Section Control Measurement Regulation Hummel Court 2014

Original Language Title: Section Control-Messstreckenverordnung Hummelhof 2014

Read the untranslated law here: http://www.ris.bka.gv.at/Dokumente/BgblAuth/BGBLA_2014_II_287/BGBLA_2014_II_287.html

287. Decree of the Federal Minister for transport, innovation and technology a section-based speed control 2014 in the area of the node of Linz-Hummel Hof of the A7 Mühlkreis Autobahn (section control measurement regulation Hummel Court 2014)

StVO 1960 is prescribed on the basis of section 98a, paragraph 1:

§ 1. Routes, where compliance with the permitted top speed with an imaging equipment with which the average speed of a vehicle on these routes is measured, is to monitor (sections), be following sections of a-1 West direction roadway the A7 Mühlkreis Autobahn motorway set: 1 the route of a) km 7 of the direction of roadway, b) 0.23 of the ramp junction Wienerstraße 5 km , d) by km 0.55 of the ramp 8 of junction Linz Centre, as well as e) km 0.01 of ramp 6 of hollow road junction until km 4.5 of roadway of of direction of;

2. the route of a) km 7 direction roadway, b) 0.23 of the ramp junction Wienerstraße 5 km and c) km 0.55 of the ramp 8 of junction Linz Centre until km 0.19 of the ramp 5 of Junction Hollow Road;

3. the route of a) km 7 and b) km 0.23 of ramp 5 of junction Wiener Straße until km 0,50 of ramp 7 of junction Linz Center.

§ 2. As routes, where compliance with the permitted top speed with an imaging equipment with which the average speed of a vehicle on these routes is measured, is to monitor (sections), be set following sections of the direction roadway Unterweitersdorf of the A7 Mühlkreis Highway: 1 the distance of a) km 4.5 of the direction roadway, b) km 0,00 of ramp 3, c) km 0,00 of ramp 4 of dump road junction as well as d) km 0.55 of the ramp 8 of junction Linz Center

until km 0.10 of the ramp 1 of junction Wiener Straße or km 7 of the roadway of of direction of;

2. the route of a) the direction roadway, b 4.5 km) km 0,00 of ramp 3 and c) km 0,00 of ramp 4 of dump road junction until km 0,50 of ramp 7 Linz junction Centre;

3. the distance of 4.5 km direction roadway up to km 0.21 of ramp 1 or km 0.19 of ramp 2 of basin road junction.

§ 3. The beginning and the end of the monitored sections are to announce.

Sands