Regulation of the Regulatory Commission of E-Control, which provides for the charging of
for the Gas-System-Use-charges-Regulation 2013 is amended
(2. Gas-System-Use-Regulation 2013-Novelle 2014, 2. GSNE-VO 2013-Novelle 2014)
On the basis of § 24 and § 70 Gaswirtschaftsgesetz 2011-GWG 2011, BGBl. I n ° 107/2011 in the version of the Federal Law BGBl. I Nr. 174/2013 iVm § 12 sec. 2 Z 1 Energy Control Act-E-ControlG, BGBl. I No 110/2010 in the version of the Federal Law BGBl. I No 174/2013, shall be arranged:
The regulation of the Regulatory Commission of E-Control, which determines the charges for the use of systems in the gas industry (Gas-Systems-Use-charges-Ordination 2013, GSNE-VO 2013), BGBl. II No. 309/2012 in the version GSNE-VO 2013-Novelle 2014, BGBl. II No 479/2013, shall be amended as follows:
1. § 9 (1) (1) and (3) are:
" 1. |
Network provision charge for power-measured systems and storage systems of network levels 1 and 2: Areas Burgenland, Kärnten, Niederösterreich, Oberösterreich, Salzburg, Steiermark, Tirol, Vorarlberg and Vienna: |
|||||||||
a) |
for fixed capacity or Standard capacities: 3, -- € |
|||||||||
b) |
for interruptible capacity for storage facilities: 1,50 € " |
|||||||||
" 3. |
Network provision charge for power-measured plants and storage facilities of the network level 3 ranges of Burgenland, Carinthia, Lower Austria, Upper Austria, Salzburg, Styria, Tyrol, Vorarlberg and Vienna: |
|||||||||
a) |
for fixed capacities or Standard Capacity: 5, -- € |
|||||||||
b) |
for interruptible capacity for storage facilities: 2,50 € " |
Schramm