operation of power supply, the power regulator in accordance with the production safety accident reporting, investigation and handling of accident investigations team of provisions of the Ordinance on major accidents, large accidents, accident investigation and treatment.

35th article of the Ordinance on reporting and investigation process is not specified, applies the provisions of the regulations on production safety accident reporting, investigation and handling of.

Article 36th emergency handling, investigation and handling of nuclear accidents of nuclear power plants, nuclear power plant nuclear accident emergency management in accordance with the provisions of that Ordinance.



The 37th article of the regulations come into force September 1, 2011.

Attached:



Electrical safety rating standard

Sentenced to

Book

Things

Therefore,

Wait



Class



Proportion of power grid for load reduction



Proportion of city power outage



Power plant or factory is due to security failures in substations (station) effects and duration of the interruption



Generator due to security failures time and consequences of shutdown



External heating unit stopped heating time

Special major



Accident

1. regional network for load reduction by more than 30%

2. load more than 20000 MW of power of provinces, autonomous regions, and for loading reduction over 30%

3. load 5000 megawatts more than 20000 MW of power of provinces, autonomous regions, and for loading reduction over 40%

4. the municipality power for load reduction by more than 50%



5. load of more than 2000 MW where the people's Governments of provinces, autonomous regions urban power grid for load reduction by more than 60%

1. the municipalities more than 60% power outage



2. load more than 2000 MW of the cities where the people's Governments of provinces, autonomous regions 70% power supply outage



Major accident

1. regional grid for load reduction by more than 10% 30%

2. load more than 20000 MW of power of provinces, autonomous regions, for load reduction by more than 13% 30%

3. load 5000 megawatts more than 20000 MW of power of provinces, autonomous regions, for load reduction by more than 16% 40%

4. load 1000 megawatts more than 5000 MW of power of provinces, autonomous regions, and for loading reduction over 50%

5. the municipalities grid for load reduction by more than 20% 50%

6. where the people's Governments of provinces, autonomous regions urban power grid for load reduction over 40% (load of more than 2000 MW, for load reduction over 40% 60%)



7. load other districts more than 600 megawatts of power for load reduction by more than 60%

1. municipality of 30% up to 60% the power outage

2. urban 50% where the people's Governments of provinces, autonomous regions more power outage (load of more than 2000 MW, 50% more than 70% below)



3. the load more than 600 megawatts of 70% more than in other districts of city power outage



Larger accidents

1. regional grid for load reduction by more than 7% 10%

2. load more than 20000 MW of power of provinces, autonomous regions, for load reduction by more than 10% 13%

3. load 5000 megawatts more than 20000 MW of power of provinces, autonomous regions, for load reduction by more than 12% 16%

4. load 1000 megawatts more than 5000 MW of power of provinces, autonomous regions, for load reduction by more than 20% 50%

5. load of up to 1000 MW power of provinces, autonomous regions, and for loading reduction over 40%

6. the municipalities grid for load reduction by more than 10% 20%

7. where the people's Governments of provinces, autonomous regions urban power grid for load reduction by more than 20% 40%

8.40% grid for load reduction, other districts more than (load more than 600 MW, for load reduction over 40% 60%)



9. load 150 megawatts above the county-level city power grid for load reduction by more than 60%

1. municipality of 15% up to 30% the power outage

2. where the people's Governments of provinces, autonomous regions, city 30% more than 50% the following power outage

3. the other districts of the city 50% electricity outage (electric load more than 600 megawatts of 50% more than 70% below)



4. the load more than 150 megawatts over 70% of the county-level city power outage



Power plants or plant due to security failures in more than 220,000-volt substation (station) the interruption, leads voltage monitor control voltage is lower than the voltage curve under the scheduling value of 20% and duration of 30 minutes or more, or leads voltage monitor control voltage below the dispatching agency voltage curve of 10% and duration of 1 hour or more



Due to security failures to stop running the generator group exceed the industry standards overhaul for two weeks and led to power reduction for load



Heating unit installed capacity of more than 200 megawatts of thermal power plant, occurred in the heating period of the local people's Government at the same time more than 2 heating units due to security failures to stop working, resulting in all external stops heating and the duration of 48 hours or more



General accident

1. regional grid for load reduction by more than 4% 7%

2. load more than 20000 MW of power of provinces, autonomous regions, for load reduction by more than 5% 10%

3. load 5000 megawatts more than 20000 MW of power of provinces, autonomous regions, for load reduction by more than 6% 12%

4. load 1000 megawatts more than 5000 MW of power of provinces, autonomous regions, for load reduction by more than 10% 20%

5. load of up to 1000 MW power of provinces, autonomous regions, for load reduction by more than 25% 40%

6. the municipalities grid for load reduction by more than 5% 10%

7. where the people's Governments of provinces, autonomous regions urban power grid for load reduction by more than 10% 20%

8. the other districts of the city grid for load reduction 20% 40%



9. the city for load reduction over 40% (load more than 150 megawatts, for load reduction over 40% 60%)

1. municipality of 10% up to 15% the power outage

2. where the people's Governments of provinces, autonomous regions, city 15% more than 30% the following power outage

3. the other districts of the city 30% 50% the following power outage



4. more than 50% County power outage (electric load more than 150 megawatts of 50% more than 70% below)



Power plants or plant due to security failures in more than 220,000-volt substation (station) the interruption, leads voltage monitor control voltage below the dispatching agency voltage curve of 5% more than 10% and lasts for more than 2 hours



Due to security failures to stop running the generator group exceeds industry standards for repairs at the time of two weeks, and cause power reduction for load



Heating unit installed capacity of more than 200 megawatts of thermal power plant, occurred in the heating period of the local people's Government at the same time more than 2 heating units due to security failures to stop working, causing the plant outside to stop heat and duration of more than 24 hours

Note:

1. one of the circumstances listed in this table, constitutes the appropriate level of electrical safety.

2. This table called the "above" include the number, "the following" not including the number itself.

3. the meaning of the following terms used in this table:

(1) the load refers to electric power dispatching control of power grids in the actual load of the start time of the accident;

(2) power grid for load reduction, refers to the electric power dispatching control of power during the actual load maximum reduction of the accident;

(3) plant-wide interruption refers to external active load power plants to zero (load on the power grid via bus transfer in power plant did not stop, as a plant-wide interruption); (4) due to security failures to stop running the generator group, refers to the parallel operation of generators (including various types of boiler, steam turbine, gas turbine, turbine, generator and main transformer and other major power equipment), without the availability of power dispatch Agency, due to security failures needs to stop running state.