Opens to the Investment Budget for 2000, in favor of various companies of the ELECTROBRÁS Group, special credit in the total value of R$ 35,825,592.00, for the purposes it specifies.
THE PRESIDENT OF THE REPUBLIC, I make it known that the National Congress decrees and I sanction the following law:
Art. 1º It is open to the Budget of Investment (Law No. 9,969, of May 11, 2000) special credit at the total value of R$ 35,825,592.00 (thirty five million, eight hundred and twenty-five thousand and five hundred and ninety-two reais), in favor of various companies of the ELECTROBRÁS Group, to meet the constant schedule of Annex I to this Act.
Art. 2º The resources required for the implementation of the provisions of the previous article come from repasses of the controller, as demonstrated in?Table Synthesis by Revenue? constant of Annex I to this Law, and of cancellation in other projects, as per Annex II constant to this Law.
Art. 3º This Law comes into effect on the date of its publication.
Brasília, 19 of December 2000; 179º of Independence and 112º of the Republic.
Fernando henrique cardoso
Martus Tavares
ORGAN: 32000-MINISTRY OF MINES AND ENERGY | ||||||||
ANNEX I SPECIAL CREDIT WORK PROGRAM (SUPPLEMENTATION) RESOURCES OF ALL FONTS-R$ 1.00 | ||||||||
TOTAL OF THE ORGAN: R$ 35,825,592 | ||||||||
SYNTHESIS FRAMEWORK BY FUNCTIONS 25 ENERGY |
35,825,592 | |||||||
SYNTHESIS FRAME BY SUBFUNCTIONS 752 ELECTRICAL POWER |
35,825,592 | |||||||
SYNTHESIS FRAME BY PROGRAMS 0294 ENERGY ON THE NORTHEAST AXES 0295 ENERGY ON THE SOUTH AXIS 0297 ENERGY IN THE WOOD-AMAZON AXIS |
4.240.000 2,000,000 29,585,592
| |||||||
TABLE SYNTHESIS BY BUDGETING UNIT 32268 ALAGOAS ENERGY COMPANY 32270 RÔDONIA S. A. POWER PLANTS 32276 THERMAL GENERATION COMPANY OF ELECTRIC POWER 32277 AMAZONAS ENERGY COMPANY |
4,240,000 1,100,000 2.000.000 28,485,592 | |||||||
TABLE SYNTHESIS BY FONTS AND EXPENSE GROUPS 495 BUDGET RESOURCES OF INVESTMENTS INVESTMENT |
35,825,592 35,825,592 | |||||||
TOTAL INVESTMENT | 35,825,592 35,825,592 | |||||||
TABLE SYNTHESIS BY REVENUE 6.0.0.0.00.00 SOURCE OF FINANC. FROM THE INVESTMENT BUDGET 6.9.0.0.00.00 OTHER LONG TERM RESOURCES 6.920.0.00.00 CONTROLLER TOTAL REVENUE 32,725,592 CURRENT REVENUE 0 CAPITAL REVENUE |
32,725,592 32,725,592 32,725,592 32,725,592 | |||||||
ORGAN: 32000-MINISTRY OF MINES AND ENERGY UNITY: 32268-ENERGY COMPANY OF ALAGOAS | ||||||||
ANNEX I SPECIAL CREDIT PROGRAM OF WORK (SUPPLEMENTATION) RESOURCES FROM ALL SOURCES-R$ 1, 00 | ||||||||
TOTAL OF THE UNIT: R$ 4,240,000 | ||||||||
FRAME SYNTHESIS BY FUNCTIONS 25 ENERGY |
4,240,000 | |||||||
SYNTHESIS FRAMEWORK BY SUBFUNCTIONS 752 ELECTRICAL POWER |
4,240,000 | |||||||
SYNTHESIS FRAMEWORK BY PROGRAMS 0294 ENERGY ON THE NORTHEAST AXES
|
4,240,000 | |||||||
TABLE SYNTHESIS BY FONTS AND EXPENSE GROUPS 495 BUDGET RESOURCES OF INVESTMENTS INVESTMENT |
4,240,000 4,240,000 | |||||||
TOTAL INVESTMENT | 4.240.000 4,240,000 | |||||||
TABLE SYNTHESIS BY REVENUE 6.0.0.0.00.00 SOURCE OF FINANC. FROM THE INVESTMENT BUDGET 6.9.0.0.00.00 OTHER LONG TERM RESOURCES 6.920.0.00.00 CONTROLLER TOTAL REVENUE 4,240,000 CURRENT REVENUE 0 CAPITAL REVENUE |
4,240,000 4,240,000 4,240,000 4.240.000 | |||||||
ORGAN: 32000-MINISTRY OF MINES AND ENERGY UNITY: 32268-ENERGY COMPANY OF ALAGOAS | ||||||||
ANNEX I SPECIAL CREDIT WORK PROGRAM (SUPPLEMENTATION) RESOURCES FROM ALL SOURCES-R$ 1, 00 | ||||||||
FUNC. | PROGRAMMATIC | PROGRAMA/ACTION/SUBTLE/PRODUCT | ESF | G N D | M O D | I U | F T E | VALOR |
0294 ENERGY ON THE NORTHEAST AXES 4,240,000 | ||||||||
|
| PROJECTS |
|
|
|
|
|
|
25752 | 0294 1565 | DEPLOYMENT OF DISTRIBUTION SYSTEM RURAL IN THE STATE OF ALAGOAS |
|
|
|
|
| 4.240.000 |
25752 | 0294 1565 0001 | IMPLANTATION OF RURAL DISTRIBUTION SYSTEM IN THE STATE OF ALAGOAS-IN THE STATE OF ALAGOAS-IMPLANTED SYSTEM (%) 100 |
|
|
|
|
| 4,240,000 |
|
|
| I | 4-INV | 90 | 0 | 495 | 4,240,000 |
TOTAL-INVESTMENTS 4,240,000 | ||||||||
ORGAN: 32000-MINISTRY OF MINES AND ENERGY UNITY: 32270-ELECTRICAL POWER PLANTS OF RÔDONIA S.A. | ||||||||
ANNEX I SPECIAL CREDIT WORK PROGRAM (SUPPLEMENTATION) RESOURCES FROM ALL SOURCES-R$ 1, 00 | ||||||||
TOTAL OF THE UNIT: R$ 1,100,000 | ||||||||
FRAME SYNTHESIS BY FUNCTIONS 25 ENERGY |
1,100,000 | |||||||
SYNTHESIS FRAMEWORK BY SUBFUNCTIONS 752 ELECTRICAL POWER |
1.100.000 | |||||||
SYNTHESIS FRAMEWORK BY PROGRAMS 0297 ENERGY IN THE WOOD-AMAZON AXIS
|
1,100,000 | |||||||
TABLE SYNTHESIS BY SOURCES AND EXPENSE GROUPS 495 INVESTMENTS BUDGET RESOURCES INVESTMENT |
1,100,000 1.100.000 | |||||||
TOTAL INVESTMENT |
1,100,000 1.100.000 | |||||||
ORGAN: 32000-MINISTRY OF MINES AND ENERGY UNITY: 32270-RONDÔNIA S. A. ELECTRICAL POWER PLANTS | ||||||||
ANNEX I SPECIAL CREDIT WORK PROGRAM (SUPPLEMENTATION) RESOURCES FROM ALL SOURCES-R$ 1, 00 | ||||||||
FUNC. | PROGRAMMATIC | PROGRAMA/ACTION/SUBTLE/PRODUCT | ESF | G N D | M O D | I U | F T E | VALOR |
0297 ENERGY IN THE WOOD-AMAZON AXIS 1,100,000 | ||||||||
|
| ACTIVITIES |
|
|
|
|
|
|
25752 | 0297 2265 | MAINTENANCE OF THE GENERATION SYSTEM OF ELECTRIC POWER |
|
|
|
|
| 1.100.000 |
25752 | 0297 2265 0001 | MAINTENANCE OF THE ELECTRICAL POWER GENERATION SYSTEM-IN THE STATE OF RONDÔNIA-MAINTAINED SYSTEM (UNIT) 1 |
|
|
|
|
| 1.100.00 |
|
|
| I | 4-INV | 90 | 0 | 495 | 1,100,000 |
TOTAL-INVESTMENTS 1,100,000 | ||||||||
ORGAN: 32000-MINISTRY OF MINES AND ENERGY UNITY: 32276-COMPANY OF THERMAL POWER GENERATION. | ||||||||
ANNEX I SPECIAL CREDIT WORK PROGRAM (SUPPLEMENTATION) RESOURCES FROM ALL SOURCES-R$ 1, 00 | ||||||||
TOTAL OF THE UNIT: R$ 2,000,000 | ||||||||
PICTURE SYNTHESIS BY FUNCTIONS 25 ENERGY |
2,000,000 | |||||||
SYNTHESIS FRAMEWORK BY SUB-FUNCTIONS 752 ELECTRICAL POWER |
2.000.000 | |||||||
SYNTHESIS FRAMEWORK BY PROGRAMS 0295 POWER ON THE SOUTH AXIS |
2,000,000 | |||||||
TABLE SYNTHESIS BY SOURCES AND EXPENSE GROUPS 495 INVESTMENT BUDGET RESOURCES INVESTMENT |
2,000,000 2.000.000 | |||||||
TOTAL INVESTMENT | 2,000,000 2,000,000 | |||||||
ORGAN: 32000-MINISTRY OF MINES AND ENERGY UNITY: 32268-THERMAL POWER GENERATION COMPANY | ||||||||
ANNEX I CREDIT SPECIAL WORK PROGRAM (SUPPLEMENTATION) RESOURCES FROM ALL SOURCES-R$ 1, 00 | ||||||||
FUNC. | PROGRAMMATIC | PROGRAMA/ACTION/SUBTLE/PRODUCT | ESF | G N D | M O D | I U | F T E | VALOR |
0295 POWER ON THE SOUTH AXIS 2,000,000 | ||||||||
|
| PROJECTS |
|
|
|
|
|
|
25752 | 0295 1127 | IMPLANTATION OF THE PLANT THERMELOMETRIC CANDIOTA III WITH CAPACITY OF 350 MW |
|
|
|
|
| 1.000.000 |
25752 | 0295 1127 0001 | IMPLANTATION OF THE THERMOMETRIC POWER PLANT CANDIOTA III CO M CAPACITY OF 350 MW-IN SOUTHERN REGION-IMPLANTED PLANT (%) 3 |
|
|
|
|
| 1,000,000 |
|
|
| I | 4-INV | 90 | 0 | 495 | 1.000.000 |
25752 | 0295 1133 | STUDY FOR IMPLANTATION OF THE TRANSFORMATION PROJECT OF THE MERRY-NUTEPA PORT THERMELOMETRIC PLANT FOR OIL REPLACEMENT FUEL BY NATURAL GAS |
|
|
|
|
| 1.000.000 |
25752 | 0295 1133 0001 | STUDY FOR IMPLANTATION OF THE TRANSFORMATION PROJECT OF THE MERRY-NUTEPA PORT THERMELOMETRIC PLANT FOR OIL REPLACEMENT FUEL BY NATURAL GAS-IN THE SOUTH REGION-CARRIED OUT (UNIT) 1 |
|
|
|
|
| 1,000,000 |
|
|
| I | 4-INV | 90 | 0 | 495 | 1,000,000 |
TOTAL-INVESTMENTS 2,000,000 | ||||||||
ORGAN: 32000-MINISTRY OF MINES AND ENERGY UNITY: 32277-AMAZONAS ENERGY COMPANY | ||||||||
ANNEX I SPECIAL CREDIT WORK PROGRAM (SUPPLEMENTATION) RESOURCES FROM ALL SOURCES-R$ 1, 00 | ||||||||
TOTAL OF THE UNIT: R$ 28,485,592 | ||||||||
FRAME SYNTHESIS BY FUNCTIONS 25 ENERGY |
28,485,592 | |||||||
SYNTHESIS FRAMEWORK BY SUBFUNCTIONS 752 ELECTRICAL POWER |
28,485,592 | |||||||
SYNTHESIS FRAMEWORK BY PROGRAMS 0297 ENERGY IN THE WOOD-AMAZON AXIS |
28,485,592 | |||||||
TABLE SYNTHESIS BY SOURCES AND EXPENSE GROUPS 495 INVESTMENT BUDGET RESOURCES INVESTMENT |
28,485,592 28,485,592 | |||||||
TOTAL INVESTMENT | 28,485,592 28,485,592 | |||||||
PICTURE SYNTHESIS BY REVENUE 6.0.0.0.00.00 SOURCE OF FINANC. FROM THE INVESTMENT BUDGET 6.9.0.0.00.00 OTHER LONG TERM RESOURCES 6.9.2.0.00.00 CONTROLLER TOTAL REVENUE 28,485,592 CURRENT REVENUE 0 CAPITAL REVENUE |
28,485,592 28,485,592 28,485,592 28,485,592 | |||||||
ORGAN: 32000-MINISTRY OF MINES AND ENERGY UNITY: 32277-AMAZONAS ENERGY COMPANY | ||||||||
ANNEX I SPECIAL CREDIT PROGRAM OF WORK (SUPPLEMENTATION) RESOURCES FROM ALL SOURCES- R$ 1, 00 | ||||||||
FUNC. | PROGRAMMATIC | PROGRAMA/ACTION/SUBTSECURIE/PRODUCT | ESF | G N D | M O D | I U | F T E | VALOR |
0297 ENERGY IN THE WOOD-AMAZON AXIS 28,485,592 | ||||||||
|
| ACTIVITIES |
|
|
|
|
|
|
25752 | 0297 2009 | MAINTENANCE OF THE GENERATION SYSTEMS OF ELECTRICAL POWER IN CEAM ' S CONCESSION AREA |
|
|
|
|
| 16,325,000 |
25752 | 0297 2009 0001 | MAINTENANCE OF ELECTRICAL POWER GENERATION SYSTEMS IN THE CEAM CONCESSION AREA-IN THE STATE OF AMAZONAS-MAINTAINED SYSTEM (UNITY) 1 |
|
|
|
|
| 16,325,000 |
|
|
| I | 4-INV | 90 | 0 | 495 | 16,325,000 |
|
| PROJECTS |
|
|
|
|
|
|
25752 | 0297 1167 | EXTENSION OF THE URBAN POWER DISTRIBUTION NETWORK IN TOTAL OF 78.4 KM |
|
|
|
|
| 6,580,592 |
25752 | 0297 1167 0001 | MAGNIFICATION OF THE DISTRIBUTION NETWORK URBAN-IN THE STATE OF THE AMAZON-ENLARGED NETWORK (%) 35 |
|
|
|
|
| 6.580.592 |
|
|
| I | 4-INV | 90 | 0 | 495 | 6,580,592 |
25752 | 0297 1183 | REVITALIZATION OF THE CEAM THERMAL PARK WITH 71,228 KW OF INSTALLED POWER |
|
|
|
|
| 5.580.000 |
25752 | 0297 1183 0001 | REVITALIZATION OF THE CEAM THERMAL PARK WITH 71,228 KW OF INSTALLED POWER-IN THE STATE OF AMAZON PARK REVITALIZED (%) 42 |
|
|
|
|
| 5.580.000 |
|
|
| I | 4-INV | 90 | 0 | 495 | 5,580,000 |
TOTAL-INVESTMENTS 28,485,592 |
ANNEX II
CANCELLATION
ORGAN: 32 MINISTRY OF MINES AND ENERGY
ANNEX II SPECIAL CREDIT PROGRAM OF WORK (CANCELLATION) RESOURCES FROM ALL SOURCES- R$ 1, 00 | ||||||||
TOTAL OF THE ORGAN: R$ 3,100,000 | ||||||||
FRAME SYNTHESIS BY FUNCTIONS 25 ENERGY |
3,100,000 | |||||||
SYNTHESIS FRAMEWORK BY SUBFUNCTIONS 752 ELECTRICAL POWER |
3,100,000 | |||||||
SYNTHESIS FRAMEWORK BY PROGRAMS 0295 ENERGY ON THE SOUTH AXIS 0297 ENERGY IN THE WOOD-AMAZON AXIS |
3,100,000 3,100,000 | |||||||
TABLE SYNTHESIS PER UNIT BUDGET 32270 RÔDONIA S. A. Electrical Power Plants 32276 ELECTRIC POWER GENERATION COMPANY |
1,100,000 2.000.000 | |||||||
FRAMEWORK SYNTHESIS BY SOURCES AND EXPENSE GROUPS 495 INVESTMENTS BUDGET RESOURCES INVESTMENT |
3,100,000 3,100,000 | |||||||
TOTAL INVESTMENT |
3,100,000 3,100,000 | |||||||
ORGAN: 32000-MINISTRY OF MINES AND ENERGY UNITY: 32270-ELECTRICAL POWER PLANTS OF RÔDONIA S.A. | ||||||||
ANNEX II SPECIAL CREDIT PROGRAM OF WORK (CANCELLATION) RESOURCES FROM ALL SOURCES-R$ 1, 00 | ||||||||
TOTAL OF THE UNIT: R$ 1,100,000 | ||||||||
PICTURE SYNTHESIS BY FUNCTIONS 25 ENERGY |
1,100,000 | |||||||
SYNTHESIS FRAMEWORK BY SUBFUNCTIONS 752 ELECTRICAL POWER |
1,100,000 | |||||||
SYNTHESIS FRAMEWORK BY PROGRAMS 0297 ENERGY IN THE WOOD-AMAZON AXIS |
1,100,000 | |||||||
TABLE SYNTHESIS BY SOURCES AND EXPENSE GROUPS 495 INVESTMENTS BUDGET RESOURCES INVESTMENT |
1,100,000 1.100.000 | |||||||
TOTAL INVESTMENT | 1,100,000 1,100,000 | |||||||
ORGAN: 32000-MINISTRY OF MINES AND ENERGY UNITY: 32270-RONDÔNIA ELECTRIC POWER PLANTS S. A. | ||||||||
ANNEX II SPECIAL CREDIT WORK PROGRAM (CANCELLATION) RESOURCES FROM ALL SOURCES-R$ 1, 00 | ||||||||
FUNC. | PROGRAMMATIC | PROGRAMA/ACTION/SUBTLE/PRODUCT | ESF | G N D | M O D | I U | F T E | VALOR |
0297 ENERGY IN THE WOOD-AMAZON AXIS 1,100,000 | ||||||||
|
| PROJECTS |
|
|
|
|
|
|
25752 | 0297 3381 | DEPLOYMENT OF TRANSMISSION SYSTEM IN RONDÔNIA (110 KM LINE OF TRANSMISSION AND SUBSTATIONS WITH 45 MVA) |
|
|
|
|
| 1.100.000 |
25752 | 0297 3381 0001 | DEPLOYMENT OF TRANSMISSION SYSTEM IN RONDÔNIA (110 KM OF TRANSMISSION LINE AND SUBSTATIONS WITH 45 MVA)-IN THE STATE OF RONDÔNIA-SYSTEM IMPLANTED (%) 1 |
|
|
|
|
| 1,100,000 |
|
|
| I | 4-INV | 90 | 0 | 495 | 1,100,000 |
TOTAL-INVESTMENTS 1,100,000 | ||||||||
ORGAN: 32000-MINISTRY OF MINES AND ENERGY UNITY: 32276-COMPANY OF THERMAL POWER GENERATION. | ||||||||
ANNEX II SPECIAL CREDIT WORK PROGRAM (CANCELLATION) RESOURCES FROM ALL SOURCES-R$ 1, 00 | ||||||||
TOTAL PER UNIT: R$ 2,000,000 | ||||||||
PICTURE SYNTHESIS BY FUNCTIONS 25 ENERGY |
2,000,000 | |||||||
SYNTHESIS FRAMEWORK BY SUB-FUNCTIONS 752 ELECTRICAL POWER |
2.000.000 | |||||||
SYNTHESIS FRAMEWORK BY PROGRAMS 0295 POWER ON THE SOUTH AXIS |
2,000,000 | |||||||
TABLE SYNTHESIS BY SOURCES AND EXPENSE GROUPS 495 INVESTMENTS BUDGET RESOURCES INVESTMENT |
2,000,000 2.000.000 | |||||||
TOTAL INVESTMENT | 2,000,000 2,000,000 | |||||||
ORGAN: 32000-MINISTRY OF MINES AND ENERGY UNITY: 32276-THERMAL POWER GENERATION COMPANY | ||||||||
ANNEX II SPECIAL CREDIT WORK PROGRAM (CANCELLATION) RESOURCES FROM ALL SOURCES-R$ 1, 00 | ||||||||
FUNC. | PROGRAMMATIC | PROGRAMA/ACTION/SUBTSECURIE/PRODUCT | ESF | G N D | M O D | I U | F T E |
VALUE |
0295 ENERGY ON THE SOUTH AXIS 2,000,000 | ||||||||
|
| PROJECTS |
|
|
|
|
|
|
25752 | 0295 5557 | RE-POTENTIALIZATION OF THE GENERATING UNITS OF THE PRESIDENT MÉDICI PLANT |
|
|
|
|
| 2,000,000 |
25752 | 0295 5557 0001 | REPOTENTIALIZATION OF THE UNITS GENERATING PLANT PRESIDENT MÉDICI-IN THE STATE RIO GRANDE DO SUL-REPOTENTIALIZED PLANT (UNIT) 1 |
|
|
|
|
| 2,000,000 |
|
|
| I | 4-INV | 90 | 0 | 495 | 2,000,000 |
TOTAL-INVESTMENTS 2,000,000 |