Nonstandard boilers shall be prepared for inspection as described
in §65.210, with the following additional requirements.
(1) External lagging and insulation shall be removed
and ultrasonic thickness measurements shall be performed for the first
inspection and at five-year intervals for subsequent inspections;
and
(2) Any other inspections or examinations as required
by the department shall be performed to determine the condition of
the boiler.
Source Note: The provisions of this §65.211 adopted to be effective June 15, 2015, 40 TexReg 3121