Advanced Search

Section Control Measurement Regulation Hummel Court 2014

Original Language Title: Section Control-Messstreckenverordnung Hummelhof 2014

Subscribe to a Global-Regulation Premium Membership Today!

Key Benefits:

Subscribe Now for only USD$40 per month.

287. Regulation of the Federal Minister of Transport, Innovation and Technology on a section-related speed monitoring 2014 in the area of the node Linz-Hummelhof of the A 7 Mühlkreis Autobahn (Section Control-Messstreckenverordnung Hummelhof 2014)

Pursuant to Section 98a (1) of the StVO 1960, the following is prescribed:

§ 1. Routes on which to monitor compliance with the maximum permitted speed by means of an imaging technical device measuring the average driving speed of a vehicle on this route (measuring distances), the following sections of the direction lane A 1 West motorway of the A 7 Mühlkreis motorway are defined:

1.

the route of

a)

km 7 of the direction lane,

b)

of km 0,23 of ramp 5 of the Wienerstraße junction,

d)

of km 0,55 of ramp 8 of the junction Linz Zentrum as well as

e)

of km 0,01 of ramp 6 of junction Muldenstraße

in each case up to km 4,5 of the direction lane;

2.

the route of

a)

km 7of the direction lane,

b)

of km 0,23 of ramp 5 of the Wienerstraße junction and

c)

of km 0,55 of ramp 8 of the junction Linz Zentrum

in each case to km 0,19 of ramp 5 of the Muldenstraße junction;

3.

the route of

a)

km 7 and from

b)

km 0,23 of ramp 5 of junction Wienerstraße

in each case up to km 0.50 of ramp 7 of the connecting point Linz Centre.

§ 2. Routes on which to monitor compliance with the maximum permitted speed by means of an imaging technical device measuring the average driving speed of a vehicle on this route (measuring distances), the following sections of the direction lane Unterweitersdorf of the A 7 Mühlkreis motorway are defined:

1.

the route of

a)

km 4,5 of the direction lane,

b)

of km 0,00 of ramp 3,

c)

of km 0,00 of ramp 4 of the junction Muldenstraße as well as

d)

of km 0,55 of ramp 8 of the junction Linz Zentrum

in each case up to km 0,10 of ramp 1 of the Wienerstraße connection point or km 7 of the direction track;

2.

the route of

a)

km 4,5 of the direction lane,

b)

of km 0,00 of ramp 3 and

c)

of km 0,00 of ramp 4 of the junction Muldenstraße

in each case up to km 0,50 of ramp 7 of the connecting point Linz Centre;

3.

the distance of km 4,5 of the direction track to km 0,21 of ramp 1 and/or km 0,19 of ramp 2 of the Muldenstraße junction.

§ 3. The beginning and the end of the monitored measuring sections shall be announced.

Stöger