Decree No. 6,536, of 11 AUGUST 2008.
Rules on the inclusion, in the national privatization Program-SNE, electric power transmission projects members of the Basic Network of the national interconnected system – NIS, determines the National Electric Energy Agency-ANEEL the promotion and monitoring of the processes of bidding of these concessions, and other matters.
The PRESIDENT of the REPUBLIC, in the use of the powers conferred. 84, subparagraphs IV and VI) (? the?, of the Constitution, and in view of the provisions of law No. 9 of 9,491 September 1997, DECREES: Art. 1 Are included in the national privatization Program-PND, for the purposes of the law of 9,491 9 September 1997, the following enterprises of electric power transmission Network Basic members of the national interconnected system – NIS, for interconnection of the hydropower plants of Santo Antônio and Jirau, located on the Madeira River, comprising two technological alternatives of electric power transmission : I-the alternative technological developments in direct current-DC: the Drip line) Porto Velho-Porto Velho, in 230 kV, 1 and 2 Circuits, in the State of Rondônia;
b) Drip Porto Velho, Substation in ± 600 kV direct current-DC/500/230 kV Ac-CA, located in the State of Rondônia;
c) AC/DC Converter from Bipolo in 1 in Porto Velho in Collector Substation 500 kV AC/± 600 kV DC, located in the State of Rondônia, and Inverting the DC/AC Bipolo in 1 in Araraquara 2 Substation, at ± 600 kV DC/500 kV AC, located in the State of São Paulo;
d) AC/DC Converter from Bipolo in 2 in Porto Velho in Collector Substation 500 kV AC/± 600 kV DC, located in the State of Rondônia, and Inverting the DC/AC Bipolo in 2 in Araraquara 2 Substation, at ± 600 kV DC/500 kV AC, located in the State of São Paulo;
e) transmission line Collector Porto Velho-Araraquara 2, Bipolo in 1, ± 600 kV DC, located in the States of Rondônia, Mato Grosso, Goiás, Minas Gerais and São Paulo;
f) transmission line Collector Porto Velho-Araraquara 2, Bipolo in 2, ± 600 kV DC, located in the States of Rondônia, Mato Grosso, Goiás, Minas Gerais and São Paulo;
g) Substation 2 in Araraquara ± 600 kV DC/500/440 kV CA, located in the State of São Paulo;
h) transmission line Araraquara-Araraquara 2-CTEEP, in 440 kV, 1 Circuit and 2, located in the State of São Paulo;
I) transmission line Araraquara-Araraquara 2-FURNAS, in 500 kV, 1 Circuit and 2, located in the State of São Paulo;
j) Cuiabá-Ribeirãozinho transmission line in 500 kV, located in the State of Mato Grosso; and l) transmission line Ribeirãozinho-Green River North, in 500 kV, located in the States of Mato Grosso and Goiás;
II-the alternative hybrid technology ventures, DC-DC and Ac-AC POWER: the Drip line) Porto Velho-Porto Velho, in 230 kV, 1 and 2 Circuits, in the State of Rondônia;
b) Drip Porto Velho, Substation in ± 600 kV DC/500/230 kV AC, located in the State of Rondônia;
c) transmission line Collector Porto Velho-Ji-Paraná, in 500 kV, 1 and 2 Circuits, in the State of Rondônia;
d) Ji-Paraná in Substation 500 kV, located in the State of Rondônia;
e) transmission line Ji-Paraná-Colorado do Oeste, in 500 kV, 1 and 2 Circuits, in the State of Rondônia;
f) Colorado West Substation, in 500 kV, located in the State of Rondônia;
g) Colorado West transmission line-500 kV, Jaurú, 1 and 2 Circuits, located in the States of Rondonia and Mato Grosso;
h) transmission line Jauru-Cuiabá, in 500 kV, 1 and 2 Circuits, in the State of Mato Grosso;
I) transmission line Cuiabá-the Araguaia River, in 500 kV, 1 Circuit and 2, located in the States of Mato Grosso and Goiás;
j) Substation the Araguaia River, in 500 kV, located in the State of Goiás;
l) transmission line the Araguaia River-red water in 500 kV, 2 Circuits 1 and 2, located in the States of Goiás and Minas Gerais;
m) Red Water Substation 500 kV, 2, located in the State of Minas Gerais;
n) transmission line 2-Red Water red water, in 500 kV, located in the State of Minas Gerais;
The Araraquara 2 in Substation) ± 600 kV DC/500/440 kV CA, located in the State of São Paulo;
p) transmission line Araraquara-Araraquara 2-FURNAS, in 500 kV, 1 Circuit and 2, located in the State of São Paulo;
q) transmission line Araraquara-Araraquara 2-CTEEP, in 440 kV, 1 Circuit and 2, located in the State of São Paulo;
r) Red Water transmission line 2-Araraquara 2, 500 kV Circuits in 1 and 2, located in the States of Minas Gerais and São Paulo;
s) AC/DC Converter 1 bipolo in Porto Velho in Collector Substation 500 kV AC/± 600 kV DC, located in the State of Rondônia, and Inverting DC/AC of 1 bipolo in Araraquara 2 Substation, at ± 600 kV DC/500 kV AC, located in the State of São Paulo; and t) transmission line Collector Porto Velho-Araraquara 2, 1 bipolo ± 600 kV DC, located in the States of Rondônia, Mato Grosso, Goiás, Minas Gerais and São Paulo.
Sole paragraph. The enterprises of electric power transmission referred to in this article include the deployment and expansion of substations and will be described and characterized in the respective notices of auction.
Art. 2nd Is the National Electric Energy Agency (ANEEL) responsible for promoting and monitoring the bidding procedures for the recruitment of public services of electric power transmission and for its granting of concession of the enterprises referred to in art. 1 pursuant to the item II of art. 3 of law No. 9,427 of December 26, 1996.
Art. 3 this Decree shall enter into force on the date of your publication.
Brasília, 11 August 2008; 187o of independence and 120(1) of the Republic.
LUIZ INACIO LULA DA SILVA Ivan João Guimarães Ramalho Edison Lobão