DESIGN PLAN FEES:  

  STRUCTURAL ALTERATION $166.20

  RESUBMITTAL FEE $73.50

  ADDENDUM (Approval expires on the same date as original plan.) $73.50

  ELECTRONIC PLAN SUBMITTAL FEE $5.20 per page for the first set of plans and $1.00 per page for each additional set of plans. These fees are in addition to any applicable design plan fees required under this section.  

DEPARTMENT INSPECTION FEES:  

  Combination permit - Mechanical and electrical inspections $181.60

  Heat pump $181.60

  Air conditioning $181.60

  Air conditioning with replacement furnace $181.60

  Gas furnace installation includes gas piping $181.60

  Fire safety inspection $181.60

MECHANICAL $80.70

  Gas*** Piping $80.70

  Wood Stove $80.70

  Pellet Stove $80.70

  Gas*** Room Heater $80.70

  Gas*** Decorative Appliance $80.70

  Range: Changing from electric to gas*** $80.70

  Gas*** Water Heater Replacement $60.50

ELECTRICAL $101.00

  Electric Water Heater Replacement $101.00

  Electric Water Heater replacing Gas*** Water Heater $101.00

  Each added or modified 120 volt circuit (maximum charge is two circuits) $101.00

  Each added 240 volt circuit (for other than Heat Pumps, Air Conditioners, Furnaces, Water Heaters, Ranges, Hot Tubs or Spas) $101.00

  Hot Tub or Spa (power from home electrical panel) $101.00

  Replace main electrical panel/permanently installed transfer equipment $101.00

  Low voltage fire/intrusion alarm $101.00

  Any combination of Furnace, Range and Water Heater changing from electric to gas*** $101.00

PLUMBING  

  Fire sprinkler system $226.90

  Each added fixture $60.50

  Replacement of water piping system (this includes two inspections) $202.50

STRUCTURAL  

  Inspection as part of a mechanical/fire safety installation (cut truss/floor joist, sheet rocking) $90.60

  Reroofs (may require a plan review) $161.90

  Changes to home when additions bear loads on home per the design of a professional (also requires a plan review) $161.90

  Other structural changes (may require a plan review) $161.90

MISCELLANEOUS  

  OTHER REQUIRED INSPECTIONS (Per hour*) $66.30

  ALL REINSPECTIONS (Per hour*) $66.30

  Refund $20.10

INSIGNIA FEES:  

  REISSUED - LOST/DAMAGED $20.10

IPIA  

DEPARTMENT AUDIT FEES  

  REGULARLY SCHEDULED IPIA AUDIT:  

    First inspection on each section (one time only) $33.30

    Second and succeeding inspections of unlabeled sections (Per hour*) $73.50

  OTHER IPIA FEES:  

    Red tag removal during a regularly scheduled IPIA audit (Per hour*separate from other fees) $73.50

    Red tag removal at a time other than a regularly scheduled IPIA audit (Per hour* plus travel time* and mileage**) $73.50

    Increased frequency surveillance (Per hour* plus travel time* and mileage**) $73.50

    Attendance at manufacturers training classes (Per hour* only) $73.50

    Subpart "I" investigations (Per hour* plus travel time* and mileage**) $73.50

    Alterations to a labeled unit (Per hour* plus travel time* and mileage**) $73.50

    IPIA Issues/Responses (Per hour* Plus travel time* and mileage**) $73.50

    Monthly surveillance during a regularly scheduled IPIA audit (Per hour*plus travel time* and mileage**) $73.50

    Monthly surveillance at a time other than a regularly scheduled IPIA audit (Per hour* plus travel time* and mileage**) $73.50

    Plant certifications, recertifications and addenda updates (Per hour* plus travel time* and mileage** per each inspector) $73.50

    Response to HBT Audit during a regularly scheduled IPIA audit (Per hour*) $73.50

    Response to HBT Audit at a time other than a regularly scheduled IPIA audit (Per hour* plus travel time*and mileage**) $73.50

    Alternative construction (AC) letter inspections at placement site (Per hour* plus travel time*and mileage**) $73.50

    Replacement of HUD labels (Per hour* plus travel time* and mileage**) $73.50

    State Administrative Agency (SAA) inspection fee (Per hour* plus travel time* and mileage**) $73.50

    State Administrative Agency (SAA) dispute resolution filing fee $73.50

    State Administrative Agency (SAA) dispute resolution (Per hour*) $73.50

OTHER FEES:  

  FIELD TECHNICAL SERVICE (Per hour plus travel time* and mileage**) $68.20

  PUBLICATION PRINTING AND DISTRIBUTION OF RCWs AND WACs (One free copy per year upon request) $13.40

  VARIANCE INSPECTION FEE $161.80

  HOMEOWNER REQUESTED INSPECTION $161.80

  DECERTIFICATION OF A MOBILE/MANUFACTURED HOME $161.80

  DEMOLITION OF A MOBILE/MANUFACTURED HOME $161.80

  ENERGY CONSERVATION PERMIT $27.60

NOTE: Local jurisdictions may have other fees that apply.  

* Minimum charge of 1 hour; time spent greater than 1 hour is charged in 1/2 hour increments.  

** Per state guidelines.  

*** Gas means all gases; natural, propane, etc.  

[Statutory Authority: Chapter 43.22 RCW and 2011 1st sp.s. c 50. WSR 12-06-069, § 296-150M-3000, filed 3/6/12, effective 4/30/12. Statutory Authority: Chapters 18.106, 43.22 RCW, 2008 c 285 and c 329. WSR 08-12-042, § 296-150M-3000, filed 5/30/08, effective 6/30/08. Statutory Authority: Chapters 18.27, 18.106, 43.22, and 70.87 RCW. WSR 07-11-128, § 296-150M-3000, filed 5/22/07, effective 6/30/07. Statutory Authority: Chapter 43.22 RCW. WSR 07-05-063, § 296-150M-3000, filed 2/20/07, effective 4/1/07. Statutory Authority: Chapters 18.106, 43.22, and 70.87 RCW. WSR 06-10-066, § 296-150M-3000, filed 5/2/06, effective 6/30/06. Statutory Authority: Chapter 43.22 RCW and 2005 c 399. WSR 05-24-020, § 296-150M-3000, filed 11/29/05, effective 1/1/06. Statutory Authority: Chapters 18.27, 43.22, and 70.87 RCW. WSR 05-12-032, § 296-150M-3000, filed 5/24/05, effective 6/30/05. Statutory Authority: Chapters 18.27 and 43.22 RCW. WSR 04-12-048, § 296-150M-3000, filed 5/28/04, effective 6/30/04. Statutory Authority: RCW 43.22.340, 43.22.400, 43.22.432, 43.22.433, 43.22.434, 43.22.480, and 43.22.485, 2002 c 268, and chapter 43.22 RCW. WSR 03-12-044, § 296-150M-3000, filed 5/30/03, effective 5/30/03. Statutory Authority: RCW 43.22.350, 43.22.434, 43.22.480, 43.22.500, 18.27.070, 18.27.075, 70.87.030, 19.28.041, 19.28.051, 19.28.101, 19.28.121, 19.28.161, 19.28.201, 19.28.211, 19.28.341, 2001 c 159, and chapters 43.22, 19.28, 18.27, and 70.87 RCW. WSR 01-12-035, § 296-150M-3000, filed 5/29/01, effective 6/29/01. Statutory Authority: RCW 43.22.340, 43.22.350, 43.22.355, 43.22.360, 43.22.400, 43.22.432, 43.22.433, 43.22.434, 43.22.450, 43.22.480, and 43.22.485. WSR 00-17-148, § 296-150M-3000, filed 8/22/00, effective 9/30/00. Statutory Authority: Chapters 43.22, 18.27, 70.87 and 19.28 RCW. WSR 99-12-080, § 296-150M-3000, filed 5/28/99, effective 6/28/99. Statutory Authority: Chapters 18.106, 18.27 and 43.22 RCW. WSR 98-12-041, § 296-150M-3000, filed 5/29/98, effective 6/30/98. Statutory Authority: RCW 70.87.030, 18.27.070, [18.27.]075, 43.22.350, [43.22.]355, [43.22.]434 and [43.22.]480(2). WSR 97-11-053, § 296-150M-3000, filed 5/20/97, effective 6/30/97. Statutory Authority: RCW 43.22.340, [43.22.]355, [43.22.]360, [43.22.]432, [43.22.]440 and [43.22.]480. WSR 96-21-146, § 296-150M-3000, filed 10/23/96, effective 11/25/96.]